Waterside P3-LR 950821FUGRO-McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (214) 484-8301; Fax (214) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Staadard Pacific of Texas Report Date: August 21, 1995
PROJECT: Waterside Estates #3, Coppell, Texas Project No.: 0751-2031
CONTRACTOR: Cullum Construction
TICKET NO.: CONCRETE SUPPLIER: Pioneer
AMBIENT TEMP. (°F): PLANT/TRUCK:
CONCRETE TEMP. (oF): MIX ID NUMBER:
TIME BATCHED: AIR (%) (AS'TM C-231)
TIME SAMPLED: WATER ADDED:
WEATHER CONDITION: SLUMP (inches) (ASTM
LOCATION OF PLACEMENT: Inlet~ top at Cove Drive, station 2+62
CYLINDER AGE DATE TOTAL LOAD COMPRESSIVE REQUIRED COMPRESSIVE
NUMBER (days) TESTED (pounds) STRENGTH STRENGTH
(psi) (psi)
WSP 16 7 07/28/95 55000 1946 4000/28 days
WSP 17 28 08/18/95 90800 3212 *
WSP 18 28 08/18/95 90000 3184 *
WSP 19 56 09/15/95
Specifications: Makin~ & Curinl~: ASTM C-31 Testin~ Methods: AS'I'M C-143, ASTM C-39
REMARKS: Cylinders cast by Contractor. All information except test data furnished by Contractor and assumed to be
correct.
· Does not meet project specifications for required compressive strength.
Technician: Jose Rivera FUGRO-McCLELLAND (SOUTHWEST), INC.
Checked By:~
SMI-Fso
Distribution: Standard Pacific of Texas - Randy Locklmrt
City of Coppell - Larry Davis ~ ~