Waterside P3-LR 950731FUGRO-McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (214) 484-8301; Fax (214) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Standard Pacific of Texas Report Date: July 31, 1995
PROJECT: Waterside Estates #3, Coppell, Texas Project No.: O751-2031
I
CONTRACTOR: Cullum Construction
TICKET NO.: CONCRETE SUPPLIER: Pioneer
AMBIENT TEMP. (°F): PLANT/TRUCK:
CONCRETE TEMP. (oF): MIX ID NUMBER:
TIME BATCHED: AIR (%) (ASTM C-~I)
TIME SAMPLED: WATER ADDED:
WEATHER CONDITION: SLUMP (inches) (ASTM Cq4Z)
LOCATION OF PLACEMENT: Inlets top at Cove Drive, station 2+62
CYLINDER AGE DATE TOTAL LOAD COIV[PRESSIVE REQ~D COMPRESSIVE
N'UMBER (days) TESTED (pounds) STRENGTH STRENGTH
(ps0 (psi)
WSP 16 7 07/28/95 55000 1946 4000/28 days
WSP 17 28 08/18/95
WSP 18 28 08/18/95
WSP 19 Hold
Specifications: Makin{~ & Curing: ASTM C-31 Testin~ Methods: ASTM C-143, ASTM C-39
REMARKS: Cylinders cast by Contractor. All information except test data furnished by Contractor and assumed to be
correct.
Technician: Jose Rivera FUGRO-McCLELLAND (SOUTHWEST), INC.
Checked By:~~
SMH/so
Distribution: Standard Pacific of Texas - Randy Lockhart
City of Coppell - Lar~ Davis ----