Loading...
SS1501-SY170530 (3)2016 SSES Part 2A Fi nal Technical Memorandum Coppell, TX January 2017 I hereby certify that this report was prepared under my direct supervision and that I am a duly registered Professional Engineer under the laws of the State of Texas. Date: Registration No.: 102137 January 5, 2016 www.rjn.com 12160 Abrams Rd • Dallas, TX 75243 • 972.437.4300 • fax 972.437.2707 January 5 , 2016 Mr. Michael Garza, P.E. Assistant Director of Public Works City of Coppell 816 S. Coppell Road Coppell, TX 75019 Subject: City of Coppell, Texas 2016 Sanitary Sewer System Assessment-Part 2A Final Technical Memorandum Dear Mr. Michael: According to the December 2015 Engineering Agreement, RJN is pleased to present this final technical memorandum for the above referenced project. We appreciate the excellent cooperation from you and the City of Coppell staff throughout this project. If you have any questions regarding this submittal or you require additional information, please do not hesitate to call us. Very truly yours, RJN GROUP, INC. Daniel Jackson, P.E. Vice President DJ/DT/18-2925-00 Enclosure T a b l e o f C o n t e n t s TABLE OF CONTENTS TABLE OF CONTENTS Overview .................................................................................................................. 1 Description of the Study Area ................................................................................... 1 Project Approach ...................................................................................................... 1 Definitions and Abbreviations ................................................................................... 3 Mapping ................................................................................................................... 4 Field Investigations .................................................................................................. 4 Television Inspection .............................................................................................. 11 Determination of Inflow ......................................................................................... 14 Inflow Source Quantification .................................................................................. 14 Determination of Infiltration ................................................................................... 17 Infiltration Source Quantification ............................................................................ 17 Recommended Line Rehabilitation.......................................................................... 20 Summary of Recommended Plan ............................................................................ 22 1 Study Area ................................................................................................... 2 2 Largest Inflow Source Identified During Manhole Investigations.................. 9 3 Manholes with Surcharge Evidence .............................................................. 10 4 Manholes with Evidence of Corrosion ........................................................ ..11 1 Access Structure Inspection Summary .......................................................... 6 2 Summary of Manhole Defects ...................................................................... 6 3 Manholes with Corrosion ........................................................................... 10 4 Lines Televised .......................................................................................... 12 5 Sonar Inspections ....................................................................................... 13 6 Distribution of Inflow Sources ................................................................... 15 7 Distribution of Infiltration Sources ............................................................. 18 8 I/I Identified per Basin ............................................................................... 19 9 Recommended Manhole Rehabilitation ...................................................... 20 10 Lines Recommended for Point Repairs ....................................................... 21 11 Lines Recommended for Rehabilitation ...................................................... 21 12 Lines Recommended for Maintenance ........................................................ 22 13 Summary of Recom mended Plan ................................................................ 22 TECHNICAL MEMORANDUM PAGE LIST OF TABLES PAGE LIST OF FIGURES PAGE LIST OF Exhibits PAGE A Field Investigations B Manhole Rehabilitation Recommendations C Preliminary Recommendations for Sewer Improvements APPENDIX A – Manhole Inspection Report APPENDIX B – Visual Pipe Inspection Report APPENDIX C – Summary of Television Inspection APPENDIX D – Recommended Manhole Rehabilitation APPENDIX E – Inflow Source Report APPENDIX F – Sonar Inspections Report LIST OF Appendices PAGE T e c h n i c a l M e m o r a n d u m TECHNICAL MEMORANDUM RJN Group, Inc . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 The city of Coppell experienced a persistent increase in wastewater flows within their system that has been consistently measured at the Trinity River Authority (TRA) meter station near Belt Line Road. In the spring of 2015 RJN Group, Inc. was retained by the City of Coppell to perform a city wide flow monitoring study to establish dry and wet-weather flows and to identify excessive Infiltration and Inflow (I/I) or extraneous flow entering the system. Two sub-basins were identified as having excessive flow and as a result an evaluation of the sanitary sewer collection system by means of field investigations was performed on the interceptors with those areas. This technical memorandum contains the findings from the field investigations. Figure 1 depicts the study area. OVERVIEW A Sanitary Sewer Evaluation Study, or SSES, is a cost-effective method to evaluate the condition of sanitary sewer lines and access structures using various intensive field procedures and data analysis. Sewer lines are susceptible to I/I can be excessive, expensive to treat, and contribute to wet-weather overflows. Infiltration and Inflow may enter the sanitary sewer system during moderate storm events. Infiltration occurs when groundwater enters sewer lines and manholes. Inflow occurs when storm water runoff enters the sanitary sewer system through both public sector and private sector sources. Some inflow sources include cross connections with storm sewers, main line defects, vented manhole covers, defective frame seals, defective cleanouts, and direct connections to the sanitary sewer from downspouts and/or area drains. DESCRIPTION OF THE STUDY AREA In the spring of 2015 RJN Group developed basin boundary areas and performed flow monitoring throughout the City. Excessive I/I was identified in sub-basins COP-10 and COP- 14. After discussion with the City, it was determined that only the large diameter pipe lines located along nearby creeks be studied due to the potential to identify large I/I sources. The recommended study area included sewer infrastructure from Sub-basins COP-07, COP-10, COP-11, COP-14, and COP-15. The area is comprised primarily of residential neighborhoods and contains 75 manholes and 21,656 linear feet of sewer pipe. The study area runs along Denton Creek and Cottonwood Branch through Andrew Brown Parks which contribute flow to the Deforest Lift Station. PROJECT APPROACH The project approach for the City of Coppell Sewer study included conducting field investigations within the selected sub-basins and then developing a recommended plan to reduce I/I and improve efficiency of the wastewater collection system. The project team employed the following project approach for optimum results: TECHNICAL MEMORANDUM 2016 SSES PART 2A RJN Group, Inc . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 Field Investigations: 1. Manhole and Visual Pipe Inspections 2. Closed Circuit Television (CCTV) Inspections Data Analysis and Recommendations: The recommended plan was formulated after carefully reviewing the results derived from the field investigation results and consists of the following: 1. Recommended I/I Removal 2. Cost to Implement the Recommended Plan DEFINITIONS AND ABBREVIATIONS This section contains definitions and abbreviations commonly used throughout this report. (1) Infiltration (as defined by USEPA) - the water entering a sewer system and service connections from the ground through such means as, but not limited to, defective pipes, pipe joints, service connections, service laterals, or manhole walls. (2) Inflow (as defined by USEPA) - the water discharged into a sewer system, including service connections, from such sources as roof leaders; cellar, yard, and area drains; foundation drains; cooling water discharges; drains from springs and swampy areas; manhole covers; cross connections from storm sewers, combined sewers, or catch basins; storm waters; surface runoff; or drainage. (3) Excessive Infiltration and Inflow (I/I) - the extraneous clean water that enters the sanitary sewer system which can be eliminated on a cost-effective basis. (4) Base Flow - wastewater flow exclusive of infiltration or inflow. Generally determined from water records during months when most of the water consumption is returned to the wastewater collection system. (5) Permanent Infiltration - extraneous flow that enters the sewer system through the ground during periods of dry weather/low groundwater. Generally determined by subtracting base flow during winter months from the average daily dry-weather monitored flow. (6) Peak Infiltration - the maximum extraneous flow that enters the wastewater collection system during high groundwater conditions after the inflow effects of a rain event have ended. Generally determined by subtracting dry-weather/low-groundwater flow (average daily dry-weather monitored flow) from flow recorded during periods of high groundwater. (7) Average Daily Dry-Weather Flow - dry-weather/low-groundwater flow exclusive of dry-weather/high-groundwater (peak infiltration) and wet-weather (inflow) flow. Includes base flow and permanent infiltration only. COP-11 COP-14 COP-15 COP-10 COP-07 Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community, Esri, HERE, DeLorme, MapmyIndia, © OpenStreetMap contributors Coppell, TX Figure 1 Study AreaStudy Area Ü 0 0.25 0.5 0.75 10.125 Miles RJN Group, Inc . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 (8) Average Daily Dry-Weather Flow Peaking Factor - the ratio between the peak hourly flow rate and the average daily flow. (9) 1-Year/60-Minute Storm - a storm event that produces 1.50 inches of rain per hour in the Coppell, Texas area and is expected to occur once in any given year. (10) 5-Year/60-Minute Storm - a storm event that produces 2.55 inches of rain per hour in the Coppell, Texas area and has a 20 percent probability of occurring in a given year. (11) Design Storm Event - a storm event selected for purposes of analyzing its effect on the wastewater collection system. (12) gpd - gallons per day. (13) mgd - million gallons per day. (14) idm - inch-diameter-miles. The product of sewer pipe diameter in inches and length of sewer in feet divided by 5,280 feet. (15) gpd/idm - gallons per day per inch-diameter-mile. (16) Surcharge Condition – When the sewer flow depth equals or exceeds the diameter of the discharging sewer lines. (WEF Manual of Practice FD-6) (17) Infiltration and Inflow (I/I) – A combination of infiltration and inflow wastewater volume in sanitary sewer. MAPPING The City of Coppell staff provided map data of the wastewater collection system within the study areas at the initiation of the project that included existing access structures. Any manholes or other access structures found during field investigations that were not shown on existing maps were also assigned new numbers and GPS points were collected. FIELD INVESTIGATIONS Manhole and visual pipe inspection is the part of the survey where the physical condition of the sewer system is visually evaluated. These inspections verified manhole location, pipe size, line segment continuity, and evaluated manhole and adjacent pipe condition. A sectional elevation of a typical manhole is shown on the following page. RJN Group, Inc . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 Manhole Cover Seized (COP-14) SS1900 Manhole Inspections The manhole/cleanout inspection procedure included recording the following observations: 1. Location and identification number 2. Potential for ponding or sheeting on manhole cover 3. Cover type, fit, description, distance above or below grade, and evidence of inflow 4. Frame adjustment, seal, and evidence of inflow 5. Corbel construction, condition, evidence of inflow 6. Wall construction, condition, evidence of infiltration 7. Bench/trough construction, condition, deposition, evidence of infiltration 8. Pipe seal condition, evidence of infiltration 9. Step condition 10. Manhole inside diameter 11. Surcharging or evidence of surcharging 12. Indication of groundwater infiltration Inspections were performed on 66 of the 75 manholes (88.0 percent). A total of 9 manholes were unable to be inspected. Of the 9 manholes; access could not be obtained for 4 manholes, and 5 manholes could not be located. Every effort was made to locate and inspect every sanitary structure. Manholes not inspected are indicated on the manhole information report included in Appendix A. An access structure inspection summary is given in Table 1, while a summary of manhole defects is given in Table 2. Map Exhibit A shows the manhole inspection status. Manhole inspections resulted in the identification of 0.219 mgd of 1-year inflow and 0.024 mgd of infiltration. The largest contributors of inflow identified for this project were defective frame seals and manhole covers with pickholes. Field investigations identified 14 defective frame seals and 18 manhole covers with missing bolts and one (1) manhole wall that contributed approximately 0.211 mgd of inflow during a 1-year/60-minute rain event. RJN Group, Inc . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Table 1 Manhole Inspection Status Not Inspected Sub-Basin Manholes Inspected Not Found Inaccessible Total Manholes COP-07 13 1 0 14 COP-10 28 0 1 29 COP-11 13 1 0 14 COP-14 8 3 3 14 COP-15 4 0 0 4 Total 66 5 4 75 Table 2 Summary of Manhole Defects Type of Defect Number of Defects Inflow Defective Cover/ Pickholes 1 Defective Frame Seals 14 Broken Frame 1 Defective Corbel 4 Covers Missing Bolts 18 Defective Manhole Walls 1 Subtotal 39 Infiltration Defective Manhole Walls 14 Pipe Seals 8 Defective Bench / Trough 5 Subtotal 27 Total 66 RJN Group, Inc . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Wall Defect (COP-10) SS1070 Defective pipe seals are the main sources of infiltration. Field investigations identified eight (8) defective pipe seals contributing 0.012 mgd. Inflow and Infiltration rates can vary depending on the size of the defects and the number of defects found in a structure. The pressure head available from varying groundwater levels also can influence the rate of infiltration. The groundwater table is greater during the winter or after a spring or fall rainy season. Manhole SS1070 located in meter sub-basin COP-10 was identified as being the largest source of inflow. A large void with soil visible was identified at a joint and was estimated to be a source of approximately 0.144 mgd. Typically manhole walls are categorized as infiltration sources; however after multiple site visits this specific defect was identified to only be active after a significant rain event and was quantified as a direct inflow source from surface runoff. The photos below depict the location and observed inflow. The location of this manhole is shown on Figure 2. The City has engaged a contractor to address this structure. Surcharging evidence was identified at 5 manholes. Surcharging can be an indicator of silt/debris build up or collapsed sewer pipes that can ultimately lead to sewer overflows, or even capacity issues. The locations of these manholes are shown on Figure 3. A total of 5 manholes located throughout the study area indicated evidence of corrosion most likely from Hydrogen Sulfide gas (H2S). H2S can be attributed to long standing sewage due to insufficient slope, inverted siphons, pump stations and commonly occurs in turbulent water areas such as treatment facilities. H2S gases lead to corrosion within the sewer infrastructure. Penetration tests were performed at manholes with evidence of deterioration to determine the thickness of the corroded concrete found on the structure due to corrosive conditions and resulted in measurements from 0.08 inches to 0.50 inches. Corroded manholes are listed in Table 3 and shown on Figure 4. A detailed manhole inspection report is included in Appendix A. Area (COP-10) SS1070 Active Inflow (COP-10) SS1070 !. !. G F G F G F G F G F G F G F SS1332 SS0361 SS1070 SS2166 SS2165 SS2164 SS0393 COP-10 COP-07 Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community, Esri, HERE, DeLorme, MapmyIndia, © OpenStreetMap contributors slkjflksjdf Coppell, TX Figure 2 Largest Inflow Source Identified During Manhole Inspections Ü 0 0.02 0.04 0.06 0.08 0.10.01 Miles Study AreaGravity Mains !.Cleanouts (COP-10) SS1070 - Wall Defect 0.144 MGD !. !. !. !. !. !. !. !. !.!. !. !. !. !. !. !.!. !. !. !. !. !.!. !. !. !. !. !. !.!. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !.!. !. !. !. !. !. !. !.!. !. !.!. !. !. !. !.!. !.!. !. !. !. !. !. !. !.!. !. !. !. !. !. !.!. !. !. !. !. !. !.!.!.!.!. !. !. !.!.!.!. !. !. !. !. !. !. !.!. !. !. !. !. !.!.!.!. !.!. !. !. !. !. !. !. !.!. !.!. kj kjkj kj kj COP-10 COP-11 COP-14 COP-15 Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community, Esri, HERE, DeLorme, MapmyIndia, © OpenStreetMap contributors Coppell, TX Figure 3 Manholes With Surcharge Evidence Ü kj Evidence of Surcharging Manholes Gravity Mains Study Area SS2836 SS1144 SS1145 SS1624 SS1625 0 0.15 0.3 0.45 0.60.075 Miles RJN Group, Inc . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Table 3 Manholes with Corrosion Sub-Basin Manhole Penetration (in) COP-10 SS0307 0.08 COP-10 SS0156 0.50 COP-10 SS1412 0.30 COP-10 SS2171 0.50 COP-10 SS2172 0.50 !. !. !. !. !. !. !. !. !.!. !. !. !. !. !. !.!. !. !. !. !. !.!. !. !. !. !. !. !.!. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !.!. !. !. !. !. !. !. !.!. !. !.!. !. !. !. !.!. !.!. !. !. !. !. !. !. !.!. !. !. !. !. !. !.!. !. !. !. !. !. !.!.!.!.!. !. !. !.!.!.!. !. !. !. !. !. !. !.!. !. !. !. !. !.!.!.!. !.!. !. !. !. !. !. !. !.!. !.!. ^_^_ ^_ ^_ ^_ COP-10 COP-11 COP-14 COP-15 Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community, Esri, HERE, DeLorme, MapmyIndia, © OpenStreetMap contributors Coppell, TX Figure 4 Manholes With Evidence of Corrosion Ü ^_Corrosion Evidence Manholes Gravity Mains Study Area SS0307 SS1412 SS2172 SS0156 SS2171 0 0.15 0.3 0.45 0.60.075 Miles RJN Group, Inc . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 Joint w/Infiltration (COP-07)SS1808-W-In Visual Pipe Inspections Visual pipe inspection was also performed as part of the manhole inspection program with the following observations recorded: 1. Manhole identification numbers for connecting sewer lines. 2. Flow direction in pipes 3. Pipe diameter and construction material 4. Amount of root growth 5. Amount and type of deposition 6. Structural condition and line/grade of pipe 7. Visible infiltration in pipe and/or from pipe seals 8. Depth from manhole rim to each pipe invert 9. Recommended method of cleaning 10. Depth and velocity of flow Visual pipe inspection verifies pipe diameter, continuity, and aids in identifying pipe defects near the collection system access structure. Defects such as roots, joint offsets, circular/longitudinal cracks, and broken pipes are common among rigid pipe materials. Sewer lines observed in the study area are primarily constructed of PVC (76%), VCP (21%) along with a small amount of concrete pipe. A total of 174 pipes were inspected at the manholes where only two (2) pipes were found to be defective. A computer output report listing the findings of the visual pipe inspections is given in Appendix B. TELEVISION INSPECTION RJN reviewed data collected during field investigations and identified 18,869 linear feet of sewer line for television inspection. 2,787 linear feet was also selected for sonar inspection due to possible debris buildup in the pipe. Selections were based on results from pipe material, visual pipe defects, and locations of segments in or near low lying areas. Of the 18,869 linear feet identified, 58 line segments totaling 17,209 linear feet were able to be televised. A total of 1,660 linear feet was not inspected due to inaccessibility. A list of lines televised can be found in Table 4. Video review revealed five (5) segments of a totaling 2,370 linear feet show evidence of light roots. No immediate blockages of sewer flows are evident however it is recommended that the roots be treated and the segments be monitored again for maintenance within the next 5 years. Segment (COP-10) EOL-SS2167 was identified to have a large hole located 735 lf upstream from SS2167. This segment was under construction at the time of the inspection and has been fully replaced since the inspection. Sonar inspection was also conducted during the study as a method of inspecting full flowing sewer lines for the purposes of identifying debris and silt levels along with major pipe deformities. A total 6 line segments with an overall length of 2,787 linear feet were inspected using sonar technology. Results from the sonar inspections identified the lines to be clear of debris. A summary of sonar inspections can be found in Table 5. A computer output report listing the findings of the sonar inspections is given in Appendix F RJN Group, Inc . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Table 4 Lines Televised Basin USMH DSMH Pipe Diameter (in.) Segment Length (ft.) Actual Televised Footage (ft.) COP-07 SS0107 SS1847 36 133 133 COP-07 SS1204 SS1847 18 426 426 COP-07 SS1803 SS1808 24 103 103 COP-07 SS1807 SS1808 12 223 223 COP-07 SS1809 SS1808 36 77 77 COP-07 SS1810 SS1809 8 71 71 COP-07 SS1813 SS1809 36 499 499 COP-07 SS1816 SS0107 36 62 62 COP-07 SS1840 SS1809 8 281 281 COP-07 SS1847 SS1813 36 278 278 COP-10 EOL SS2167 8 750 732 COP-10 SS0156 SS2173 24 351 351 COP-10 SS0361 SS1070 10 237 237 COP-10 SS0393 SS1816 24 610 610 COP-10 SS1070 SS2165 24 342 342 COP-10 SS1327 SS2370 15 410 01/ COP-10 SS1333 SS1070 24 1,030 1,030 COP-10 SS1409 SS1413 30 16 16 COP-10 SS1410 SS1411 30 11 11 COP-10 SS1411 SS0156 24 282 282 COP-10 SS1412 SS1410 30 504 504 COP-10 SS1413 SS1412 30 357 357 COP-10 SS1647 SS1651 8 200 200 COP-10 SS2164 SS0393 24 470 470 COP-10 SS2165 SS2164 24 139 139 COP-10 SS2166 SS2165 8 169 169 COP-10 SS2167 SS2168 15 316 316 COP-10 SS2168 SS2169 15 277 277 COP-10 SS2169 SS2170 15 128 128 COP-10 SS2170 SS2171 15 495 495 COP-10 SS2171 SS2172 15 507 507 COP-10 SS2172 SS2173 15 279 129 COP-10 SS2370 SS2371 15 447 447 COP-10 SS2371 SS2167 15 342 342 COP-11 SS0306 SS1651 15 334 334 COP-11 SS0307 SS1328 15 168 01/ COP-11 SS0314 SS0668 10 30 30 COP-11 SS0669 SS0845 15 617 617 COP-11 SS0845 SS0846 15 284 284 COP-11 SS0846 SS1329 15 280 35 COP-11 SS1328 SS0306 15 483 483 COP-11 SS1329 SS0307 12 379 01/ 1/ Segments not televised due to inaccessibility RJN Group, Inc . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 Table 4 (cont.) Lines Televised Basin USMH DSMH Pipe Diameter (in.) Segment Length (ft.) Actual Televised Footage (ft.) COP-11 SS1651 SS1327 15 140 140 COP-11 SS2533 SS0668 10 158 158 COP-11 SS2534 SS0669 8 389 389 COP-11 SS2546 SS0307 12 263 263 COP-14 SS0155 SS0255 24 75 75 COP-14 SS0255 SS1409A 24 60 60 COP-14 SS0256 SS0155 24 508 508 COP-14 SS0327 SS1355 21 312 312 COP-14 SS0328 SS1354 24 290 01/ COP-14 SS0329 SS0328 21 613 613 COP-14 SS1144 SS1145 21 269 269 COP-14 SS1354 SS1144 21 212 212 COP-14 SS1355 SS0329 21 300 300 COP-14 SS1409A SS1409 24 183 183 COP-14 SS1617 SS1144 8 359 359 COP-14 SS1624 SS1145 12 223 223 COP-15 SS0148 SS1303 15 423 423 COP-15 SS0354 SS1304 8 196 196 COP-15 SS1303 SS1304 15 200 200 COP-15 SS1304 SS2174 15 299 299 Total 18,869 17,209 1/ Segments not televised due to inaccessibility Table 5 Sonar Inspection Basin USMH DSMH Pipe Diameter (in.) Segment Length (ft.) Volume of Debris (ft.) COP-10 SS2173 SS2174 24 24 0 COP-10 SS2174 SS2175 24 388 0 COP-10 SS2175 SS2176 24 670 0 COP-10 SS2176 SS1332A 24 138 0 COP-10 SS1332A SS1332 24 1,331 0 COP-10 SS1332 SS1333 24 236 0 Total 2,787 RJN Group, Inc . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 DETERMINATION OF INFLOW Inflow in a sanitary sewer system is defined as extraneous flow that is a direct result of storm water runoff. Inflow may enter the sanitary sewer system through directly connected downspouts, area drains, cleanouts, and building sewers. Inflow may also enter the system through direct or indirect connections between the sanitary sewers and storm drains or ditches, sewer line defects, and through defective manhole covers, frame seals, corbels and manhole walls. INFLOW SOURCE QUANTIFICATION All inflow sources identified during manhole inspections and television inspection were evaluated and quantified. Quantification of individual sources was based on a 1-year/60-minute storm and calculated using the orifice equation and rational formula. QUANTIFICATION PROCEDURE Inflow rates are typically determined by utilizing the rational equation, and the associated drainage area of each defect. The rational equation is as follows: Rational Equation: Q = CiA Q = Flow C = runoff coefficient i = Rainfall intensity A = Area Photos taken in the field assist engineers in the office to confirm the drainage area, the intensity of the smoke, and the ability of the defect to pond (rainwater pooling over a defect; ponding depth is estimated in the field). If a defect is determined to have the capability of ponding, the orifice equation can be used to determine the inflow rate. Typically, the lowest inflow rate is assigned to the defect when comparing the orifice equation to the rational equation. Orifice Equation: Q = CdA(5.37h)0.5 Q = Flow Cd = Coefficient of Discharge h = Height or head The total quantified inflow from all sources identified through field investigation was estimated to be approximately 0.291 mgd during a 1-year/60-minute design storm. The largest contributors of inflow to the sanitary collection system are defective frame seals, one (1) manhole wall and one (1) defective pipe with holes. Ninety (90%) of inflow in the study area is attributed to these source types. Due to the nature of the manhole wall and pipe defects it was determined that these two sources are direct sources of inflow which allow for significant amounts of excess flows to enter the system and were quantified as such. A summary of inflow sources is provided in Table 6 and is shown graphically on page 16. A detailed list of each source is also provided in Appendix E. RJN Group, Inc . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 DETERMINATION OF INFILTRATION Infiltration in a sanitary sewer system is defined as extraneous flow that enters the system through pipe joints, sewer line defects (including main sewer lines and building sewer lines), and defective manhole walls, benches, and pipe seals. Two types of infiltration can be determined during a study, permanent infiltration and peak infiltration. Permanent infiltration is defined as extraneous flow that enters the system through the ground during periods of dry- weather and low -groundwater. Peak infiltration is defined as the maximum extraneous flow Table 6 Distribution of Inflow Sources Source Quantity 1-Year/60-Minute Projected Peak Inflow (mgd) Percent of Inflow Manhole Defects Inflow Defective Frame Seals 14 0.037 12.71 Broken Frame 1 0 1/ 0.00 Manhole Corbel Defects 4 0.007 2.41 Defective Covers 1 0.001 0.34 Covers Missing Bolts 18 0.030 10.31 Defective Manhole Walls 1 0.144 49.48 Subtotal 39 0.219 75.26 Pipeline Defects Inflow Defective Pipe With Hole 1 0.072 24.74 Total 40 0.291 100.00 1/ Approximately 173 (gpd) 13% 0% 2% 0% 10% 50% 25% Distribution of Inflow Sources Defective Frame Seals Broken Frame Manhole Corbel Defects Defective Covers Covers Missing Bolts Defective Manhole Walls Defective Pipe With Hole RJN Group, Inc . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 that enters the sewer system during high-groundwater conditions after inflow effects of a rain event have ended. Analyses of wastewater infiltration were based on I/I source data from field investigations, specifically manhole and visual pipe inspection, and internal television inspection of sewer lines. INFILTRATION SOURCE QUANTIFICATION Each of the infiltration sources identified during field investigations was evaluated and quantified in reference to the corresponding sub-basin and line segment. The infiltration rate was estimated based on the severity of the defect. A potential infiltration rate was estimated for each manhole and pipe defect that was observed but not actively leaking. The sum of all observed infiltration sources is referred to as total identified infiltration. Total identified infiltration was quantified to be 0.038 mgd. Defective pipe seals were identified as the largest source which contributes approximately thirty-one (31%) of the total identified infiltration. The total identified infiltration is summarized by source type in Table 7 and is shown graphically on page 18. Table 7 Distribution of Infiltration Sources Source Quantity 1-Year/60-Minute Projected Peak Inflow (mgd) Percent of Inflow Manhole Defects Defective Manhole Walls 14 8,021 20.89 Defective Bench/Trough 5 4,320 11.25 Pipe Seals 8 11,822 30.79 Subtotal 27 24,163 62.94 Pipeline Defects Defective Joints 57 9,619 25.06 Pipe with Cracks 12 2,016 5.25 Pipe with Holes 3 2,160 5.63 Defective Service Connections 2 432 1.13 Subtotal 74 14,227 37.06 Total 101 38,390 100.00 1/ Based on identified infiltration RJN Group, Inc . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 A summary of identified I/I found throughout the study can be seen within Table 8. 21% 11% 31% 25% 5%6% 1% Distribution of Infiltration Sources Defective Manhole Walls Defective Bench/Trough Pipe Seals Defective Joints Pipe with Cracks Pipe with Holes Defective Service Connections RJN Group, Inc . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..19 Table 8 I/I Identified per Basin Meter Basin Number of Manholes Manholes Inspected Basin Footage (lf) Footage Inspected Basin Peak 1-year/60 Minute Inflow Rate1/ (mgd) Inflow Identifie d (mgd) Basin Peak Infiltration1/ (mgd) Infiltration Identified (mgd) COP-07 120 14 40,352 1,930 0.164 0.025 2/ 0.010 COP-10 79 29 31,481 10,749 0.698 0.241 2/ 0.015 COP-11 139 14 45,857 2,733 0.310 0.003 0.078 0.003 COP-14 140 14 37,597 3,114 5.551 0.019 1.478 0.008 COP-15 144 4 44,152 1,118 0.573 0.001 0.044 0.002 Total 199,438 19,9963/ 7.295 0.289 1.599 0.038 1/ Per flow monitoring conducted in 2015 2/ Negligible flow observed 3/ Total footage inspected by CCTV and Sonar Technology. RJN Group, Inc. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 Manhole I/I defects identified during field investigation were analyzed together to obtain recommendations for rehabilitation for each manhole and associated cost. The recommended rehabilitation for each manhole addresses both inflow and infiltration defects identified within each manhole. Of the 75 manholes studied, a total of 37 (49%) manholes are recommended for rehabilitation. A summary of manhole rehabilitation list is shown in Table 9. Individual manhole rehabilitation recommendations are included in appendix D. Manholes requiring rehabilitation are shown on Map Exhibit B. Table 9 Recommended Manhole Rehabilitation Rehabilitation Description Number of Manholes Estimated Inflow1/ (mgd) Estimated Infiltration (mgd) Construction Cost ($) Cementitious Coating 4 0.006 0.005 12,959 Cementitious Coating And Install Bolts/Gasket for Bolted Cover 1 0.000 0.001 2,068 Cementitious Coating And Internal Chimney Seal 2 0.002 0.001 4,380 Grout Lower 18" Of Manhole And Repair Bench/Trough 6 0.000 0.014 6,647 Grout Lower 18" Of Manhole And Replace Cover/Frame/Frame Seal 1 0.001 0.003 1,000 Grout Lower 18" Of Manhole, Repair Bench/Trough, And Install Internal Chimney Seal 1 0.001 0.001 1,700 Grout Walls/Joints And Install External Chimney Seal 1 0.001 0.001 1,760 Install Bolts/Gasket for Bolted Cover 14 0.027 0.000 1,400 Repair Corbel And Replace Cover/Frame/Frame Seal 1 0.015 0.001 3,100 Replace Cover/Frame/Frame Seal 6 0.020 0.000 6,300 Total 37 0.073 0.027 41,314 1/ Based on 1-year / 60-minute storm. RJN Group, Inc. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 RECOMMENDED LINE REHABILITATION Sewer I/I defects identified during CCTV review were analyzed to obtain recommendations for rehabilitation for each sewer line and its associated cost. The recommended rehabilitation for each sewer line addresses infiltration defects identified within each line. Of the 17,209 linear feet studied, 4 line segments totaling 1,596 linear feet are recommended for rehabilitation, along with 12 segments with recommended point repairs and five (5) line segments totaling 2,370 linear feet are recommended for maintenance. A summary of list of line segments that are recommended for point repairs, rehabilitation and maintenance are included in Tables 1 0-12. Sewer lines requiring rehabilitation are shown on Map Exhibits C. Table 10 Lines Recommended for Point Repairs Line Segment USMH DSMH Existing Diameter (in.) Station Estimated Construction Cost ($) I/I Removal (gpd) COP-07 SS1809 SS1808 36 0+65-0+75-US 22,000 360 COP-10 SS0156 SS2173 24 2+32-2+52-US 19,000 619 SS1070 SS2165 24 1+15-1+25-US 14,000 1,202 3+10-3+20-US 14,000 1,202 SS2164 SS0393 24 0+05-0+15-DS 15,000 360 1+75-1+85-DS 15,000 43 SS2165 SS2164 24 0+67-0+77-DS 14,000 1,151 SS2370 SS2371 15 4+20-4+30-US 10,500 144 COP-11 SS2533 SS0668 10 1+20-1+30-US 6,250 43 COP-14 SS0255 SS1409A 24 0+50-0+60-US 15,000 432 SS0256 SS0155 24 4+55-4+65-DS 15,000 389 SS0327 SS1355 21 1+05-1+15-DS 15,000 86 SS1144 SS1145 21 1+45-1+65-US 20,000 288 SS1354 SS1144 21 1+75-1+85-DS 15,000 144 Total 209,750 6,103 1/ 'US' measurements are from the upstream manhole, 'DS' measurements are from the downstream manhole. 2/ Defect identified as inflow source. RJN Group, Inc. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 SUMMARY OF RECOMMENDED PLAN The recommended plan includes 14 point repairs, 4 complete sewer line rehabilitation, and rehabilitation of 37 manholes. Approximately 0.040 mgd of infiltration will be eliminated by implementation of the recommended plan. The peak 1 -year inflow in the basins is projected to be reduced by 0.073 mgd after rehabilitation of the recommended inflow sources. The total capital cost , which includes 10% design fees and 20% contingency, to implement the recommended plan is approximately $0.586 million. The total capital cost consists of $0.532 million for sewer improvements, and $0.054 million for manhole rehabilitation. A summary of the recommended plan is given in Table 1 3. Table 11 Lines Recommended for Rehabilitation Line Segment USMH DSMH Existing Diameter (in.) Recommended Diameter (in.) Segment Length (ft.) Preliminary Rehabilitation Method I/I Removal (gpd) Estimated Construction Cost ($) COP-07 SS1803 SS1808 24 24 101 CIPP 504 10,605 COP-10 SS1333 SS1070 24 24 1,030 CIPP 691 108,150 SS1411 SS0156 24 24 282 CIPP 475 29,610 COP-14 SS1490A SS1409 24 24 183 Open Cut 4,968 51,240 Total 1,596 6,638 199,605 Table 12 Summary of Recommended Plan I/I Reduction Item Inflow 1/ (mgd) Infiltration (mgd) Estimated Capital Cost ($million) Manhole Rehabilitation 0.073 0.027 53,708 Sewer Line Rehabilitation Point Repair 0.000 0.006 272,675 Line Rehabilitation 0.000 0.007 259,487 Total 0.073 0.040 585,870 1/ Based on projected 1-year/60-minute flow 2/ Includes estimated construction cost plus a 30 percent engineering service and contingency fee. M a p E x h i b i t s MAP EXHIBITS !. !.!. !. !. !.!. !. !.!. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !.!. !. !. !. !. !. !. !. !.!. !. !. !. !. !.!.!.!.!.!. !.!.!. !. !. !. !. !. !.!. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !.!. !. !. !. !. !. !. !. !. !. !. !. !. !.!. !. !. !. !. !.!. !.!. !.!. !. !. !. !. !.!. !. !. !. !. !. !. !. !. !. !.!. !.!. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !.!.!. !.!. !. !.!.!. !. !. !. !. !. !.!.!.!.!. !. !. !.!.!.!. !. !. !.!. !. !. !.!.!. !. !. !. !. !.!. !. !. !. !. !. !. !. !. !. !. !. !. !.!. !. !. !.!. !.!. !. !. !. !.!. !. !. !. !. !. !. !. !.!.!.!. !.!. !. !. !. !. !. !. !.!. !. !. !. !. !. !. !.!.!.!.!.!.!.!. !.!.!. !. !. !. !.!. !. !.!. !.!. G F G F G F G F G F G F G F G FGF G F G F G F G F G F G FGF G F G F G F G F G F G F G F G F G F G F G F G F G F G F G F G FGFGF G F G F G F G F G F G F G F G F G F G FGF G F G F G F G F G F G F G F G F G F G F G FGFGF G F G F G F G F G F G F G F G F G F G F G F G F G FGF G F G F G F SS1803 SS1810 SS0751 SS0156 SS1304 SS1303 SS0255 SS1355 SS0329 SS0327 SS1647 SS2546 SS2836 SS0846 SS1329 SS0307 SS0306 SS1651 SS2370 SS0328 SS1354 SS2371 SS2167 SS2168 SS1144 SS1617 SS1625SS1624 SS1145 SS0256 SS0155 SS1900 SS1413 SS1412 SS1410SS1411 SS0148 SS0354 SS2169 SS2170 SS2171 SS2172 SS2173SS2174 SS0845SS0669SS0668 SS0314SS2533 SS2534 SS2175 SS2176 SS2177 SS1332 SS1333 SS0361 SS1070 SS2165 SS2164 SS0393 SS1807SS1808 SS1813 SS1809 SS1840 SS1204 SS0364SS1816 SS0107 SS1847 SS1816A Source: Esri, DigitalGlobe, GeoEye, i-cubed, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community, Esri, HERE, DeLorme, MapmyIndia, © OpenStreetMap contributors Coppell, TX Map Exhibit A Field Investigations Manhole Inspection Status G F Inaccessible G F Inspected G F Not Found Outside of Scope Ü 0 0.1 0.2 0.3 0.4 0.50.05 Miles Study AreaGravity Mains !.Cleanouts !. !.!. !. !. !.!. !. !. !.!. !. !. !. !. !. !. !. !. !. !.!. !. !. !. !. !. !. !. !. !. !. !. !. !.!. !.!. !.!. !.!.!. !. !. !. !. !. !. !. !.!. !. !. !. !. !.!.!.!.!.!. !.!.!. !. !. !. !. !. !.!. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !.!. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !.!. !. !. !. !.!. !.!. !.!. !. !.!. !. !. !. !. !.!.!. !. !.!. !. !. !. !. !. !. !. !. !. !. !. !.!. !.!. !. !. !. !. !. !.!. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !.!. !. !. !. !. !.!.!. !. !. !. !. !. !.!.!.!.!. !. !. !.!.!.!. !. !. !.!. !. !. !. !.!.!.!.!.!. !.!.!. !. !. !. !. !. !. !. !.!. !. !. !. !.!.!.!. !. !. !. !. !. !. !. !. !. !. !. !. !.!. !. !. !.!. !.!. !. !. !. !.!. !. !. !. !. !. !. !. !. !. !.!.!.!. !.!. !. !. !. !. !. !. !. !. !.!. !. !. !. !. !. !. !. !.!.!.!.!.!.!.!. !. !. !. !. !.!. !. !. !. !.!. ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !!! ! ! ! ! !! ! ! ! ! ! !! ! !! ! ! ! ! ! ! ! ! ! !!! ! ! ! ! ! ! ! ! ! ! ! ! !! ! !! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! !! ! ! ! ! ! ! !!! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! !! ! !! !! ! ! !! ! ! !! !! ! !! ! ! ! ! ! ! ! ! ! ! !!! ! ! ! ! ! ! ! ! !! ! !! ! ! ! !! ! ! !!! !!! ! !! ! ! !! ! ! ! ! ! !! ! !! ! ! ! ! !! ! ! ! ! ! ! ! !! !! ! ! ! ! ! ! ! !!!! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! !! ! ! !! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! !!! ! ! ! ! ! ! !! ! ! ! !!! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! !! !! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !!!!! ! !! ! ! ! ! ! ! ! !! ! !! ! ! ! !! !! !! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! !! ! ! ! !!!! ! ! ! !! ! ! ! ! ! ! ! ! ! !!! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! !!! ! ! !! ! ! ! ! !! ! ! ! !! !! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! !!! ! !! ! ! ! ! ! ! ! ! ! ! ! !! !!! ! ! !!! ! ! ! ! ! ! ! ! ! ! !!! !!! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! !! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! !! ! !! ! !!!!! !! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !!! ! ! ! ! ! ! ! ! ! !! ! !!!! !!! ! !!! ! ! ! !! ! ! ! ! ! ! ! ! ! !! !! ! ! ! ! ! ! ! ! ! !! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !!! ! !! !! ! ! ! ! ! ! ! !! ! ! !! ! ! !! !! ! ! !! !! ! !! ! ! ! ! ! !!! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !!! ! ! !!! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !!! !! ! ! ! ! ! ! ! !! !O XY"T!O !C kj !O XY "T!O kj !O !C !C!C !C !C kj!C "T !O"T "T !C kj "T !C !C !C kj!C!O !C "T !C kj $K !O SS1803 SS0156 SS0255 SS0846 SS1329 SS1328 SS1651 SS1327 SS2370 SS2371 SS2167 SS2168 SS1617 SS1625 SS1145 SS0155 SS1410 SS1411 SS0148 SS2169 SS2170 SS2173 SS0845SS0669SS0668 SS2533 SS2534 SS2175 SS1070 SS2166 SS2164 SS0393 SS1204 SS1816SS0107 SS1847 SS1816A Source: Esri, DigitalGlobe, GeoEye, i-cubed, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community, Esri, HERE, DeLorme, MapmyIndia, © OpenStreetMap contributors Coppell, TX Map Exhibit B Manhole Rehabilitation Recomendations Recomended Manhole Rehabilitation "T Cementitious Coating "T Cementitious Coating and Install Bolts/Gasket for Bolted Cover "T Cementitious Coating and Install Internal Chimney Seal !O Complete Manhole Rehab w/o New Frame and Cover !O Grout Lower 18" of Manhole and Repair Bench/Trough !O Grout Lower 18" of Manhole and Replace Cover/Frame/Frame Seal XY Grout Lower 18" of Manhole, Repair Bench/Trough, and Install Internal Chimney Seal XY Grout Walls/Joints and Install External Chimney Seal !C Install Bolts/Gasket for Bolted Cover $K Repair Corbel, and Replace Cover/Frame/Frame Seal kj Replace Cover/Frame/Frame Seal Ü 0 0.1 0.2 0.3 0.4 0.50.05 Miles !.Cleanouts !Manholes Gravity Mains Study Area !. !.!. !. !. !.!. !. !. !. !. !. !. !. !. !. !. !. !.!. !. !. !. !. !. !. !. !.!. !. !. !. !. !.!.!.!.!.!. !. !.!. !. !. !. !. !. !.!. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !.!. !. !. !. !. !. !. !. !. !. !. !. !.!. !. !.!. !. !. !. !. !.!. !. !. !. !. !. !. !. !.!. !.!. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !.!. !. !. !. !. !.!.!. !. !. !. !. !. !.!.!.!.!. !. !. !.!.!.!. !. !. !.!. !. !.!.!. !. !. !. !. !.!. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !. !.!. !.!. !. !. !. !.!. !. !. !. !. !. !. !.!.!.!. !. !. !. !. !.!. !. !. !. !. !. !.!.!.!.!.!.!.!. !. !.!. !. !. !. !.!. ! ! ! ! ! ! ! ! ! ! ! ! ! !!! ! ! ! ! !! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! !! !! !! ! !! !! ! ! ! ! ! ! ! ! ! ! !! ! !! ! ! ! !! ! ! ! !! !!! ! !! ! ! ! ! ! ! ! ! ! !! ! !!! ! ! ! ! ! ! ! ! ! ! ! ! ! !!! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! !! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! !!! ! ! !!! ! ! ! ! ! ! !! ! !!! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !!!!! ! !! ! ! ! ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! !!!! ! ! ! !! ! ! ! ! ! ! ! ! ! !!! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! !! ! ! ! ! !! !! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! !!! ! !! ! ! ! ! ! ! ! ! ! ! !!! !!! ! ! !!! ! ! ! ! ! ! ! ! ! ! !!! !!! ! ! !! ! ! ! ! ! ! ! ! ! ! !! !! ! ! ! !! ! ! ! ! ! !! ! ! ! ! ! !! ! !! ! !!! !! !! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! !!! ! ! ! !! ! ! ! ! ! ! ! !! !! ! ! ! ! ! ! !! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! !! ! !! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !!! !! !! !! ! ! SS2533 SS1411 SS1409 SS1355 SS1354 SS1333 SS2371 SS2370 SS2173 SS2167 SS2165 SS1809 SS1808 SS1803 SS1145SS1144 SS1070 SS0668 SS0393 SS0327 SS0256 SS0255 SS0156 SS0155 Source: Esri, DigitalGlobe, GeoEye, i-cubed, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community, Esri, HERE, DeLorme, MapmyIndia, © OpenStreetMap contributors Coppell, TX Map Exhibit C Preliminary Recommendations for sewer Improvements Sewer Rehabilitation CIPP Pipe Burst Point Repair Ü 0 0.1 0.2 0.3 0.4 0.50.05 Miles !.Cleanouts !Manholes Gravity Mains Study Area SS1409A A p p e n d i c e s APPENDICES APPENDIX A MANHOLE INSPECTION REPORT Ma n h o l e Nu m b e r /S t r e e t Lo c a t i o n D i a m . D e p t h Su b j . Po n d . Wa l l Co n s t . Wa l l Co n d i t i o n Co v e r Ty p e Su r c h a r g e Infilt. Inflow Ma n h o l e (i n . ) ( f t . ) (gpd) (gpd) Pr o j e c t N o . 18 - 2 9 2 5 - 0 0 Co p p e l l , T X 2 0 1 5 S S E S P a r t 2 A Ad d r e s s Ev i d e n c e Ma n h o l e I n s p e c t i o n R e p o r t GL E N L A K E S D R Gr a s s E s m t P re c a s t S o u n d (C O P - 0 7 ) S S 0 1 0 7 6 2 3 1,152 720 No No 60 2 0 . 0 Co n c e a l e d PH I L L I P S D R N o t F o u n d N/ A N / A (C O P - 0 7 ) S S 0 3 6 4 6 1 6 No No N/ A N / A N/ A DE F O R E S T R D Gr a s s E s m t Po u r e d S o u n d (C O P - 0 7 ) S S 0 7 5 1 6 7 6 No No 72 2 7 . 0 Co n c e a l e d LA K E P A R K D R Gr a s s E s m t Pr e c a s t S o u n d (C O P - 0 7 ) S S 1 2 0 4 6 2 7 20,811 Ye s No 48 1 8 . 1 Bo l t s M i s s i n g GL E N L A K E S D R G r a s s E s m t Po u r e d S o u n d (C O P - 0 7 ) S S 1 8 0 3 4 0 0 1,037 Ye s No 48 2 4 . 7 Co n c e a l e d N M A C A R T H U R B L V D G r a s s E s m t Pr e c a s t S o u n d (C O P - 0 7 ) S S 1 8 0 7 6 3 5 1,440 No No 48 1 5 . 3 Co n c e a l e d DE F O R E S T R D Gr a s s E s m t Pr e c a s t S o u n d (C O P - 0 7 ) S S 1 8 0 8 6 7 3 No No 60 2 5 . 5 Co n c e a l e d GL E N L A K E S D R G u t t e r Po u r e d S o u n d (C O P - 0 7 ) S S 1 8 0 9 6 6 3 No No 48 2 4 . 5 Co n c e a l e d GL E N L A K E S D R G r a s s E s m t Po u r e d S o u n d (C O P - 0 7 ) S S 1 8 1 0 6 5 9 Ye s No 48 1 5 . 0 Co n c e a l e d GL E N L A K E S D R C e n t e r S t r e e t Pr e c a s t S o u n d (C O P - 0 7 ) S S 1 8 1 3 6 3 4 720 No No 48 2 3 . 5 Co n c e a l e d GL E N L A K E S D R G r a s s E s m t Pr e c a s t L e a k i n g J o i n t s (C O P - 0 7 ) S S 1 8 1 6 6 2 3 2,117 893 No No 48 2 3 . 3 Co n c e a l e d GL E N L A K E S D R G r a s s E s m t Pr e c a s t S o u n d (C O P - 0 7 ) S S 1 8 1 6 A 6 2 3 1,037 No No 48 2 3 . 3 Co n c e a l e d DE F O R E S T R D Gr a s s E s m t Pr e c a s t S o u n d (C O P - 0 7 ) S S 1 8 4 0 6 6 1 No No 48 1 7 . 3 Co n c e a l e d GL E N L A K E S D R G r a s s E s m t Pr e c a s t S o u n d (C O P - 0 7 ) S S 1 8 4 7 6 2 3 3,600 No No 60 2 2 . 4 Bo l t s i n H o l e s We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 1 of 10 Ma n h o l e Nu m b e r /S t r e e t Lo c a t i o n D i a m . D e p t h Su b j . Po n d . Wa l l Co n s t . Wa l l Co n d i t i o n Co v e r Ty p e Su r c h a r g e Infilt. Inflow Ma n h o l e (i n . ) ( f t . ) (gpd) (gpd) Pr o j e c t N o . 18 - 2 9 2 5 - 0 0 Co p p e l l , T X 2 0 1 5 S S E S P a r t 2 A Ad d r e s s Ev i d e n c e Ma n h o l e I n s p e c t i o n R e p o r t To t a l s f o r B a s i n CO P - 0 7 To t a l M a n h o l e s 14 8,942 24,584 Ma n h o l e s B u r i e d 0 Ma n h o l e s I n s p e c t e d 13 Ma n h o l e s N o t I n s p e c t e d 1 Ma n h o l e s N o t F o u n d 1 Ma n h o l e s I n a c c e s s i b l e 0 Lo c a t i o n N o t S p e c i f i e d 1 In s p e c t e d 92 . 8 6 % In a c c e s s i b l e 0. 0 0 % No t I n s p e c t e d 7. 1 4 % Bu r i e d 0. 0 0 % No t F o u n d 7. 1 4 % Ev i d e n c e o f S u r c h a r g e 0 Su r c h a r g e 0. 0 0 % Su b j e c t t o P o n d i n g 3 Po n d i n g 21 . 4 3 % Su b j e c t t o S h e e t i n g 6 Sh e e t i n g 42 . 8 6 % Pe r c e n t : We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 Page 2 of 10 Ma n h o l e Nu m b e r /S t r e e t Lo c a t i o n D i a m . D e p t h Su b j . Po n d . Wa l l Co n s t . Wa l l Co n d i t i o n Co v e r Ty p e Su r c h a r g e Infilt. Inflow Ma n h o l e (i n . ) ( f t . ) (gpd) (gpd) Pr o j e c t N o . 18 - 2 9 2 5 - 0 0 Co p p e l l , T X 2 0 1 5 S S E S P a r t 2 A Ad d r e s s Ev i d e n c e Ma n h o l e I n s p e c t i o n R e p o r t RU S T I C M E A D O W W A Y D i t c h P ou r e d S o u n d (C O P - 1 0 ) S S 0 1 5 6 2 0 4 14,688 No No 48 1 3 . 6 Co n c e a l e d PA R K V I E W P L Gr a s s E s m t Pr e c a s t S o u n d (C O P - 1 0 ) S S 0 3 6 1 5 1 6 No No 48 1 4 . 2 Co n c e a l e d PH I L L I P S D R P a v e d E s m t Pr e c a s t S o u n d (C O P - 1 0 ) S S 0 3 9 3 4 5 7 2,880 No No 48 2 1 . 9 Co n c e a l e d N M O O R E R D Gr a s s E s m t Po u r e d C r a c k e d (C O P - 1 0 ) S S 1 0 7 0 5 2 3 1,440 144,000 No No 60 1 4 . 4 Co n c e a l e d CO P P E R S T O N E T R A I L G r a s s E s m t Po u r e d S o u n d (C O P - 1 0 ) S S 1 3 2 7 4 3 0 432 No No 48 1 4 . 1 Bo l t s M i s s i n g W A T E R V I E W D R Gr a s s E s m t Pr e c a s t R o o t s (C O P - 1 0 ) S S 1 3 3 2 3 4 9 360 No No 48 2 0 . 1 Co n c e a l e d TX - 1 2 1 G r a s s E s m t Po u r e d S o u n d (C O P - 1 0 ) S S 1 3 3 3 2 0 0 No No 48 2 0 . 6 Co n c e a l e d FL I N T S H I R E D R N o t F o u n d N/ A N / A (C O P - 1 0 ) S S 1 4 0 9 1 0 0 No No N/ A N / A N/ A RU S T I C M E A D O W W A Y G r a s s E s m t Po u r e d C r a c k e d (C O P - 1 0 ) S S 1 4 1 0 1 4 0 720 1,440 No No 60 1 2 . 6 Co n c e a l e d RU S T I C M E A D O W W A Y G r a s s E s m t Po u r e d S o u n d (C O P - 1 0 ) S S 1 4 1 1 1 4 0 720 No No 60 1 3 . 2 Co n c e a l e d FL I N T S H I R E W A Y G r a s s E s m t Po u r e d C r a c k e d (C O P - 1 0 ) S S 1 4 1 2 1 1 6 360 No No 60 1 4 . 6 Co n c e a l e d FL I N T S H I R E W A Y G r a s s E s m t Pr e c a s t S o u n d (C O P - 1 0 ) S S 1 4 1 3 1 0 0 No No 60 1 5 . 4 Co n c e a l e d CO P P E R S T O N E C T G r a s s E s m t Pr e c a s t S o u n d (C O P - 1 0 ) S S 1 6 4 7 4 3 4 No No 48 1 4 . 0 Co n c e a l e d PA R K W O O D L N G r a s s E s m t Pr e c a s t L e a k i n g J o i n t s (C O P - 1 0 ) S S 2 1 6 4 4 2 0 720 720 No No 48 1 8 . 9 Co n c e a l e d N M O O R E R D Gr a s s E s m t Po u r e d C r a c k e d (C O P - 1 0 ) S S 2 1 6 5 5 2 8 360 No No 48 1 7 . 5 Co n c e a l e d N M O O R E R D Ce n t e r S t r e e t Pr e c a s t S o u n d (C O P - 1 0 ) S S 2 1 6 6 4 2 4 1,440 No No 48 1 1 . 8 Co n c e a l e d N D E N T O N T A P R D G r a s s E s m t Po u r e d S o u n d (C O P - 1 0 ) S S 2 1 6 7 3 7 5 432 No No 48 1 5 . 1 Bo l t s M i s s i n g N D E N T O N T A P R D G r a s s E s m t Po u r e d S o u n d (C O P - 1 0 ) S S 2 1 6 8 5 7 5 432 No No 48 1 6 . 1 Bo l t s M i s s i n g N D E N T O N T A P R D C e n t e r S t r e e t Po u r e d S o u n d (C O P - 1 0 ) S S 2 1 6 9 5 7 5 1,728 No No 48 1 9 . 9 Bo l t s M i s s i n g N D E N T O N T A P R D G r a s s E s m t Po u r e d S o u n d (C O P - 1 0 ) S S 2 1 7 0 5 4 6 1,152 No No 48 1 8 . 3 Bo l t s M i s s i n g N D E N T O N T A P R D G r a s s E s m t Po u r e d C r a c k e d (C O P - 1 0 ) S S 2 1 7 1 3 6 0 360 No No 48 1 1 . 6 Co n c e a l e d RU S T I C M E A D O W W A Y G r a s s E s m t Po u r e d C r a c k e d (C O P - 1 0 ) S S 2 1 7 2 2 0 8 360 1,152 No No 48 1 6 . 9 Bo l t s M i s s i n g RU S T I C M E A D O W W A Y G r a s s E s m t Po u r e d S o u n d (C O P - 1 0 ) S S 2 1 7 3 2 1 6 432 No No 60 1 6 . 2 Bo l t s M i s s i n g RU S T I C M E A D O W W A Y G r a s s E s m t Pr e c a s t S o u n d (C O P - 1 0 ) S S 2 1 7 4 2 1 6 No No 60 1 3 . 9 Co n c e a l e d NA T C H E S T R A C E G r a s s E s m t Po u r e d S o u n d (C O P - 1 0 ) S S 2 1 7 5 2 5 0 1,440 No No 48 1 4 . 8 Co n c e a l e d We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 3 of 10 Ma n h o l e Nu m b e r /S t r e e t Lo c a t i o n D i a m . D e p t h Su b j . Po n d . Wa l l Co n s t . Wa l l Co n d i t i o n Co v e r Ty p e Su r c h a r g e Infilt. Inflow Ma n h o l e (i n . ) ( f t . ) (gpd) (gpd) Pr o j e c t N o . 18 - 2 9 2 5 - 0 0 Co p p e l l , T X 2 0 1 5 S S E S P a r t 2 A Ad d r e s s Ev i d e n c e Ma n h o l e I n s p e c t i o n R e p o r t LY N D S I E D R Gr a s s E s m t P re c a s t S o u n d (C O P - 1 0 ) S S 2 1 7 6 2 7 3 No No 48 1 0 . 5 Co n c e a l e d PA R K W A Y B L V D Gr a s s E s m t Pr e c a s t S o u n d (C O P - 1 0 ) S S 2 1 7 7 2 3 4 No No 48 6 . 3 Co n c e a l e d N D E N T O N T A P R D G r a s s E s m t Po u r e d S o u n d (C O P - 1 0 ) S S 2 3 7 0 3 8 5 1,152 No No 48 1 2 . 1 Bo l t s M i s s i n g N D E N T O N T A P R D G r a s s E s m t Po u r e d S o u n d (C O P - 1 0 ) S S 2 3 7 1 3 6 3 432 No No 48 1 4 . 8 Bo l t s M i s s i n g To t a l s f o r B a s i n CO P - 1 0 To t a l M a n h o l e s 29 8,280 171,072 Ma n h o l e s B u r i e d 0 Ma n h o l e s I n s p e c t e d 28 Ma n h o l e s N o t I n s p e c t e d 1 Ma n h o l e s N o t F o u n d 0 Ma n h o l e s I n a c c e s s i b l e 1 Lo c a t i o n N o t S p e c i f i e d 1 In s p e c t e d 96 . 5 5 % In a c c e s s i b l e 3. 4 5 % No t I n s p e c t e d 3. 4 5 % Bu r i e d 0. 0 0 % No t F o u n d 0. 0 0 % Ev i d e n c e o f S u r c h a r g e 0 Su r c h a r g e 0. 0 0 % Su b j e c t t o P o n d i n g 0 Po n d i n g 0. 0 0 % Su b j e c t t o S h e e t i n g 5 Sh e e t i n g 17 . 2 4 % Pe r c e n t : We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 Page 4 of 10 Ma n h o l e Nu m b e r /S t r e e t Lo c a t i o n D i a m . D e p t h Su b j . Po n d . Wa l l Co n s t . Wa l l Co n d i t i o n Co v e r Ty p e Su r c h a r g e Infilt. Inflow Ma n h o l e (i n . ) ( f t . ) (gpd) (gpd) Pr o j e c t N o . 18 - 2 9 2 5 - 0 0 Co p p e l l , T X 2 0 1 5 S S E S P a r t 2 A Ad d r e s s Ev i d e n c e Ma n h o l e I n s p e c t i o n R e p o r t CO P P E R S T O N E T R A I L N o t F o u n d N /A N / A (C O P - 1 1 ) S S 0 3 0 6 4 4 6 No No N/ A N / A N/ A CO P P E R S T O N E T R A I L G r a s s E s m t Po u r e d S o u n d (C O P - 1 1 ) S S 0 3 0 7 4 6 6 No No 48 1 1 . 2 Co n c e a l e d GI F F O R D C T Gr a s s E s m t Po u r e d C r a c k e d (C O P - 1 1 ) S S 0 3 1 4 6 2 1 360 No No 48 1 1 . 1 Co n c e a l e d GI F F O R D C T Gr a s s E s m t Po u r e d S o u n d (C O P - 1 1 ) S S 0 6 6 8 6 2 1 1,152 No No 48 1 0 . 6 Bo l t s M i s s i n g GI F F O R D C T Gr a s s E s m t Po u r e d S o u n d (C O P - 1 1 ) S S 0 6 6 9 6 2 1 288 No No 48 1 0 . 8 Bo l t s M i s s i n g GI F F O R D C T Gr a s s E s m t Po u r e d S o u n d (C O P - 1 1 ) S S 0 8 4 5 7 0 0 432 No No 48 1 1 . 0 Bo l t s M i s s i n g GI F F O R D C T Gr a s s E s m t Po u r e d S o u n d (C O P - 1 1 ) S S 0 8 4 6 7 0 0 432 No No 48 8 . 2 Bo l t s M i s s i n g CO P P E R S T O N E T R A I L G r a s s E s m t Po u r e d S o u n d (C O P - 1 1 ) S S 1 3 2 8 4 6 6 432 No No 48 1 0 . 8 Bo l t s M i s s i n g LA Y T O N D R G r a s s E s m t Po u r e d C r a c k e d (C O P - 1 1 ) S S 1 3 2 9 5 2 0 1,440 432 No No 48 1 2 . 3 Bo l t s M i s s i n g CO P P E R S T O N E T R A I L G r a s s E s m t Po u r e d S o u n d (C O P - 1 1 ) S S 1 6 5 1 4 3 4 720 No No 60 1 4 . 1 Co n c e a l e d GI F F O R D C T Gr a s s E s m t Pr e c a s t S o u n d (C O P - 1 1 ) S S 2 5 3 3 6 2 1 288 No No 48 5 . 3 Bo l t s M i s s i n g W E S T M I N S T E R C T G r a s s E s m t Po u r e d S o u n d (C O P - 1 1 ) S S 2 5 3 4 6 1 5 720 No No 48 1 6 . 9 Co n c e a l e d LA Y T O N D R C e n t e r S t r e e t Pr e c a s t S o u n d (C O P - 1 1 ) S S 2 5 4 6 5 0 4 No No 48 1 4 . 1 Co n c e a l e d W I N D S O R D R Gr a s s E s m t Po u r e d S o u n d (C O P - 1 1 ) S S 2 8 3 6 U N K No Yes 48 6 . 3 Bo l t s i n H o l e s We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 5 of 10 Ma n h o l e Nu m b e r /S t r e e t Lo c a t i o n D i a m . D e p t h Su b j . Po n d . Wa l l Co n s t . Wa l l Co n d i t i o n Co v e r Ty p e Su r c h a r g e Infilt. Inflow Ma n h o l e (i n . ) ( f t . ) (gpd) (gpd) Pr o j e c t N o . 18 - 2 9 2 5 - 0 0 Co p p e l l , T X 2 0 1 5 S S E S P a r t 2 A Ad d r e s s Ev i d e n c e Ma n h o l e I n s p e c t i o n R e p o r t To t a l s f o r B a s i n CO P - 1 1 To t a l M a n h o l e s 14 3,240 3,456 Ma n h o l e s B u r i e d 0 Ma n h o l e s I n s p e c t e d 13 Ma n h o l e s N o t I n s p e c t e d 1 Ma n h o l e s N o t F o u n d 1 Ma n h o l e s I n a c c e s s i b l e 0 Lo c a t i o n N o t S p e c i f i e d 1 In s p e c t e d 92 . 8 6 % In a c c e s s i b l e 0. 0 0 % No t I n s p e c t e d 7. 1 4 % Bu r i e d 0. 0 0 % No t F o u n d 7. 1 4 % Ev i d e n c e o f S u r c h a r g e 1 Su r c h a r g e 7. 1 4 % Su b j e c t t o P o n d i n g 0 Po n d i n g 0. 0 0 % Su b j e c t t o S h e e t i n g 2 Sh e e t i n g 14 . 2 9 % Pe r c e n t : We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 Page 6 of 10 Ma n h o l e Nu m b e r /S t r e e t Lo c a t i o n D i a m . D e p t h Su b j . Po n d . Wa l l Co n s t . Wa l l Co n d i t i o n Co v e r Ty p e Su r c h a r g e Infilt. Inflow Ma n h o l e (i n . ) ( f t . ) (gpd) (gpd) Pr o j e c t N o . 18 - 2 9 2 5 - 0 0 Co p p e l l , T X 2 0 1 5 S S E S P a r t 2 A Ad d r e s s Ev i d e n c e Ma n h o l e I n s p e c t i o n R e p o r t N D E N T O N T A P R D G r a s s E s m t P re c a s t R o o t s (C O P - 1 4 ) S S 0 1 5 5 3 5 3 360 2,520 No No 48 9 . 7 Co n c e a l e d N D E N T O N T A P R D Di t c h Pr e c a s t S o u n d (C O P - 1 4 ) S S 0 2 5 5 4 2 9 14,400 No No 48 N / A Co n c e a l e d W P A R K W A Y B L V D N o t F o u n d N/ A N / A (C O P - 1 4 ) S S 0 2 5 6 1 8 8 No No N/ A N / A N/ A CO T T O N W O O D D R N o t F o u n d N/ A N / A (C O P - 1 4 ) S S 0 3 2 7 1 5 0 No No N/ A N / A N/ A MA R T E L L N No t F o u n d N/ A N / A (C O P - 1 4 ) S S 0 3 2 8 4 0 1 No No N/ A N / A N/ A CO T T O N W O O D D R N o t F o u n d N/ A N / A (C O P - 1 4 ) S S 0 3 2 9 1 5 0 No No N/ A N / A N/ A MA R T E L L N Di t c h Pr e c a s t S o u n d (C O P - 1 4 ) S S 1 1 4 4 3 1 1 No Yes 48 7 . 8 Bo l t s i n H o l e s W P A R K W A Y B L V D G r a s s E s m t Pr e c a s t S o u n d (C O P - 1 4 ) S S 1 1 4 5 1 8 5 288 No Yes 48 8 . 6 Bo l t s M i s s i n g MA R T E L L N No t F o u n d N/ A N / A (C O P - 1 4 ) S S 1 3 5 4 3 0 0 No No N/ A N / A N/ A W I N D I N G H O L L O W L N D i t c h Po u r e d S o u n d (C O P - 1 4 ) S S 1 3 5 5 2 6 7 No No 48 N / A Bo l t s i n H o l e s MA R T E L L N Gr a s s E s m t Pr e c a s t L e a k i n g J o i n t s (C O P - 1 4 ) S S 1 6 1 7 3 1 1 1,757 1,080 No No 48 1 2 . 5 Co n c e a l e d CO W B O Y D R G r a s s E s m t Po u r e d S o u n d (C O P - 1 4 ) S S 1 6 2 4 U N K No Yes 48 1 0 . 1 Co n c e a l e d PA R K W A Y B L V D Gr a s s E s m t Po u r e d S o u n d (C O P - 1 4 ) S S 1 6 2 5 1 8 5 720 No Yes 48 6 . 5 Co n c e a l e d N D E N T O N T A P R D N o t F o u n d N/ A N / A (C O P - 1 4 ) S S 1 9 0 0 3 5 3 No No N/ A N / A N/ A We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 7 of 10 Ma n h o l e Nu m b e r /S t r e e t Lo c a t i o n D i a m . D e p t h Su b j . Po n d . Wa l l Co n s t . Wa l l Co n d i t i o n Co v e r Ty p e Su r c h a r g e Infilt. Inflow Ma n h o l e (i n . ) ( f t . ) (gpd) (gpd) Pr o j e c t N o . 18 - 2 9 2 5 - 0 0 Co p p e l l , T X 2 0 1 5 S S E S P a r t 2 A Ad d r e s s Ev i d e n c e Ma n h o l e I n s p e c t i o n R e p o r t To t a l s f o r B a s i n CO P - 1 4 To t a l M a n h o l e s 14 2,117 19,008 Ma n h o l e s B u r i e d 0 Ma n h o l e s I n s p e c t e d 8 Ma n h o l e s N o t I n s p e c t e d 6 Ma n h o l e s N o t F o u n d 3 Ma n h o l e s I n a c c e s s i b l e 3 Lo c a t i o n N o t S p e c i f i e d 6 In s p e c t e d 57 . 1 4 % In a c c e s s i b l e 21 . 4 3 % No t I n s p e c t e d 42 . 8 6 % Bu r i e d 0. 0 0 % No t F o u n d 21 . 4 3 % Ev i d e n c e o f S u r c h a r g e 4 Su r c h a r g e 28 . 5 7 % Su b j e c t t o P o n d i n g 0 Po n d i n g 0. 0 0 % Su b j e c t t o S h e e t i n g 1 Sh e e t i n g 7. 1 4 % Pe r c e n t : We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 Page 8 of 10 Ma n h o l e Nu m b e r /S t r e e t Lo c a t i o n D i a m . D e p t h Su b j . Po n d . Wa l l Co n s t . Wa l l Co n d i t i o n Co v e r Ty p e Su r c h a r g e Infilt. Inflow Ma n h o l e (i n . ) ( f t . ) (gpd) (gpd) Pr o j e c t N o . 18 - 2 9 2 5 - 0 0 Co p p e l l , T X 2 0 1 5 S S E S P a r t 2 A Ad d r e s s Ev i d e n c e Ma n h o l e I n s p e c t i o n R e p o r t PA R K W A Y B L V D Gr a s s E s m t P re c a s t C r a c k e d (C O P - 1 5 ) S S 0 1 4 8 2 3 4 1,152 720 No No 48 1 5 . 2 Co n c e a l e d CR O O K E D T R E E C T G u t t e r Bl o c k S o u n d (C O P - 1 5 ) S S 0 3 5 4 3 2 9 No No 48 1 2 . 3 Co n c e a l e d CR O O K E D T R E E C T I n a c c e s s i b l e Po u r e d C r a c k e d (C O P - 1 5 ) S S 1 3 0 3 3 3 2 432 No No 48 1 4 . 8 Co n c e a l e d CR O O K E D T R E E C T I n a c c e s s i b l e Po u r e d S o u n d (C O P - 1 5 ) S S 1 3 0 4 3 3 6 Ye s No 48 1 4 . 1 Co n c e a l e d To t a l s f o r B a s i n CO P - 1 5 To t a l M a n h o l e s 4 1,584 720 Ma n h o l e s B u r i e d 0 Ma n h o l e s I n s p e c t e d 4 Ma n h o l e s N o t I n s p e c t e d 0 Ma n h o l e s N o t F o u n d 0 Ma n h o l e s I n a c c e s s i b l e 0 Lo c a t i o n N o t S p e c i f i e d 0 In s p e c t e d 10 0 . 0 0 % In a c c e s s i b l e 0. 0 0 % No t I n s p e c t e d 0. 0 0 % Bu r i e d 0. 0 0 % No t F o u n d 0. 0 0 % Ev i d e n c e o f S u r c h a r g e 0 Su r c h a r g e 0. 0 0 % Su b j e c t t o P o n d i n g 1 Po n d i n g 25 . 0 0 % Su b j e c t t o S h e e t i n g 3 Sh e e t i n g 75 . 0 0 % Pe r c e n t : We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 Page 9 of 10 Ma n h o l e Nu m b e r /S t r e e t Lo c a t i o n D i a m . D e p t h Su b j . Po n d . Wa l l Co n s t . Wa l l Co n d i t i o n Co v e r Ty p e Su r c h a r g e Infilt. Inflow Ma n h o l e (i n . ) ( f t . ) (gpd) (gpd) Pr o j e c t N o . 18 - 2 9 2 5 - 0 0 Co p p e l l , T X 2 0 1 5 S S E S P a r t 2 A Ad d r e s s Ev i d e n c e Ma n h o l e I n s p e c t i o n R e p o r t To t a l I n f i l t r a t i o n = 24,163 To t a l I n f l o w = 218,840 To t a l M a n h o l e s 75 Ma n h o l e s B u r i e d 0 Ma n h o l e s I n s p e c t e d 66 Ma n h o l e s N o t I n s p e c t e d 9 Ma n h o l e s N o t F o u n d 5 Ma n h o l e s I n a c c e s s i b l e 4 Lo c a t i o n N o t S p e c i f i e d 9 In s p e c t e d 88 . 0 0 % In a c c e s s i b l e 5. 3 3 % No t I n s p e c t e d 12 . 0 0 % Bu r i e d 0. 0 0 % No t F o u n d 6. 6 7 % Ev i d e n c e o f S u r c h a r g e 5 Su r c h a r g e 6. 6 7 % Su b j e c t t o P o n d i n g 4 Po n d i n g 5. 3 3 % Su b j e c t t o S h e e t i n g 17 Sh e e t i n g 22 . 6 7 % Pe r c e n t : To t a l s f o r A l l B a s i n s We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 Page 10 of 10 APPENDIX B VISUAL PIPE INSPECTION REPORT Co n n e c t i n g Li n e S e g m e n t Di a m Co n s t r u c t i o n R o o t Gr o w t h De p o s i t i o n St r u c t u r a l Co n d i t i o n Vi s u a l I n f i l t . De p t h V e l o c i t y Ob s e r v e d (i n . ) -- - - - - - - - - - - - P I P E - - - - - - - - - - - - Ty p e D ep t h (i n . ) (fps) Di r . (g p m ) Pr o j e c t N o . 18 - 2 9 2 5 - 0 0 Co p p e l l , T X 2 0 1 5 S S E S P a r t 2 A (i n . ) R im to Invert (ft.) St r u c t u r e Nu m b e r Vi s u a l P i p e I n s p e c t i o n R e p o r t PV C Mu d Go o d N o 3. S - I n (C O P - 0 7 ) S S 0 1 0 7 0 3. 0 18 9. 5 0 . 1 19.7 (C O P - 0 7 ) S S 0 3 6 4 PV C N/ A Go o d No 2. S E - I n 0 N/ A 36 11 . 0 4 . 5 19.9 (C O P - 0 7 ) S S 1 8 1 6 PV C N/ A Go o d No 1. N - O u t 0 N/ A 36 12 . 0 4 . 0 20.1 (C O P - 0 7 ) S S 1 8 4 7 Ot h e r N/ A Go o d No 3. N - I n (C O P - 0 7 ) S S 0 7 5 1 0 N/ A 12 N/ A N / A 26.0 (C O P - 0 7 ) P l u g g e d PV C N/ A Go o d No 1. E - O u t 0 N/ A 32 7. 0 4 . 0 27.3 (C O P - 0 7 ) S S 0 7 5 0 PV C N/ A Go o d No 2. S - I n 0 N/ A 32 6. 0 4 . 0 26.9 (C O P - 0 7 ) S S 1 8 0 8 PV C N/ A Go o d No 2. N W - I n (C O P - 0 7 ) S S 1 2 0 4 0 N/ A 18 3. 5 2 . 5 18.1 (C O P - 0 7 ) S S 0 6 2 7 PV C N/ A Go o d No 1. S - O u t 0 N/ A 18 3. 5 2 . 5 18.2 (C O P - 0 7 ) S S 1 8 4 7 PV C N/ A Go o d No 2. N E - I n (C O P - 0 7 ) S S 1 8 0 3 0 N/ A 8 0. 0 0 . 0 18.2 (C O P - 0 7 ) E O L PV C N/ A Go o d No 3. S E - I n 0 N/ A 8 0. 5 1 . 0 23.2 (C O P - 0 7 ) S S 1 8 0 4 Vi t r i f i e d C l a y N/ A Go o d No 1. N - O u t 0 N/ A 20 8. 0 0 . 5 24.9 (C O P - 0 7 ) S S 1 8 0 8 Vi t r i f i e d C l a y N/ A Ci r c u l a r C r a c k s No 4. E - I n 0 N/ A 20 7. 0 0 . 0 24.9 (C O P - 0 7 ) S S 2 0 9 3 PV C Mu d Go o d No 2. N E - I n (C O P - 0 7 ) S S 1 8 0 7 0 1. 0 12 N/ A N / A 15.3 (C O P - 0 7 ) S S 1 0 8 4 PV C N/ A Go o d No 1. S W - O u t 0 N/ A 12 2. 0 3 . 0 15.3 (C O P - 0 7 ) S S 1 8 0 8 PV C N/ A Go o d No 3. N E - I n 0 N/ A 10 2. 0 3 . 0 15.1 (C O P - 0 7 ) U N K Vi t r i f i e d C l a y N/ A Go o d No 1. N - O u t (C O P - 0 7 ) S S 1 8 0 8 0 N/ A 24 13 . 0 6 . 0 25.5 (C O P - 0 7 ) S S 0 7 5 1 Vi t r i f i e d C l a y N/ A Go o d No 3. S - I n 0 N/ A 24 13 . 5 3 . 0 25.4 (C O P - 0 7 ) S S 1 8 0 3 PV C N/ A Go o d No 2. N E - I n 0 N/ A 12 2. 0 6 . 0 25.0 (C O P - 0 7 ) S S 1 8 0 7 Co n c r e t e Gr a v e l Ci r c u l a r C r a c k s No 4. W - I n 0 2. 0 36 14 . 0 3 . 5 25.4 (C O P - 0 7 ) S S 1 8 0 9 PV C N/ A Go o d No 1. N E - O u t (C O P - 0 7 ) S S 1 8 0 9 0 N/ A 36 8. 8 6 . 0 24.5 (C O P - 0 7 ) S S 1 8 0 8 PV C N/ A Go o d No 2. S W - I n 0 N/ A 8 0. 2 3 . 0 17.4 (C O P - 0 7 ) S S 1 8 1 0 PV C N/ A Go o d No 3. W - I n 0 N/ A 36 9. 5 5 . 0 24.5 (C O P - 0 7 ) S S 1 8 1 3 PV C N/ A Go o d No 4. N W - I n 0 N/ A 8 1. 0 6 . 0 17.4 (C O P - 0 7 ) S S 1 8 4 0 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 Page 1 of 9 1. " S V C " - S e v i c e L a t e r a l / B u i l d i n g L a t e r a l C o n n e c t i o n 2. " E O L " - E n d o f L i n e o r L i n e h a s n o S t r u c t u r e C o n n e c t i o n Co n n e c t i n g Li n e S e g m e n t Di a m Co n s t r u c t i o n R o o t Gr o w t h De p o s i t i o n St r u c t u r a l Co n d i t i o n Vi s u a l I n f i l t . De p t h V e l o c i t y Ob s e r v e d (i n . ) -- - - - - - - - - - - - P I P E - - - - - - - - - - - - Ty p e D ep t h (i n . ) (fps) Di r . (g p m ) Pr o j e c t N o . 18 - 2 9 2 5 - 0 0 Co p p e l l , T X 2 0 1 5 S S E S P a r t 2 A (i n . ) R im to Invert (ft.) St r u c t u r e Nu m b e r Vi s u a l P i p e I n s p e c t i o n R e p o r t PV C N/ A Go o d N o 1. E - O u t (C O P - 0 7 ) S S 1 8 1 0 0 N/ A 10 2. 0 1 . 0 15.1 (C O P - 0 7 ) S S 1 8 0 9 PV C N/ A Go o d No 2. W - I n 0 N/ A 10 2. 0 1 . 0 14.9 (C O P - 0 7 ) S S 1 8 1 1 PV C N/ A Go o d No 1. E - O u t (C O P - 0 7 ) S S 1 8 1 3 0 N/ A 36 13 . 0 3 . 0 23.5 (C O P - 0 7 ) S S 1 8 0 9 PV C N/ A Go o d No 2. W - I n 0 N/ A 36 13 . 0 3 . 0 23.4 (C O P - 0 7 ) S S 1 8 4 7 PV C N/ A Go o d No 1. N W - O u t (C O P - 0 7 ) S S 1 8 1 6 0 N/ A 36 12 . 0 5 . 0 23.9 (C O P - 0 7 ) S S 0 1 0 7 PV C N/ A Go o d No 3. S W - I n 0 N/ A 24 9. 3 5 . 0 23.3 (C O P - 0 7 ) S S 0 3 9 3 PV C N/ A Go o d No 2. N E - I n 0 N/ A 24 9. 5 0 . 4 23.3 (C O P - 0 7 ) S S 1 8 1 6 A PV C N/ A Go o d No 2. E - I n (C O P - 0 7 ) S S 1 8 1 6 A 0 N/ A 24 N/ A N / A 23.4 (C O P - 0 7 ) P L U G G E D PV C N/ A Go o d No 1. S W - O u t 0 N/ A 24 7. 5 1 . 0 23.3 (C O P - 0 7 ) S S 1 8 1 6 PV C N/ A Go o d No 3. S E - I n 0 N/ A 10 7. 0 1 . 5 23.3 (C O P - 0 7 ) U N K PV C N/ A Go o d No 1. S E - O u t (C O P - 0 7 ) S S 1 8 4 0 0 N/ A 8 1. 5 2 . 0 17.3 (C O P - 0 7 ) S S 1 8 0 9 PV C N/ A Go o d No 2. N W - I n 0 N/ A 8 1. 5 2 . 0 17.2 (C O P - 0 7 ) S S 1 8 3 9 PV C N/ A Go o d No 2. S - I n (C O P - 0 7 ) S S 1 8 4 7 0 N/ A 36 11 . 0 4 . 0 22.3 (C O P - 0 7 ) S S 0 1 0 7 PV C N/ A Go o d No 3. N - I n 0 N/ A 18 25 . 0 5 . 0 21.0 (C O P - 0 7 ) S S 1 2 0 4 PV C N/ A Go o d No 1. E - O u t 0 N/ A 36 11 . 0 5 . 0 22.5 (C O P - 0 7 ) S S 1 8 1 3 To t a l S e g m e n t s 3 8 Go o d 3 6 L o n g C r a c k 0 Ci r c u l a r C r a c 2 Br o k e n 0 Co l l a p s e d 0 N/ A 0 St r u c t u r a l C o n d i t i o n To t a l F o o t a g e Vi t r i f i e d C l a y N / A G o o d No 2. N E - I n (C O P - 1 0 ) S S 0 1 5 6 0 N/ A 25 7. 0 2 . 0 13.4 (C O P - 1 0 ) S S 1 4 1 1 Vi t r i f i e d C l a y N/ A Go o d No 1. N E - O u t 0 N/ A 25 7. 0 2 . 0 13.7 (C O P - 1 0 ) S S 2 1 7 3 PV C N/ A Go o d No 1. S E - O u t (C O P - 1 0 ) S S 0 3 0 7 0 N/ A 15 6. 0 2 . 5 11.3 (C O P - 1 0 ) S S 1 3 2 8 PV C N/ A Go o d No 3. N W - I n 0 N/ A 12 3. 0 4 . 0 11.1 (C O P - 1 0 ) S S 1 3 2 9 PV C N/ A Go o d No 2. S W - I n 0 N/ A 12 3. 0 4 . 0 10.6 (C O P - 1 0 ) S S 2 5 4 6 PV C N/ A Go o d No 2. W - I n (C O P - 1 0 ) S S 0 3 1 4 0 N/ A 10 3. 0 0 . 3 11.2 (C O P - 1 0 ) S S 0 3 1 3 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 Page 2 of 9 1. " S V C " - S e v i c e L a t e r a l / B u i l d i n g L a t e r a l C o n n e c t i o n 2. " E O L " - E n d o f L i n e o r L i n e h a s n o S t r u c t u r e C o n n e c t i o n Co n n e c t i n g Li n e S e g m e n t Di a m Co n s t r u c t i o n R o o t Gr o w t h De p o s i t i o n St r u c t u r a l Co n d i t i o n Vi s u a l I n f i l t . De p t h V e l o c i t y Ob s e r v e d (i n . ) -- - - - - - - - - - - - P I P E - - - - - - - - - - - - Ty p e D ep t h (i n . ) (fps) Di r . (g p m ) Pr o j e c t N o . 18 - 2 9 2 5 - 0 0 Co p p e l l , T X 2 0 1 5 S S E S P a r t 2 A (i n . ) R im to Invert (ft.) St r u c t u r e Nu m b e r Vi s u a l P i p e I n s p e c t i o n R e p o r t Co n c r e t e N/ A Go o d N o 1. S E - O u t (C O P - 1 0 ) S S 0 3 1 4 0 N/ A 10 3. 0 0 . 3 11.2 (C O P - 1 0 ) S S 0 6 6 8 PV C N/ A Go o d No 2. S W - I n (C O P - 1 0 ) S S 0 3 6 1 0 N/ A 10 3. 0 6 . 5 14.2 (C O P - 1 0 ) S S 0 1 4 7 PV C N/ A Go o d No 1. N W - O u t 0 N/ A 10 3. 5 6 . 5 14.3 (C O P - 1 0 ) S S 1 0 7 0 PV C N/ A Go o d No 1. N E - O u t (C O P - 1 0 ) S S 0 3 9 3 0 N/ A 24 9. 0 3 . 5 22.0 (C O P - 1 0 ) S S 1 8 1 6 Vi t r i f i e d C l a y N/ A Go o d No 2. S W - I n 0 N/ A 24 12 . 0 3 . 0 21.8 (C O P - 1 0 ) S S 2 1 6 4 PV C N/ A Go o d No 4. N W - I n (C O P - 1 0 ) S S 0 6 6 8 0 N/ A 10 3. 0 1 . 5 10.2 (C O P - 1 0 ) S S 0 3 1 4 PV C N/ A Go o d No 1. E - O u t 0 N/ A 15 6. 0 4 . 0 11.9 (C O P - 1 0 ) S S 0 6 6 9 PV C N/ A Go o d No 3. W - I n 0 N/ A 10 3. 0 2 . 0 11.9 (C O P - 1 0 ) S S 1 3 3 0 PV C N/ A Go o d No 2. S - I n 0 N/ A 10 3. 0 1 . 0 10.6 (C O P - 1 0 ) S S 2 5 3 3 PV C N/ A Go o d No 3. W - I n (C O P - 1 0 ) S S 0 6 6 9 0 N/ A 15 6. 0 2 . 0 10.8 (C O P - 1 0 ) S S 0 6 6 8 PV C N/ A Go o d No 1. E - O u t 0 N/ A 15 6. 0 3 . 0 10.9 (C O P - 1 0 ) S S 0 8 4 5 PV C N/ A Go o d No 2. S - I n 0 N/ A 8 2. 0 1 . 0 10.8 (C O P - 1 0 ) S S 2 5 3 4 PV C N/ A Go o d No 2. W - I n (C O P - 1 0 ) S S 0 8 4 5 0 N/ A 15 6. 0 2 . 0 11.0 (C O P - 1 0 ) S S 0 6 6 9 PV C N/ A Go o d No 1. E - O u t 0 N/ A 15 6. 0 2 . 0 11.1 (C O P - 1 0 ) S S 0 8 4 6 PV C N/ A Go o d No 2. W - I n (C O P - 1 0 ) S S 0 8 4 6 0 N/ A 15 5. 0 1 . 0 8.1 (C O P - 1 0 ) S S 0 8 4 5 PV C N/ A Go o d No 1. S E - O u t 0 N/ A 15 5. 0 1 . 0 8.2 (C O P - 1 0 ) S S 1 3 2 9 Vi t r i f i e d C l a y N/ A Go o d No 3. N E - I n 0 N/ A 12 5. 0 0 . 5 8.2 (C O P - 1 0 ) S S 2 8 3 6 PV C N/ A Go o d No 3. W - I n (C O P - 1 0 ) S S 1 0 7 0 0 N/ A 12 N/ A N / A 7.5 (C O P - 1 0 ) P L U G G E D PV C N/ A Go o d No 2. S E - I n 0 N/ A 10 3. 0 9 . 0 8.5 (C O P - 1 0 ) S S 0 3 6 1 Co n c r e t e N/ A Go o d No 4. N W - I n 0 N/ A 24 15 . 0 4 . 0 14.3 (C O P - 1 0 ) S S 1 3 3 3 Vi t r i f i e d C l a y N/ A Go o d No 1. N E - O u t 0 N/ A 24 14 . 0 4 . 5 14.6 (C O P - 1 0 ) S S 2 1 6 5 PV C N/ A Go o d No 2. W - I n (C O P - 1 0 ) S S 1 3 2 7 0 N/ A 15 4. 5 3 . 0 14.0 (C O P - 1 0 ) S S 1 6 5 1 PV C N/ A Go o d No 1. E - O u t 0 N/ A 15 5. 0 3 . 0 14.1 (C O P - 1 0 ) S S 2 3 7 0 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 Page 3 of 9 1. " S V C " - S e v i c e L a t e r a l / B u i l d i n g L a t e r a l C o n n e c t i o n 2. " E O L " - E n d o f L i n e o r L i n e h a s n o S t r u c t u r e C o n n e c t i o n Co n n e c t i n g Li n e S e g m e n t Di a m Co n s t r u c t i o n R o o t Gr o w t h De p o s i t i o n St r u c t u r a l Co n d i t i o n Vi s u a l I n f i l t . De p t h V e l o c i t y Ob s e r v e d (i n . ) -- - - - - - - - - - - - P I P E - - - - - - - - - - - - Ty p e D ep t h (i n . ) (fps) Di r . (g p m ) Pr o j e c t N o . 18 - 2 9 2 5 - 0 0 Co p p e l l , T X 2 0 1 5 S S E S P a r t 2 A (i n . ) R im to Invert (ft.) St r u c t u r e Nu m b e r Vi s u a l P i p e I n s p e c t i o n R e p o r t PV C N/ A Go o d N o 1. S E - O u t (C O P - 1 0 ) S S 1 3 2 8 0 N/ A 15 3. 0 2 . 0 10.1 (C O P - 1 0 ) S S 0 3 0 6 PV C N/ A Go o d No 2. N W - I n 0 N/ A 15 3. 0 2 . 0 10.1 (C O P - 1 0 ) S S 0 3 0 7 PV C N/ A Go o d No 1. S E - O u t (C O P - 1 0 ) S S 1 3 2 9 0 N/ A 15 3. 5 3 . 0 12.4 (C O P - 1 0 ) S S 0 3 0 7 PV C N/ A Go o d No 2. N W - I n 0 N/ A 15 3. 5 3 . 0 12.3 (C O P - 1 0 ) S S 0 8 4 6 Vi t r i f i e d C l a y N/ A Go o d No 1. N E - O u t (C O P - 1 0 ) S S 1 3 3 2 0 N/ A 24 13 . 0 4 . 0 20.2 (C O P - 1 0 ) S S 1 3 3 3 Vi t r i f i e d C l a y N/ A Go o d No 2. S W - I n 0 N/ A 24 13 . 0 4 . 0 20.1 (C O P - 1 0 ) S S 2 1 7 6 Vi t r i f i e d C l a y N/ A Go o d No 1. S E - O u t (C O P - 1 0 ) S S 1 3 3 3 0 N/ A 24 23 . 0 4 . 0 20.7 (C O P - 1 0 ) S S 1 0 7 0 Vi t r i f i e d C l a y N/ A Go o d No 2. S W - I n 0 N/ A 24 13 . 0 4 . 0 20.6 (C O P - 1 0 ) S S 1 3 3 2 PV C N/ A Go o d No 1. E - O u t (C O P - 1 0 ) S S 1 4 1 0 0 N/ A 30 16 . 0 4 . 0 12.9 (C O P - 1 0 ) S S 1 4 1 1 PV C N/ A Go o d No 2. S W - I n 0 N/ A 30 15 . 0 4 . 0 12.5 (C O P - 1 0 ) S S 1 4 1 2 Vi t r i f i e d C l a y N/ A Go o d No 1. N E - O u t (C O P - 1 0 ) S S 1 4 1 1 0 N/ A 24 8. 0 5 . 0 13.3 (C O P - 1 0 ) S S 0 1 5 6 PV C N/ A Go o d No 2. W - I n 0 N/ A 30 10 . 0 4 . 5 13.1 (C O P - 1 0 ) S S 1 4 1 0 PV C N/ A Go o d No 1. N E - O u t (C O P - 1 0 ) S S 1 4 1 2 0 N/ A 30 16 . 0 3 . 5 14.7 (C O P - 1 0 ) S S 1 4 1 0 PV C N/ A Go o d No 2. S W - I n 0 N/ A 30 16 . 0 3 . 5 14.6 (C O P - 1 0 ) S S 1 4 1 3 PV C N/ A Go o d No 2. S W - I n (C O P - 1 0 ) S S 1 4 1 3 0 N/ A 30 18 . 0 1 . 8 15.1 (C O P - 1 0 ) S S 1 4 0 9 PV C N/ A Go o d No 1. N E - O u t 0 N/ A 30 19 . 0 2 . 0 15.6 (C O P - 1 0 ) S S 1 4 1 2 PV C N/ A Go o d No 3. S W - I n (C O P - 1 0 ) S S 1 6 4 7 0 N/ A 8 0. 3 0 . 3 9.8 (C O P - 1 0 ) E O L PV C N/ A Go o d No 4. N W - I n 0 N/ A 8 1. 0 5 . 0 13.3 (C O P - 1 0 ) S S 1 6 4 5 PV C N/ A Go o d No 2. S E - I n 0 N/ A 8 1. 5 3 . 5 14.0 (C O P - 1 0 ) S S 1 6 4 8 PV C N/ A Go o d No 1. N E - O u t 0 N/ A 8 1. 5 4 . 5 14.5 (C O P - 1 0 ) S S 1 6 5 1 PV C N/ A Go o d No 3. W - I n (C O P - 1 0 ) S S 1 6 5 1 0 N/ A 15 4. 0 2 . 5 14.1 (C O P - 1 0 ) S S 0 3 0 6 PV C N/ A Go o d No 1. E - O u t 0 N/ A 15 4. 0 2 . 5 14.1 (C O P - 1 0 ) S S 1 3 2 7 PV C N/ A Go o d No 2. S W - I n 0 N/ A 8 6. 0 0 . 5 14.0 (C O P - 1 0 ) S S 1 6 4 7 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 Page 4 of 9 1. " S V C " - S e v i c e L a t e r a l / B u i l d i n g L a t e r a l C o n n e c t i o n 2. " E O L " - E n d o f L i n e o r L i n e h a s n o S t r u c t u r e C o n n e c t i o n Co n n e c t i n g Li n e S e g m e n t Di a m Co n s t r u c t i o n R o o t Gr o w t h De p o s i t i o n St r u c t u r a l Co n d i t i o n Vi s u a l I n f i l t . De p t h V e l o c i t y Ob s e r v e d (i n . ) -- - - - - - - - - - - - P I P E - - - - - - - - - - - - Ty p e D ep t h (i n . ) (fps) Di r . (g p m ) Pr o j e c t N o . 18 - 2 9 2 5 - 0 0 Co p p e l l , T X 2 0 1 5 S S E S P a r t 2 A (i n . ) R im to Invert (ft.) St r u c t u r e Nu m b e r Vi s u a l P i p e I n s p e c t i o n R e p o r t Vi t r i f i e d C l a y N/ A Go o d N o 1. N E - O u t (C O P - 1 0 ) S S 2 1 6 4 0 N/ A 24 7. 0 6 . 0 19.0 (C O P - 1 0 ) S S 0 3 9 3 Vi t r i f i e d C l a y N/ A Go o d No 2. S W - I n 0 N/ A 24 9. 0 2 . 5 18.9 (C O P - 1 0 ) S S 2 1 6 5 Vi t r i f i e d C l a y N/ A Go o d No 3. S W - I n (C O P - 1 0 ) S S 2 1 6 5 0 N/ A 24 13 . 0 4 . 0 17.5 (C O P - 1 0 ) S S 1 0 7 0 Vi t r i f i e d C l a y N/ A Go o d No 1. N E - O u t 0 N/ A 24 13 . 0 4 . 0 17.6 (C O P - 1 0 ) S S 2 1 6 4 PV C N/ A Go o d No 2. S E - I n 0 N/ A 8 0. 5 2 . 0 9.7 (C O P - 1 0 ) S S 2 1 6 6 PV C N/ A Go o d No 2. N E - I n (C O P - 1 0 ) S S 2 1 6 6 0 N/ A 8 0. 5 0 . 5 11.7 (C O P - 1 0 ) S S 2 1 6 3 PV C N/ A Go o d No 1. N W - O u t 0 N/ A 8 0. 5 0 . 5 11.8 (C O P - 1 0 ) S S 2 1 6 5 PV C N/ A Go o d No 2. S - I n (C O P - 1 0 ) S S 2 1 6 7 0 N/ A 8 0. 2 0 . 1 9.4 (C O P - 1 0 ) E O L PV C N/ A Go o d No 1. S E - O u t 0 N/ A 15 4. 5 2 . 0 15.3 (C O P - 1 0 ) S S 2 1 6 8 PV C N/ A Go o d No 3. N W - I n 0 N/ A 15 4. 0 2 . 0 15.1 (C O P - 1 0 ) S S 2 3 7 1 PV C N/ A Go o d No 2. N W - I n (C O P - 1 0 ) S S 2 1 6 8 0 N/ A 15 4. 0 2 . 0 16.0 (C O P - 1 0 ) S S 2 1 6 7 PV C N/ A Go o d No 1. S E - O u t 0 N/ A 15 4. 0 2 . 0 16.2 (C O P - 1 0 ) S S 2 1 6 9 PV C N/ A Go o d No 2. N W - I n (C O P - 1 0 ) S S 2 1 6 9 0 N/ A 15 6. 0 1 . 5 19.9 (C O P - 1 0 ) S S 2 1 6 8 PV C N/ A Go o d No 1. E - O u t 0 N/ A 15 6. 0 1 . 5 20.0 (C O P - 1 0 ) S S 2 1 7 0 PV C N/ A Go o d No 2. W - I n (C O P - 1 0 ) S S 2 1 7 0 0 N/ A 15 13 . 0 0 . 5 18.3 (C O P - 1 0 ) S S 2 1 6 9 PV C Mu d Go o d No 1. E - O u t 0 10 . 0 15 14 . 0 0 . 5 18.4 (C O P - 1 0 ) S S 2 1 7 1 PV C Gr a v e l Go o d No 2. W - I n (C O P - 1 0 ) S S 2 1 7 1 0 1. 0 15 7. 0 3 . 0 11.6 (C O P - 1 0 ) S S 2 1 7 0 PV C Gr a v e l Go o d No 1. E - O u t 0 1. 0 15 7. 0 3 . 0 11.7 (C O P - 1 0 ) S S 2 1 7 2 PV C Gr a v e l Go o d No 2. N W - I n (C O P - 1 0 ) S S 2 1 7 2 0 1. 0 15 7. 0 2 . 5 16.9 (C O P - 1 0 ) S S 2 1 7 1 PV C Gr a v e l Go o d No 1. S E - O u t 0 1. 0 15 7. 0 2 . 5 16.9 (C O P - 1 0 ) S S 2 1 7 3 Vi t r i f i e d C l a y N/ A Go o d No 2. S W - I n (C O P - 1 0 ) S S 2 1 7 3 0 N/ A 24 6. 5 3 . 5 16.2 (C O P - 1 0 ) S S 0 1 5 6 PV C N/ A Go o d No 3. N W - I n 0 N/ A 15 4. 0 3 . 0 16.2 (C O P - 1 0 ) S S 2 1 7 2 Vi t r i f i e d C l a y N/ A Go o d No 1. N E - O u t 0 N/ A 24 7. 0 3 . 5 16.3 (C O P - 1 0 ) S S 2 1 7 4 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 Page 5 of 9 1. " S V C " - S e v i c e L a t e r a l / B u i l d i n g L a t e r a l C o n n e c t i o n 2. " E O L " - E n d o f L i n e o r L i n e h a s n o S t r u c t u r e C o n n e c t i o n Co n n e c t i n g Li n e S e g m e n t Di a m Co n s t r u c t i o n R o o t Gr o w t h De p o s i t i o n St r u c t u r a l Co n d i t i o n Vi s u a l I n f i l t . De p t h V e l o c i t y Ob s e r v e d (i n . ) -- - - - - - - - - - - - P I P E - - - - - - - - - - - - Ty p e D ep t h (i n . ) (fps) Di r . (g p m ) Pr o j e c t N o . 18 - 2 9 2 5 - 0 0 Co p p e l l , T X 2 0 1 5 S S E S P a r t 2 A (i n . ) R im to Invert (ft.) St r u c t u r e Nu m b e r Vi s u a l P i p e I n s p e c t i o n R e p o r t PV C N/ A Go o d N o 2. S E - I n (C O P - 1 0 ) S S 2 1 7 4 0 N/ A 15 3. 0 4 . 0 13.5 (C O P - 1 0 ) S S 1 3 0 4 Vi t r i f i e d C l a y N/ A Go o d No 3. S W - I n 0 N/ A 24 7. 0 3 . 5 13.9 (C O P - 1 0 ) S S 2 1 7 3 Vi t r i f i e d C l a y N/ A Go o d No 1. N E - O u t 0 N/ A 24 7. 0 3 . 5 14.0 (C O P - 1 0 ) S S 2 1 7 5 Vi t r i f i e d C l a y N/ A Go o d No 2. S W - I n (C O P - 1 0 ) S S 2 1 7 5 0 N/ A 24 9. 0 3 . 5 14.7 (C O P - 1 0 ) S S 2 1 7 4 Vi t r i f i e d C l a y N/ A Go o d No 1. N E - O u t 0 N/ A 24 9. 0 3 . 5 14.8 (C O P - 1 0 ) S S 2 1 7 6 Vi t r i f i e d C l a y N/ A Go o d No 1. N E - O u t (C O P - 1 0 ) S S 2 1 7 6 0 N/ A 24 10 . 0 3 . 5 10.6 (C O P - 1 0 ) S S 1 3 3 2 Vi t r i f i e d C l a y N/ A Go o d No 3. S W - I n 0 N/ A 24 9. 0 3 . 5 10.5 (C O P - 1 0 ) S S 2 1 7 5 PV C N/ A Go o d No 2. S E - I n 0 N/ A 8 0. 5 0 . 5 9.4 (C O P - 1 0 ) S S 2 1 7 7 PV C N/ A Go o d No 1. N W - O u t (C O P - 1 0 ) S S 2 1 7 7 0 N/ A 8 0. 5 0 . 5 6.7 (C O P - 1 0 ) S S 2 1 7 6 PV C N/ A Go o d No 2. S - I n 0 N/ A 6 0. 2 0 . 5 5.9 (C O P - 1 0 ) S V C PV C N/ A Go o d No 3. S W - I n 0 N/ A 6 0. 3 0 . 5 5.8 (C O P - 1 0 ) S V C PV C N/ A Go o d No 2. W - I n (C O P - 1 0 ) S S 2 3 7 0 0 N/ A 15 4. 0 4 . 5 12.1 (C O P - 1 0 ) S S 1 3 2 7 PV C N/ A Go o d No 1. E - O u t 0 N/ A 15 4. 0 4 . 5 12.1 (C O P - 1 0 ) S S 2 3 7 1 PV C N/ A Go o d No 1. S E - O u t (C O P - 1 0 ) S S 2 3 7 1 0 N/ A 15 3. 0 5 . 0 14.9 (C O P - 1 0 ) S S 2 1 6 7 PV C N/ A Go o d No 2. N W - I n 0 N/ A 15 3. 0 5 . 0 14.8 (C O P - 1 0 ) S S 2 3 7 0 PV C N/ A Go o d No 1. N - O u t (C O P - 1 0 ) S S 2 5 3 3 0 N/ A 10 2. 0 1 . 0 5.5 (C O P - 1 0 ) S S 0 6 6 8 PV C N/ A Go o d No 2. S W - I n 0 N/ A 10 2. 0 1 . 0 5.4 (C O P - 1 0 ) S S 2 5 3 2 N/ A N/ A Go o d No 3. W - I n (C O P - 1 0 ) S S 2 5 3 4 0 N/ A 8 N/ A N / A 16.9 (C O P - 1 0 ) P L U G G E D PV C N/ A Go o d No 1. N - O u t 0 N/ A 8 2. 0 1 . 0 16.9 (C O P - 1 0 ) S S 0 6 6 9 PV C N/ A Go o d No 2. N E - I n 0 N/ A 8 1. 5 1 . 0 15.8 (C O P - 1 0 ) S S 1 6 4 0 PV C N/ A Go o d No 1. N E - O u t (C O P - 1 0 ) S S 2 5 4 6 0 N/ A 8 2. 5 3 . 5 14.2 (C O P - 1 0 ) S S 0 3 0 7 PV C N/ A Go o d No 3. S - I n 0 N/ A 8 2. 5 3 . 0 13.9 (C O P - 1 0 ) S S 1 6 3 6 PV C N/ A Go o d No 4. W - I n 0 N/ A 8 1. 0 1 . 5 11.1 (C O P - 1 0 ) S S 2 5 4 5 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 Page 6 of 9 1. " S V C " - S e v i c e L a t e r a l / B u i l d i n g L a t e r a l C o n n e c t i o n 2. " E O L " - E n d o f L i n e o r L i n e h a s n o S t r u c t u r e C o n n e c t i o n Co n n e c t i n g Li n e S e g m e n t Di a m Co n s t r u c t i o n R o o t Gr o w t h De p o s i t i o n St r u c t u r a l Co n d i t i o n Vi s u a l I n f i l t . De p t h V e l o c i t y Ob s e r v e d (i n . ) -- - - - - - - - - - - - P I P E - - - - - - - - - - - - Ty p e D ep t h (i n . ) (fps) Di r . (g p m ) Pr o j e c t N o . 18 - 2 9 2 5 - 0 0 Co p p e l l , T X 2 0 1 5 S S E S P a r t 2 A (i n . ) R im to Invert (ft.) St r u c t u r e Nu m b e r Vi s u a l P i p e I n s p e c t i o n R e p o r t PV C N/ A Go o d N o 5. N W - I n (C O P - 1 0 ) S S 2 5 4 6 0 N/ A 4 0. 1 0 . 1 0.0 (C O P - 1 0 ) S V C PV C N/ A Go o d No 2. E - I n 0 N/ A 4 0. 2 0 . 2 0.0 (C O P - 1 0 ) S V C PV C N/ A Go o d No 1. S W - O u t (C O P - 1 0 ) S S 2 8 3 6 0 N/ A 12 2. 0 0 . 5 6.4 (C O P - 1 0 ) S S 0 8 4 6 PV C N/ A Go o d No 2. N E - I n 0 N/ A 12 1. 0 0 . 8 6.3 (C O P - 1 0 ) S S 2 8 3 4 To t a l S e g m e n t s 1 0 2 Go o d 1 0 2 L o n g C r a c k 0 Ci r c u l a r C r a c 0 Br o k e n 0 Co l l a p s e d 0 N/ A 0 St r u c t u r a l C o n d i t i o n To t a l F o o t a g e Vi t r i f i e d C l a y N / A G o o d No 1. N E - O u t (C O P - 1 4 ) S S 0 1 5 5 0 N/ A 24 13 . 0 2 . 5 10.0 (C O P - 1 4 ) S S 0 2 5 5 Vi t r i f i e d C l a y N/ A Go o d No 2. S W - I n 0 N/ A 24 13 . 0 2 . 5 9.6 (C O P - 1 4 ) S S 0 2 5 6 Vi t r i f i e d C l a y N/ A Go o d No 3. S W - I n (C O P - 1 4 ) S S 0 2 5 5 0 N/ A 22 12 . 0 2 . 0 9.9 (C O P - 1 4 ) S S 0 1 5 5 Vi t r i f i e d C l a y N/ A Go o d No 1. N E - O u t 0 N/ A 22 12 . 0 2 . 0 10.0 (C O P - 1 4 ) S S 1 4 0 9 PV C N/ A Go o d No 2. S - I n 0 N/ A 10 4. 0 1 . 0 9.2 (C O P - 1 4 ) S S 1 9 0 0 Vi t r i f i e d C l a y N/ A Go o d No 1. E - O u t (C O P - 1 4 ) S S 1 1 4 4 0 N/ A 24 4. 0 2 . 0 7.8 (C O P - 1 4 ) S S 1 1 4 5 Vi t r i f i e d C l a y N/ A Go o d No 2. N W - I n 0 N/ A 24 3. 5 1 . 5 7.8 (C O P - 1 4 ) S S 1 3 5 4 PV C N/ A Go o d No 3. N E - I n 0 N/ A 8 1. 5 4 . 0 5.9 (C O P - 1 4 ) S S 1 6 1 7 Vi t r i f i e d C l a y N/ A Go o d No 1. E - O u t (C O P - 1 4 ) S S 1 1 4 5 0 N/ A 24 12 . 0 1 . 5 8.6 (C O P - 1 4 ) S S 0 2 5 6 Vi t r i f i e d C l a y N/ A Go o d No 3. W - I n 0 N/ A 12 12 . 0 1 . 5 8.5 (C O P - 1 4 ) S S 1 1 4 4 PV C N/ A Go o d No 2. S - I n 0 N/ A 12 3. 0 3 . 0 7.8 (C O P - 1 4 ) S S 1 6 2 4 Vi t r i f i e d C l a y N/ A Go o d No 2. S W - I n (C O P - 1 4 ) S S 1 3 5 5 0 N/ A 22 8. 0 2 . 0 11.3 (C O P - 1 4 ) S S 0 3 2 7 Vi t r i f i e d C l a y N/ A Go o d No 1. N E - O u t 0 N/ A 22 8. 0 2 . 0 11.3 (C O P - 1 4 ) S S 0 3 2 9 PV C Gr a v e l Go o d No 3. E - I n (C O P - 1 4 ) S S 1 6 1 7 0 1. 0 8 2. 5 0 . 1 9.6 (C O P - 1 4 ) E O L PV C N/ A Go o d No 1. S W - O u t 0 N/ A 8 1. 5 1 . 5 12.3 (C O P - 1 4 ) S S 1 1 4 4 PV C N/ A Go o d No 2. N W - I n 0 N/ A 8 1. 0 2 . 0 11.6 (C O P - 1 4 ) S S 1 6 1 8 PV C N/ A Go o d No 1. N - O u t (C O P - 1 4 ) S S 1 6 2 4 0 N/ A 12 4. 5 3 . 5 10.3 (C O P - 1 4 ) S S 1 1 4 5 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 Page 7 of 9 1. " S V C " - S e v i c e L a t e r a l / B u i l d i n g L a t e r a l C o n n e c t i o n 2. " E O L " - E n d o f L i n e o r L i n e h a s n o S t r u c t u r e C o n n e c t i o n Co n n e c t i n g Li n e S e g m e n t Di a m Co n s t r u c t i o n R o o t Gr o w t h De p o s i t i o n St r u c t u r a l Co n d i t i o n Vi s u a l I n f i l t . De p t h V e l o c i t y Ob s e r v e d (i n . ) -- - - - - - - - - - - - P I P E - - - - - - - - - - - - Ty p e D ep t h (i n . ) (fps) Di r . (g p m ) Pr o j e c t N o . 18 - 2 9 2 5 - 0 0 Co p p e l l , T X 2 0 1 5 S S E S P a r t 2 A (i n . ) R im to Invert (ft.) St r u c t u r e Nu m b e r Vi s u a l P i p e I n s p e c t i o n R e p o r t PV C N/ A Go o d N o 3. S - I n (C O P - 1 4 ) S S 1 6 2 4 0 N/ A 12 3. 5 3 . 5 10.1 (C O P - 1 4 ) S S 1 6 2 3 PV C N/ A Go o d No 2. E - I n 0 N/ A 8 2. 0 5 . 0 10.1 (C O P - 1 4 ) S S 1 6 2 5 PV C N/ A Go o d No 2. S - I n (C O P - 1 4 ) S S 1 6 2 5 0 N/ A 8 2. 5 6 . 0 6.4 (C O P - 1 4 ) S S 1 1 4 8 PV C N/ A Go o d No 1. W - O u t 0 N/ A 8 4. 0 3 . 5 7.0 (C O P - 1 4 ) S S 1 6 2 4 To t a l S e g m e n t s 2 1 Go o d 2 1 L o n g C r a c k 0 Ci r c u l a r C r a c 0 Br o k e n 0 Co l l a p s e d 0 N/ A 0 St r u c t u r a l C o n d i t i o n To t a l F o o t a g e PV C N / A Go o d No 1. N W - O u t (C O P - 1 5 ) S S 0 1 4 8 0 N/ A 15 3. 0 1 . 0 15.4 (C O P - 1 5 ) S S 1 3 0 3 PV C N/ A Go o d No 2. S W - I n 0 N/ A 12 3. 0 1 . 0 15.1 (C O P - 1 5 ) S S 2 1 7 9 PV C N/ A Go o d No 3. N W - I n 0 N/ A 8 N/ A N / A 14.9 (C O P - 1 5 ) S V C PV C N/ A Go o d No 3. S W - I n (C O P - 1 5 ) S S 0 3 5 4 0 N/ A 8 3. 0 2 . 0 12.4 (C O P - 1 5 ) S S 0 3 4 9 PV C N/ A Go o d No 2. S E - I n 0 N/ A 8 2. 0 2 . 5 12.3 (C O P - 1 5 ) S S 0 3 5 2 PV C N/ A Go o d No 1. N E - O u t 0 N/ A 8 2. 0 3 . 0 12.4 (C O P - 1 5 ) S S 1 3 0 4 PV C N/ A Go o d No 4. N - I n 0 N/ A 4 0. 5 5 . 0 12.1 (C O P - 1 5 ) S V C PV C N/ A Go o d No 2. S E - I n (C O P - 1 5 ) S S 1 3 0 3 0 N/ A 14 4. 0 1 . 0 14.8 (C O P - 1 5 ) S S 0 1 4 8 PV C N/ A Go o d No 1. N W - O u t 0 N/ A 14 4. 0 1 . 0 14.7 (C O P - 1 5 ) S S 1 3 0 4 PV C N/ A Go o d No 3. S W - I n 0 N/ A 8 0. 1 0 . 1 14.4 (C O P - 1 5 ) S V C PV C N/ A Go o d No 3. S E - I n (C O P - 1 5 ) S S 1 3 0 4 0 N/ A 8 6. 0 1 . 0 13.2 (C O P - 1 5 ) S S 0 3 5 4 PV C N/ A Go o d No 2. S E - I n 0 N/ A 14 6. 0 2 . 0 14.1 (C O P - 1 5 ) S S 1 3 0 3 PV C N/ A Go o d No 1. N W - O u t 0 N/ A 14 6. 0 2 . 0 14.1 (C O P - 1 5 ) S S 2 1 7 4 To t a l S e g m e n t s 1 3 Go o d 1 3 L o n g C r a c k 0 Ci r c u l a r C r a c 0 Br o k e n 0 Co l l a p s e d 0 N/ A 0 St r u c t u r a l C o n d i t i o n To t a l F o o t a g e We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 8 of 9 1. " S V C " - S e v i c e L a t e r a l / B u i l d i n g L a t e r a l C o n n e c t i o n 2. " E O L " - E n d o f L i n e o r L i n e h a s n o S t r u c t u r e C o n n e c t i o n Co n n e c t i n g Li n e S e g m e n t Di a m Co n s t r u c t i o n R o o t Gr o w t h De p o s i t i o n St r u c t u r a l Co n d i t i o n Vi s u a l I n f i l t . De p t h V e l o c i t y Ob s e r v e d (i n . ) -- - - - - - - - - - - - P I P E - - - - - - - - - - - - Ty p e D ep t h (i n . ) (fps) Di r . (g p m ) Pr o j e c t N o . 18 - 2 9 2 5 - 0 0 Co p p e l l , T X 2 0 1 5 S S E S P a r t 2 A (i n . ) R im to Invert (ft.) St r u c t u r e Nu m b e r Vi s u a l P i p e I n s p e c t i o n R e p o r t To t a l S e g m e n t s 1 7 4 Go o d 1 7 2 L o n g C r a c k 0 Ci r c u l a r C r a c 2 Br o k e n 0 Co l l a p s e d 0 N/ A 0 St r u c t u r a l C o n d i t i o n To t a l F o o t a g e Re p o r t T o t a l s We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 9 of 9 1. " S V C " - S e v i c e L a t e r a l / B u i l d i n g L a t e r a l C o n n e c t i o n 2. " E O L " - E n d o f L i n e o r L i n e h a s n o S t r u c t u r e C o n n e c t i o n APPENDIX C SUMMARY OF TELEVISION INSPECTION Pr o j e c t N u m b e r 18 - 2 9 2 5 - 0 0 C o p p e l l , T X 2 0 1 5 S S E S P a r t 2 A TV I n s p e c t i o n R e p o r t Li n e S e g m e n t Da te S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t (C O P - 0 7 ) S S 0 1 0 7 - ( C O P - 0 7 ) S S 1 8 4 7 2 /2 2 / 2 0 1 6 G L E N L A K E S D R 36 13 3 1 3 3 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 13 3 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 13 3 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 13 3 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 (C O P - 0 7 ) S S 1 2 0 4 - ( C O P - 0 7 ) S S 1 8 4 7 5/ 2 3 / 2 0 1 6 G L E N L A K E S D R 18 42 6 4 2 6 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 42 6 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 42 6 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 1 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t (C O P - 0 7 ) S S 1 8 0 3 - ( C O P - 0 7 ) S S 1 8 0 8 3 /2 8 / 2 0 1 6 D E F O R E S T R D 24 10 3 1 0 3 0 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 3 0. 1 0 5 Pi p e w / L o n g i t u d i n a l C r a c k Re p a i r $500.00 3.472 42 0. 0 3 0 Jo i n t w / M i n e r a l D e p o s i t s Gr o u t **** 65 0. 0 3 0 Jo i n t w / M i n e r a l D e p o s i t s Gr o u t **** 73 0. 2 5 0 Jo i n t w / I n f i l t r a t i o n Gr o u t **** 10 3 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 10 3 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 (C O P - 0 7 ) S S 1 8 0 9 - ( C O P - 0 7 ) S S 1 8 0 8 2/ 2 2 / 2 0 1 6 G L E N L A K E S D R 36 77 77 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 69 0. 0 0 0 Pi p e M a t e r i a l C h a n g e $0.00 73 0. 2 5 0 Jo i n t w / I n f i l t r a t i o n Gr o u t **** 77 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 77 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 2 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t (C O P - 0 7 ) S S 1 8 1 0 - ( C O P - 0 7 ) S S 1 8 0 9 5 /1 6 / 2 0 1 6 G L E N L A K E S D R 8 71 71 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 31 0. 0 0 0 Se r v i c e C o n n e c t i o n $0.00 71 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 71 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 (C O P - 0 7 ) S S 1 8 1 3 - ( C O P - 0 7 ) S S 1 8 0 9 2/ 2 2 / 2 0 1 6 G L E N L A K E S D R 36 49 9 4 9 9 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 2 6 - 5 0 P e r c e n t F l o w $0.00 49 9 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 49 9 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 49 9 0. 0 0 0 Pi p e w / 2 6 - 5 0 P e r c e n t F l o w $0.00 (C O P - 0 7 ) S S 1 8 1 6 - ( C O P - 0 7 ) S S 0 1 0 7 2/ 2 2 / 2 0 1 6 P H I L L I P S D R 36 62 62 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 3 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t 0 0 .0 0 0 Pi p e w / 2 6 - 5 0 P e r c e n t F l o w $0.00 62 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 62 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 62 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 (C O P - 0 7 ) S S 1 8 4 0 - ( C O P - 0 7 ) S S 1 8 0 9 5/ 1 6 / 2 0 1 6 D E F O R E S T R D 8 28 1 2 8 1 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 25 0. 0 0 0 Se r v i c e C o n n e c t i o n $0.00 52 0. 0 0 0 Se r v i c e C o n n e c t i o n $0.00 97 0. 0 0 0 Se r v i c e C o n n e c t i o n $0.00 13 7 0. 0 0 0 Se r v i c e C o n n e c t i o n $0.00 21 2 0. 0 0 0 Se r v i c e C o n n e c t i o n $0.00 28 1 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 28 1 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 (C O P - 0 7 ) S S 1 8 4 7 - ( C O P - 0 7 ) S S 1 8 1 3 2/ 2 2 / 2 0 1 6 G L E N L A K E S D R 36 27 8 2 7 8 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 27 8 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 4 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t 27 8 0 .0 0 0 En d T V O b s e r v a t i o n $0.00 (C O P - 1 0 ) E O L - ( C O P - 1 0 ) S S 2 1 6 7 2/ 1 / 2 0 1 6 N D E N T O N T A P R D 8 73 2 7 5 0 0 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 27 0 0. 0 0 0 Se r v i c e C o n n e c t i o n $0.00 27 1 0. 0 0 0 Se r v i c e C o n n e c t i o n $0.00 73 2 15 . 0 0 5 Pi p e w / H o l e Re p a i r $600.00 0.028 73 2 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 73 2 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 (C O P - 1 0 ) S S 0 1 5 6 - ( C O P - 1 0 ) S S 2 1 7 3 2/ 2 5 / 2 0 1 6 R U S T I C M E A D O W W A Y 24 35 1 3 5 1 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 12 0 0. 0 1 0 Jo i n t w / L i g h t R o o t s Gr o u t **** 18 2 0. 0 1 0 Jo i n t w / L i g h t R o o t s Gr o u t **** 19 7 0. 0 1 0 Jo i n t w / L i g h t R o o t s Gr o u t **** 21 3 0. 0 1 0 Jo i n t w / L i g h t R o o t s Gr o u t **** We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 5 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t 22 0 0 .0 1 0 Jo i n t w / L i g h t R o o t s Gr o u t **** 22 8 0. 0 1 0 Jo i n t w / L i g h t R o o t s Gr o u t **** 23 7 0. 0 1 0 Jo i n t w / L i g h t R o o t s Gr o u t **** 23 7 0. 1 0 5 Pi p e w / L o n g i t u d i n a l C r a c k Re p a i r $600.00 4.167 24 7 0. 1 0 5 Pi p e w / L o n g i t u d i n a l C r a c k Re p a i r $600.00 4.167 33 0 0. 0 1 0 Jo i n t w / L i g h t R o o t s Gr o u t **** 34 7 0. 1 5 5 Se r v i c e C o n n e c t i o n w / B r e a k - I n Re p a i r $600.00 2.778 35 1 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 35 1 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 35 1 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 (C O P - 1 0 ) S S 0 3 6 1 - ( C O P - 1 0 ) S S 1 0 7 0 2/ 1 / 2 0 1 6 N M O O R E R D 10 23 7 2 3 7 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 10 1 0. 0 0 0 Pi p e w / 5 1 - 7 5 P e r c e n t F l o w $0.00 13 6 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 23 7 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 23 7 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 6 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t (C O P - 1 0 ) S S 0 3 9 3 - ( C O P - 1 0 ) S S 1 8 1 6 2 /2 3 / 2 0 1 6 P H I L L I P S D R 24 61 0 6 1 0 0 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 61 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 61 0 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 61 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 (C O P - 1 0 ) S S 1 0 7 0 - ( C O P - 1 0 ) S S 2 1 6 5 2/ 2 6 / 2 0 1 6 N M O O R E R D 24 34 2 3 4 2 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 35 0. 0 3 0 Jo i n t w / M e d i u m R o o t s Gr o u t **** 43 0. 0 3 0 Jo i n t w / M e d i u m R o o t s Gr o u t **** 51 0. 0 3 0 Jo i n t w / M e d i u m R o o t s Gr o u t **** 59 0. 0 3 0 Jo i n t w / M e d i u m R o o t s Gr o u t **** 66 0. 0 3 0 Jo i n t w / M e d i u m R o o t s Gr o u t **** 75 0. 0 5 0 Jo i n t w / H e a v y R o o t s Gr o u t **** 82 0. 0 1 0 Jo i n t w / L i g h t R o o t s Gr o u t **** 91 0. 0 1 0 Jo i n t w / L i g h t R o o t s Gr o u t **** 98 0. 0 3 0 Jo i n t w / M e d i u m R o o t s Gr o u t **** 10 6 0. 0 1 0 Jo i n t w / L i g h t R o o t s Gr o u t **** 12 1 0. 7 0 5 Jo i n t , S e p a r a t e d Re p a i r $500.00 0.496 26 3 0. 0 1 0 Jo i n t w / L i g h t R o o t s Gr o u t **** 31 4 0. 7 0 5 Jo i n t , S e p a r a t e d Re p a i r $500.00 0.496 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 7 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t 34 2 0 .0 0 0 Do w n s t r e a m M a n h o l e $0.00 34 2 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 34 2 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 (C O P - 1 0 ) S S 1 3 2 7 - ( C O P - 1 0 ) S S 2 3 7 0 15 0 41 0 (C O P - 1 0 ) S S 1 3 3 3 - ( C O P - 1 0 ) S S 1 0 7 0 2/ 2 6 / 2 0 1 6 N M O O R E R D 24 10 3 0 1 0 3 0 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 60 9 0. 0 3 0 Jo i n t w / M e d i u m R o o t s Gr o u t **** 79 0 0. 0 3 0 Jo i n t w / M e d i u m R o o t s Gr o u t **** 82 2 0. 2 5 0 Jo i n t w / I n f i l t r a t i o n Gr o u t **** 86 9 0. 2 5 0 Jo i n t w / I n f i l t r a t i o n Gr o u t **** 90 0 0. 0 1 0 Jo i n t w / L i g h t R o o t s Gr o u t **** 94 0 0. 2 5 0 Jo i n t w / I n f i l t r a t i o n Gr o u t **** 96 4 0. 2 5 0 Jo i n t w / I n f i l t r a t i o n Gr o u t **** 96 4 0. 1 0 5 Pi p e w / L o n g i t u d i n a l C r a c k Re p a i r $500.00 3.472 10 3 0 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 8 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t 10 3 0 0 .0 0 0 En d T V O b s e r v a t i o n $0.00 10 3 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 (C O P - 1 0 ) S S 1 4 0 9 - ( C O P - 1 0 ) S S 1 4 1 3 2/ 2 5 / 2 0 1 6 N D E N T O N T A P R D 30 16 16 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 2 6 - 5 0 P e r c e n t F l o w $0.00 16 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 16 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 16 0. 0 0 0 Pi p e w / 2 6 - 5 0 P e r c e n t F l o w $0.00 (C O P - 1 0 ) S S 1 4 1 0 - ( C O P - 1 0 ) S S 1 4 1 1 2/ 2 5 / 2 0 1 6 R U S T I C M E A D O W W A Y 30 11 11 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 11 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 11 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 11 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 9 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t (C O P - 1 0 ) S S 1 4 1 1 - ( C O P - 1 0 ) S S 0 1 5 6 2 /2 5 / 2 0 1 6 R U S T I C M E A D O W W A Y 24 1 3 . 2 8 2 8 2 2 8 2 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 25 0. 0 3 0 Jo i n t w / M i n e r a l D e p o s i t s Gr o u t **** 48 0. 0 3 0 Jo i n t w / M i n e r a l D e p o s i t s Gr o u t **** 18 1 0. 0 1 0 Jo i n t w / L i g h t R o o t s Gr o u t **** 20 4 0. 2 5 0 Jo i n t w / I n f i l t r a t i o n Gr o u t **** 24 3 0. 0 3 0 Jo i n t w / M i n e r a l D e p o s i t s Gr o u t **** 28 0 0. 0 3 0 Jo i n t w / M i n e r a l D e p o s i t s Gr o u t **** 28 2 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 28 2 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 28 2 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 (C O P - 1 0 ) S S 1 4 1 2 - ( C O P - 1 0 ) S S 1 4 1 0 2/ 2 5 / 2 0 1 6 N D E N T O N T A P R D 30 50 4 5 0 4 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 2 6 - 5 0 P e r c e n t F l o w $0.00 50 4 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 10 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t 50 4 0 .0 0 0 En d T V O b s e r v a t i o n $0.00 50 4 0. 0 0 0 Pi p e w / 2 6 - 5 0 P e r c e n t F l o w $0.00 (C O P - 1 0 ) S S 1 4 1 3 - ( C O P - 1 0 ) S S 1 4 1 2 2/ 2 5 / 2 0 1 6 N D E N T O N T A P R D 30 35 7 3 5 7 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 2 6 - 5 0 P e r c e n t F l o w $0.00 35 7 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 35 7 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 35 7 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 (C O P - 1 0 ) S S 1 6 4 7 - ( C O P - 1 0 ) S S 1 6 5 1 2/ 1 / 2 0 1 6 C O P P E R S T O N E T R L 8 20 0 2 0 0 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 20 0 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 20 0 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 20 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 11 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t (C O P - 1 0 ) S S 2 1 6 4 - ( C O P - 1 0 ) S S 0 3 9 3 2 /2 2 / 2 0 1 6 N M O O R E R D 24 47 0 4 7 0 0 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 8 0. 2 5 0 Jo i n t w / I n f i l t r a t i o n Gr o u t **** 17 9 0. 0 3 0 Jo i n t w / M e d i u m R o o t s Gr o u t **** 47 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 47 0 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 47 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 (C O P - 1 0 ) S S 2 1 6 5 - ( C O P - 1 0 ) S S 2 1 6 4 2/ 2 2 / 2 0 1 6 N M O O R E R D 24 13 9 1 3 9 0 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 72 0. 7 0 5 Jo i n t , S e p a r a t e d Re p a i r $600.00 0.595 10 4 0. 0 3 0 Jo i n t w / M e d i u m R o o t s Gr o u t **** 11 1 0. 0 1 0 Jo i n t w / L i g h t R o o t s Gr o u t **** 12 7 0. 0 3 0 Jo i n t w / M e d i u m R o o t s Gr o u t **** 13 3 0. 0 3 0 Jo i n t w / M e d i u m R o o t s Gr o u t **** We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 12 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t 13 9 0 .0 0 0 Up s t r e a m M a n h o l e $0.00 13 9 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 (C O P - 1 0 ) S S 2 1 6 6 - ( C O P - 1 0 ) S S 2 1 6 5 2/ 1 / 2 0 1 6 N M O O R E R D 8 16 9 1 6 9 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 16 4 0. 0 0 0 Pi p e w / D r o p C o n n e c t i o n $0.00 16 9 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 16 9 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 (C O P - 1 0 ) S S 2 1 6 7 - ( C O P - 1 0 ) S S 2 1 6 8 3/ 3 / 2 0 1 6 N D E N T O N T A P R D 15 31 6 3 1 6 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 2 6 - 5 0 P e r c e n t F l o w $0.00 31 6 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 31 6 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 31 6 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 13 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t (C O P - 1 0 ) S S 2 1 6 8 - ( C O P - 1 0 ) S S 2 1 6 9 3 /4 / 2 0 1 6 N D E N T O N T A P R D 15 27 7 2 7 7 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 5 1 - 7 5 P e r c e n t F l o w $0.00 27 7 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 27 7 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 27 7 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 (C O P - 1 0 ) S S 2 1 6 9 - ( C O P - 1 0 ) S S 2 1 7 0 3/ 4 / 2 0 1 6 N D E N T O N T A P R D 15 12 8 1 2 8 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 5 1 - 7 5 P e r c e n t F l o w $0.00 43 0. 0 0 0 Pi p e w / 7 6 - 1 0 0 P e r c e n t F l o w $0.00 11 1 0. 0 0 0 Pi p e w / 7 6 - 1 0 0 P e r c e n t F l o w $0.00 12 4 0. 0 0 0 Ca m e r a S u b m e r g e d $0.00 12 8 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 12 8 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 12 8 0. 0 0 0 Pi p e w / 5 1 - 7 5 P e r c e n t F l o w $0.00 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 14 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t (C O P - 1 0 ) S S 2 1 7 0 - ( C O P - 1 0 ) S S 2 1 7 1 3 /1 7 / 2 0 1 6 N D E N T O N T A P R D 15 49 5 4 9 5 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 25 9 0. 0 0 0 Se r v i c e C o n n e c t i o n $0.00 35 6 0. 0 0 0 Pi p e M a t e r i a l C h a n g e $0.00 49 5 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 49 5 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 (C O P - 1 0 ) S S 2 1 7 1 - ( C O P - 1 0 ) S S 2 1 7 2 3/ 7 / 2 0 1 6 E A S E M E N T 15 50 7 5 0 7 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 31 0. 0 0 0 Pi p e w / G r e a s e $0.00 17 7 0. 0 0 0 Pi p e w / G r e a s e $0.00 18 4 0. 0 0 0 Pi p e w / G r e a s e $0.00 35 3 0. 0 0 0 Pi p e w / G r e a s e $0.00 36 5 0. 0 0 0 Pi p e w / G r e a s e $0.00 45 6 0. 0 0 0 Pi p e w / G r e a s e $0.00 49 5 0. 0 0 0 Pi p e w / G r e a s e $0.00 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 15 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t 50 7 0 .0 0 0 Do w n s t r e a m M a n h o l e $0.00 50 7 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 (C O P - 1 0 ) S S 2 1 7 2 - ( C O P - 1 5 ) S S 2 1 7 3 12 / 2 / 2 0 1 6 N O R T H D E N T O N T A P R D 15 12 9 2 7 9 0 0. 0 0 0 Up s t r e a m M a n h o l e 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n 12 9 0. 0 0 0 En d T V O b s e r v a t i o n (C O P - 1 0 ) S S 2 3 7 0 - ( C O P - 1 0 ) S S 2 3 7 1 3/ 3 / 2 0 1 6 C O P P E R S T O N E T R L 15 44 7 4 4 7 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 2 6 - 5 0 P e r c e n t F l o w $0.00 42 5 0. 1 0 5 Jo i n t w / G a s k e t E x p o s e d Re p a i r $500.00 3.472 44 7 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 44 7 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 44 7 0. 0 0 0 Pi p e w / 2 6 - 5 0 P e r c e n t F l o w $0.00 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 16 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t (C O P - 1 0 ) S S 2 3 7 1 - ( C O P - 1 0 ) S S 2 1 6 7 3 /3 / 2 0 1 6 C O P P E R S T O N E T R L 15 34 2 3 4 2 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 34 2 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 34 2 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 34 2 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 (C O P - 1 1 ) S S 0 3 0 6 - ( C O P - 1 1 ) S S 1 6 5 1 3/ 2 / 2 0 1 6 W A L K W A Y 15 33 4 3 3 4 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 55 0. 0 0 0 Ca m e r a B l o c k e d $0.00 61 0. 0 0 0 Ca m e r a B l o c k e d $0.00 92 0. 0 0 0 Pi p e w / 2 6 - 5 0 P e r c e n t F l o w $0.00 33 4 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 33 4 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 33 4 0. 0 0 0 Pi p e w / 2 6 - 5 0 P e r c e n t F l o w $0.00 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 17 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t (C O P - 1 1 ) S S 0 3 0 7 - ( C O P - 1 1 ) S S 1 3 2 8 1 5 0 16 8 (C O P - 1 1 ) S S 0 3 1 4 - ( C O P - 1 1 ) S S 0 6 6 8 1/ 2 8 / 2 0 1 6 W E S T M I N S T E R C T 10 30 30 0 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / G r e a s e $0.00 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 12 0. 0 0 0 Pi p e w / G r e a s e $0.00 30 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 30 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 18 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t (C O P - 1 1 ) S S 0 6 6 9 - ( C O P - 1 1 ) S S 0 8 4 5 2 /1 6 / 2 0 1 6 G I F F O R D C T 15 61 7 6 1 7 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 6 0. 0 0 0 Pi p e w / D e p o s i t s $0.00 9 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 9 0. 0 0 0 Pi p e w / 2 6 - 5 0 P e r c e n t F l o w $0.00 12 9 0. 0 0 0 Pi p e w / 2 6 - 5 0 P e r c e n t F l o w $0.00 13 7 0. 0 0 0 Pi p e w / D e p o s i t s $0.00 29 9 0. 0 0 0 Pi p e w / D e p o s i t s $0.00 61 7 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 61 7 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 61 7 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 (C O P - 1 1 ) S S 0 8 4 5 - ( C O P - 1 1 ) S S 0 8 4 6 2/ 1 6 / 2 0 1 6 G I F F O R D C T 15 28 4 2 8 4 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 68 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 88 0. 0 0 0 Pi p e w / G r e a s e $0.00 14 8 0. 0 0 0 Pi p e w / 2 6 - 5 0 P e r c e n t F l o w $0.00 28 4 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 28 4 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 28 4 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 19 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t (C O P - 1 1 ) S S 0 8 4 6 - ( C O P - 1 1 ) S S 1 3 2 9 2 /1 6 / 2 0 1 6 G I F F O R D C T 15 35 28 0 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 2 6 - 5 0 P e r c e n t F l o w $0.00 35 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 (C O P - 1 1 ) S S 1 3 2 8 - ( C O P - 1 1 ) S S 0 3 0 6 3/ 2 / 2 0 1 6 W A L K W A Y 15 48 3 4 8 3 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 48 3 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 48 3 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 48 3 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 20 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t (C O P - 1 1 ) S S 1 3 2 9 - ( C O P - 1 1 ) S S 0 3 0 7 1 2 0 37 9 (C O P - 1 1 ) S S 1 6 5 1 - ( C O P - 1 1 ) S S 1 3 2 7 3/ 2 / 2 0 1 6 W A L K W A Y 15 14 0 1 4 0 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 2 6 - 5 0 P e r c e n t F l o w $0.00 12 9 0. 0 0 0 Ca m e r a S u b m e r g e d $0.00 13 3 0. 0 0 0 Ca m e r a S u b m e r g e d $0.00 14 0 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 14 0 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 14 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 (C O P - 1 1 ) S S 2 5 3 3 - ( C O P - 1 1 ) S S 0 6 6 8 1/ 2 8 / 2 0 1 6 W E S T M I N S T E R C T 10 15 8 1 5 8 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 12 6 0. 0 3 0 Jo i n t w / M i n e r a l D e p o s i t s Gr o u t **** We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 21 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t 15 8 0 .0 0 0 Do w n s t r e a m M a n h o l e $0.00 15 8 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 15 8 0. 0 0 0 Pi p e w / 2 6 - 5 0 P e r c e n t F l o w $0.00 (C O P - 1 1 ) S S 2 5 3 4 - ( C O P - 1 1 ) S S 0 6 6 9 1/ 2 8 / 2 0 1 6 W E S T M I N S T E R C T 8 38 9 3 8 9 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 36 9 0. 0 0 0 Pi p e w / 2 6 - 5 0 P e r c e n t F l o w $0.00 38 9 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 38 9 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 (C O P - 1 1 ) S S 2 5 4 6 - ( C O P - 1 1 ) S S 0 3 0 7 2/ 1 / 2 0 1 6 L A Y T O N D R 12 26 3 2 6 3 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 26 3 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 26 3 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 26 3 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 22 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t (C O P - 1 4 ) S S 0 1 5 5 - ( C O P - 1 4 ) S S 0 2 5 5 2 /2 5 / 2 0 1 6 N D E N T O N T A P R D 24 75 75 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 75 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 75 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 75 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 (C O P - 1 4 ) S S 0 2 5 5 - ( C O P - 1 4 ) S S 1 4 0 9 A 2/ 2 5 / 2 0 1 6 N D E N T O N T A P R D 24 60 60 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 57 0. 3 0 5 Pi p e w / O p e n C r a c k Re p a i r $600.00 1.389 60 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 60 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 60 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 23 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t (C O P - 1 4 ) S S 0 2 5 6 - ( C O P - 1 4 ) S S 0 1 5 5 8 /1 / 2 0 1 6 D E N T O N T A P R D 24 50 8 5 0 8 0 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 26 3 0. 0 3 0 Jo i n t w / M e d i u m R o o t s Gr o u t **** 46 0 0. 1 5 5 Se r v i c e C o n n e c t i o n w / B r e a k - I n Re p a i r $600.00 2.778 46 1 0. 0 3 0 Jo i n t w / M e d i u m R o o t s Gr o u t **** 46 8 0. 0 3 0 Jo i n t w / M e d i u m R o o t s Gr o u t **** 48 8 0. 0 3 0 Jo i n t w / M e d i u m R o o t s Gr o u t **** 50 8 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 50 8 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 (C O P - 1 4 ) S S 0 3 2 7 - ( C O P - 1 4 ) S S 1 3 5 5 9/ 1 4 / 2 0 1 6 C O T T O N W O O D D R 21 31 2 3 1 2 0 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 11 2 0. 0 3 0 Jo i n t w / M i n e r a l D e p o s i t s Gr o u t **** 29 1 0. 0 3 0 Jo i n t w / M e d i u m R o o t s Gr o u t **** 31 2 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 31 2 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 24 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t (C O P - 1 4 ) S S 0 3 2 8 - ( C O P - 1 4 ) S S 1 3 5 4 2 4 0 29 0 (C O P - 1 4 ) S S 0 3 2 9 - ( C O P - 1 4 ) S S 0 3 2 8 9/ 1 4 / 2 0 1 6 C O T T O N W O O D D R 21 61 3 6 1 3 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 61 3 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 61 3 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 (C O P - 1 4 ) S S 1 1 4 4 - ( C O P - 1 4 ) S S 1 1 4 5 8/ 2 / 2 0 1 6 C O W B O Y D R 21 26 9 2 6 9 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 25 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t 15 1 0 .1 0 5 Pi p e w / L o n g i t u d i n a l C r a c k Re p a i r $600.00 4.167 16 3 0. 1 0 5 Pi p e w / L o n g i t u d i n a l C r a c k Re p a i r $600.00 4.167 26 9 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 26 9 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 (C O P - 1 4 ) S S 1 3 5 4 - ( C O P - 1 4 ) S S 1 1 4 4 8/ 2 / 2 0 1 6 C O W B O Y D R 21 21 2 2 1 2 0 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 18 3 0. 1 0 5 Pi p e w / L o n g i t u d i n a l C r a c k Re p a i r $600.00 4.167 21 2 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 21 2 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 (C O P - 1 4 ) S S 1 3 5 5 - ( C O P - 1 4 ) S S 0 3 2 9 9/ 1 4 / 2 0 1 6 C O T T O N W O O D D R 21 30 0 3 0 0 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / D e p o s i t s $0.00 29 7 0. 0 0 0 Pi p e w / D e p o s i t s $0.00 30 0 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 30 0 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 26 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t (C O P - 1 4 ) S S 1 4 0 9 A - ( C O P - 1 4 ) S S 1 4 0 9 2 /2 5 / 2 0 1 6 N D E N T O N T A P R D 24 18 3 1 8 3 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 0 0. 0 0 0 Pi p e w / 2 6 - 5 0 P e r c e n t F l o w $0.00 22 0. 1 0 5 Pi p e w / L o n g i t u d i n a l C r a c k Re p a i r $500.00 3.472 25 0. 1 0 5 Pi p e w / L o n g i t u d i n a l C r a c k Re p a i r $500.00 3.472 34 0. 0 3 0 Jo i n t w / M i n e r a l D e p o s i t s Gr o u t **** 40 0. 0 0 0 Pi p e M a t e r i a l C h a n g e $0.00 43 0. 5 0 5 Pi p e w / H o l e Re p a i r $500.00 0.694 46 0. 1 0 5 Pi p e w / L o n g i t u d i n a l C r a c k Re p a i r $500.00 3.472 48 0. 5 0 5 Jo i n t , C r a c k e d Re p a i r $500.00 0.694 60 0. 5 0 5 Pi p e w / H o l e Re p a i r $500.00 0.694 82 0. 1 0 5 Pi p e w / C i r c u l a r C r a c k Re p a i r $500.00 3.472 10 2 0. 5 0 5 Pi p e w / H o l e Re p a i r $500.00 0.694 12 3 0. 5 0 5 Jo i n t , C r a c k e d Re p a i r $500.00 0.694 14 3 0. 5 0 5 Jo i n t , C r a c k e d Re p a i r $500.00 0.694 18 3 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 18 3 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 18 3 0. 0 0 0 Pi p e w / 0 - 2 5 P e r c e n t F l o w $0.00 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 27 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t (C O P - 1 4 ) S S 1 6 1 7 - ( C O P - 1 4 ) S S 1 1 4 4 5 /1 9 / 2 0 1 6 M A R T E L L N 8 35 9 3 5 9 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 35 9 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 35 9 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 (C O P - 1 4 ) S S 1 6 2 4 - ( C O P - 1 4 ) S S 1 1 4 5 5/ 1 9 / 2 0 1 6 C O W B O Y D R 12 22 3 2 2 3 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 4 0. 0 0 0 Pi p e w / G r e a s e $0.00 13 4 0. 0 0 0 Pi p e w / G r e a s e $0.00 21 0 0. 0 0 0 Pi p e w / G r e a s e $0.00 22 3 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 22 3 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 (C O P - 1 5 ) S S 0 1 4 8 - ( C O P - 1 5 ) S S 1 3 0 3 5/ 1 9 / 2 0 1 6 P A R K W A Y B L V D 15 42 3 4 2 3 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 28 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t 42 3 0 .0 0 0 Do w n s t r e a m M a n h o l e $0.00 42 3 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 (C O P - 1 5 ) S S 0 3 5 4 - ( C O P - 1 5 ) S S 1 3 0 4 5/ 1 9 / 2 0 1 6 C R O O K E D T R E E C T 8 19 6 1 9 6 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 19 6 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 19 6 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 (C O P - 1 5 ) S S 1 3 0 3 - ( C O P - 1 5 ) S S 1 3 0 4 5/ 1 9 / 2 0 1 6 P A R K W A Y B L V D 15 20 0 2 0 0 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 20 0 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 20 0 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 29 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t (C O P - 1 5 ) S S 1 3 0 4 - ( C O P - 1 5 ) S S 2 1 7 4 5 /1 9 / 2 0 1 6 P A R K W A Y B L V D 15 29 9 2 9 9 0 0. 0 0 0 Up s t r e a m M a n h o l e $0.00 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n $0.00 29 9 0. 0 0 0 Do w n s t r e a m M a n h o l e $0.00 29 9 0. 0 0 0 En d T V O b s e r v a t i o n $0.00 (C O P - 1 5 ) S S 1 8 0 7 - ( C O P - 1 5 ) S S 1 8 0 8 12 / 2 / 2 0 1 6 N O R T H M A C A R T H U R B L V D 36 22 3 2 2 3 0 0. 0 0 0 Up s t r e a m M a n h o l e 0 0. 0 0 0 Be g i n T V O b s e r v a t i o n 21 0 . 9 0. 7 0 5 Jo i n t , S e p a r a t e d Re p a i r 22 3 . 1 0. 0 0 0 Do w n s t r e a m M a n h o l e 22 3 . 1 0. 0 0 0 En d T V O b s e r v a t i o n We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 30 of 31 Li n e S e g m e n t Da t e S t r e e t Fo o t a g e O b s e r v a t i o n s Fl o w -- - - - - - - - - - - R e p a i r - - - - - - - - - - - - Le n g t h Ty p e Cost Ratio (g p m ) (f t ) $/gpd Di a m D e p t h T V L e n g t h L e n g t h Se gm e n t To t a l T V L e n g t h ( f t ) 17 , 2 0 9 To t a l S e g m e n t L e n g t h ( f t ) 18 , 8 6 9 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 31 of 31 APPENDIX D RECOMMENDED MANHOLE REHABILITATION Manhole Rehabilitation Recommendations Project Number 18-2925-00 Coppell, TX 2016 SSES Part 2A Manhole Repair Description Street Address Construction MHType Surface Depth Rehab Cost Inflow Infilt Ratio COP-07 SS0107 Grout Lower 18" of Manhole, Repair Bench/Trough, and Install Internal Chimney Seal 623 Glen Lakes Dr Precast Manhole Non-Paved 19.95 1,700 720 1,152 0.908 COP-07 SS1204 Install Bolts/Gasket for Bolted Cover 627 Lake Park Dr Precast Manhole Non-Paved 18.09 100 20,811 0 0.005 COP-07 SS1803 Grout Walls/Joints 400 Glen Lakes Dr Poured Manhole Non-Paved 24.7 1,647 0 1,152 1.429 COP-07 SS1807 Replace Cover/Frame/Frame Seal 635 N MacArthur Blvd Precast Manhole Non-Paved 15.29 1,050 1,440 0 0.729 COP-07 SS1816 Complete Manhole Rehab and External Chimney Seal w/o New Frame and Cover 623 Glen Lakes Dr Precast Manhole Non-Paved 23.28 5,175 893 2,117 1.719 COP-07 SS1816A Grout Lower 18" of Manhole and Repair Bench/Trough 623 Glen Lakes Dr Precast Manhole Non-Paved 23.34 1,000 0 1,037 0.965 COP-07 SS1847 Grout Lower 18" of Manhole and Repair Bench/Trough 623 Glen Lakes Dr Precast Manhole Non-Paved 22.39 1,000 0 9,360 0.107 COP-10 SS0156 Grout Lower 18" of Manhole and Replace Cover/Frame/Frame Seal 204 Rustic Meadow Way Poured Manhole Non-Paved 13.58 3,100 14,688 1,037 0.197 COP-10 SS0393 Grout Lower 18" of Manhole and Repair Bench/Trough 457 Phillips Dr Precast Manhole Paved 21.9 1,000 0 2,880 0.347 COP-10 SS0668 Install Bolts/Gasket for Bolted Cover 621 Gifford Ct Poured Manhole Non-Paved 10.56 100 1,152 0 0.087 COP-10 SS0669 Install Bolts/Gasket for Bolted Cover 621 Gifford Ct Poured Manhole Non-Paved 10.78 100 288 0 0.347 COP-10 SS0845 Install Bolts/Gasket for Bolted Cover 700 Gifford Ct Poured Manhole Non-Paved 11 100 432 0 0.231 COP-10 SS0846 Install Bolts/Gasket for Bolted Cover 700 Gifford Ct Poured Manhole Non-Paved 8.2 100 432 0 0.231 COP-10 SS1327 Install Bolts/Gasket for Bolted Cover 430 Copperstone Trail Poured Manhole Non-Paved 14.05 100 432 0 0.231 COP-10 SS1328 Install Bolts/Gasket for Bolted Cover 466 Copperstone Trail Poured Manhole Non-Paved 10.8 100 432 0 0.231 COP-10 SS1329 Cementitious Coating and Install Bolts/Gasket for Bolted Cover 520 Layton Dr Poured Manhole Non-Paved 12.3 2,068 432 1,440 1.105 COP-10 SS1410 Cementitious Coating 140 Rustic Meadow Way Poured Manhole Non-Paved 12.58 2,013 1,440 720 0.932 COP-10 SS1411 Grout Lower 18" of Manhole and Repair Bench/Trough 140 Rustic Meadow Way Poured Manhole Non-Paved 13.17 1,000 0 720 1.389 COP-10 SS1651 Grout Lower 18" of Manhole and Repair Bench/Trough 434 Copperstone Trail Poured Manhole Non-Paved 14.08 1,000 0 720 1.389 COP-10 SS2164 Grout Walls/Joints and Install External Chimney Seal 420 Parkwood Ln Precast Manhole Non-Paved 18.9 1,760 720 720 1.222 COP-10 SS2166 Replace Cover/Frame/Frame Seal 424 N Moore Rd Precast Manhole Paved 11.75 1,450 1,440 0 1.007 COP-10 SS2167 Install Bolts/Gasket for Bolted Cover 375 N Denton Tap Rd Poured Manhole Non-Paved 15.12 100 432 0 0.231 COP-10 SS2168 Install Bolts/Gasket for Bolted Cover 575 N Denton Tap Rd Poured Manhole Non-Paved 16.08 100 432 0 0.231 Manhole Rehabilitation Recommendations Project Number 18-2925-00 Coppell, TX 2016 SSES Part 2A Manhole Repair Description Street Address Construction MHType Surface Depth Rehab Cost Inflow Infilt Ratio COP-10 SS2169 Install Bolts/Gasket for Bolted Cover 575 N Denton Tap Rd Poured Manhole Paved 19.94 100 1,728 0 0.058 COP-10 SS2170 Replace Cover/Frame/Frame Seal 546 N Denton Tap Rd Poured Manhole Non-Paved 18.31 1,050 1,152 0 0.911 COP-10 SS2173 Install Bolts/Gasket for Bolted Cover 216 Rustic Meadow Way Poured Manhole Non-Paved 16.24 100 432 0 0.231 COP-10 SS2175 Replace Cover/Frame/Frame Seal 250 Natches Trace Poured Manhole Non-Paved 14.75 1,050 1,440 0 0.729 COP-10 SS2370 Replace Cover/Frame/Frame Seal 385 N Denton Tap Rd Poured Manhole Non-Paved 12.11 1,050 1,152 0 0.911 COP-10 SS2371 Install Bolts/Gasket for Bolted Cover 363 N Denton Tap Rd Poured Manhole Non-Paved 14.8 100 432 0 0.231 COP-10 SS2533 Install Bolts/Gasket for Bolted Cover 621 Gifford Ct Precast Manhole Non-Paved 5.28 100 288 0 0.347 COP-10 SS2534 Grout Lower 18" of Manhole and Repair Bench/Trough 615 Westminster Ct Poured Manhole Non-Paved 16.88 1,000 0 720 1.389 COP-14 SS0155 Compete Manhole Rehab w/ New Frame and Cover 353 N Denton Tap Rd Precast Manhole Non-Paved 9.66 3,171 2,520 360 1.101 COP-14 SS0255 Replace Cover/Frame/Frame Seal 429 N Denton Tap Rd Precast Manhole Non-Paved 0 1,050 14,400 0 0.073 COP-14 SS1145 Install Bolts/Gasket for Bolted Cover 185 W Parkway Blvd Precast Manhole Non-Paved 8.59 100 288 0 0.347 COP-14 SS1617 Complete Manhole Rehab w/o New Frame and Cover 311 Martel Ln Precast Manhole Non-Paved 12.5 2,600 1,080 1,757 0.917 COP-14 SS1625 Replace Cover/Frame/Frame Seal 185 Parkway Blvd Poured Manhole Non-Paved 6.48 1,050 720 0 1.458 COP-15 SS0148 Cementitious Coating and Install External Chimney Seal 234 Parkway Blvd Precast Manhole Non-Paved 15.19 2,930 720 1,152 1.565 Report Totals:Total Costs: $41,313 Total Inflow:72,968 Total Infiltration:25,891 Total Flow:98,859 APPENDIX E INFLOW SOURCE REPORT In f l o w S o u r c e R e p o r t Ba s i n / S t r u c t u r e St r e e t A d d r e s s Ty p S o u r c e R e h a b i l i t a t i o n W o r k Fl o w ( G P D ) Co s t Ratio ( $ / G P D ) ( $ ) Re p a i r Flow ( GPD )Cumlative Cost ( $ )Cumlative Pr o j e c t N u m b e r 18 - 2 9 2 5 - 0 0 Co p p e l l , T X 2 0 1 5 S S E S P a r t 2 A CO P - 1 0 S S 1 0 7 0 52 3 N M o o r e R d In f l o w C r a c k e d W a l l W a l l - C oa t M a n h o l e W a l l 1 4 4 , 0 0 0 $ 2 0 0 0 . 0 0 1 144,000 $200 CO P - 0 7 S S 1 2 0 4 62 7 L a k e P a r k D r In f l o w C o v e r M i s s i n g B o l t s R e p l a c e C o v e r B o l t s 2 0 , 8 1 1 $ 1 0 0 0 . 0 0 5 164,811 $300 CO P - 1 0 E O L C O P - 1 0 S S 2 1 6 7 N D E N T O N T A P R D In f l o w P i p e w / H o l e R e p a i r 19 , 4 4 0 $ 6 0 0 0 . 0 3 1 184,251 $900 CO P - 1 4 S S 0 2 5 5 42 9 N D e n t o n T a p R d In f l o w F r a m e S e a l / P o n d i n g R e p a i r F r a m e S e a l 14 , 4 0 0 $ 7 5 0 0 . 0 5 2 198,651 $1,650 CO P - 1 0 S S 2 1 6 9 57 5 N D e n t o n T a p R d In f l o w C o v e r M i s s i n g B o l t s R e p l a c e C o v e r B o l t s 1, 7 2 8 $ 1 0 0 0 . 0 5 8 200,379 $1,750 CO P - 1 0 S S 0 1 5 6 20 4 R u s t i c M e a d o w W a y I n f l o w F r a m e S e a l / P o n d i n g R e p a i r F r a m e S e a l 11 , 5 2 0 $ 7 5 0 0 . 0 6 5 211,899 $2,500 CO P - 1 1 S S 0 6 6 8 62 1 G i f f o r d C t In f l o w C o v e r M i s s i n g B o l t s R e p l a c e C o v e r B o l t s 1, 1 5 2 $ 1 0 0 0 . 0 8 7 213,051 $2,600 CO P - 1 0 S S 0 1 5 6 20 4 R u s t i c M e a d o w W a y I n f l o w C r a c k e d C o r b e l C o r b e l - C o a t C o r b e l 3, 1 6 8 $ 5 0 0 0 . 1 5 8 216,219 $3,100 CO P - 1 0 S S 2 1 6 8 57 5 N D e n t o n T a p R d In f l o w C o v e r M i s s i n g B o l t s R e p l a c e C o v e r B o l t s 43 2 $ 1 0 0 0 . 2 3 1 216,651 $3,200 CO P - 1 0 S S 2 1 6 7 37 5 N D e n t o n T a p R d In f l o w C o v e r M i s s i n g B o l t s R e p l a c e C o v e r B o l t s 43 2 $ 1 0 0 0 . 2 3 1 217,083 $3,300 CO P - 1 0 S S 1 3 2 7 43 0 C o p p e r s t o n e T r a i l In f l o w C o v e r M i s s i n g B o l t s R e p l a c e C o v e r B o l t s 43 2 $ 1 0 0 0 . 2 3 1 217,515 $3,400 CO P - 1 1 S S 1 3 2 8 46 6 C o p p e r s t o n e T r a i l In f l o w C o v e r M i s s i n g B o l t s R e p l a c e C o v e r B o l t s 43 2 $ 1 0 0 0 . 2 3 1 217,947 $3,500 CO P - 1 1 S S 1 3 2 9 52 0 L a y t o n D r In f l o w C o v e r M i s s i n g B o l t s R e p l a c e C o v e r B o l t s 43 2 $ 1 0 0 0 . 2 3 1 218,379 $3,600 CO P - 1 1 S S 0 8 4 6 70 0 G i f f o r d C t In f l o w C o v e r M i s s i n g B o l t s R e p l a c e C o v e r B o l t s 43 2 $ 1 0 0 0 . 2 3 1 218,811 $3,700 CO P - 1 0 S S 2 1 7 0 54 6 N D e n t o n T a p R d In f l o w C o v e r M i s s i n g B o l t s R e p l a c e C o v e r B o l t s 43 2 $ 1 0 0 0 . 2 3 1 219,243 $3,800 CO P - 1 1 S S 0 8 4 5 70 0 G i f f o r d C t In f l o w C o v e r M i s s i n g B o l t s R e p l a c e C o v e r B o l t s 43 2 $ 1 0 0 0 . 2 3 1 219,675 $3,900 CO P - 1 0 S S 2 1 7 2 20 8 R u s t i c M e a d o w W a y I n f l o w C o v e r M i s s i n g B o l t s R e p l a c e C o v e r B o l t s 43 2 $ 1 0 0 0 . 2 3 1 220,107 $4,000 CO P - 1 0 S S 2 3 7 1 36 3 N D e n t o n T a p R d In f l o w C o v e r M i s s i n g B o l t s R e p l a c e C o v e r B o l t s 43 2 $ 1 0 0 0 . 2 3 1 220,539 $4,100 CO P - 1 0 S S 2 1 7 3 21 6 R u s t i c M e a d o w W a y I n f l o w C o v e r M i s s i n g B o l t s R e p l a c e C o v e r B o l t s 43 2 $ 1 0 0 0 . 2 3 1 220,971 $4,200 CO P - 1 0 S S 2 3 7 0 38 5 N D e n t o n T a p R d In f l o w C o v e r M i s s i n g B o l t s R e p l a c e C o v e r B o l t s 43 2 $ 1 0 0 0 . 2 3 1 221,403 $4,300 CO P - 1 4 S S 1 1 4 5 18 5 W P a r k w a y B l v d In f l o w C o v e r M i s s i n g B o l t s R e p l a c e C o v e r B o l t s 28 8 $ 1 0 0 0 . 3 4 7 221,691 $4,400 CO P - 1 1 S S 2 5 3 3 62 1 G i f f o r d C t In f l o w C o v e r M i s s i n g B o l t s R e p l a c e C o v e r B o l t s 28 8 $ 1 0 0 0 . 3 4 7 221,979 $4,500 CO P - 1 1 S S 0 6 6 9 62 1 G i f f o r d C t In f l o w C o v e r M i s s i n g B o l t s R e p l a c e C o v e r B o l t s 28 8 $ 1 0 0 0 . 3 4 7 222,267 $4,600 CO P - 1 0 S S 1 4 1 0 14 0 R u s t i c M e a d o w W a y I n f l o w C r a c k e d C o r b e l C o r b e l - C o a t C o r b e l 1, 4 4 0 $ 5 0 0 0 . 3 4 7 223,707 $5,100 CO P - 1 4 S S 1 6 2 5 18 5 P a r k w a y B l v d In f l o w D e f e c t i v e C o v e r ( P i c k R e p l a c e M a n h o l e C o v e r 7 2 0 $ 2 5 0 0 . 3 4 7 224,427 $5,350 CO P - 1 4 S S 1 6 1 7 31 1 M a r t e l L n In f l o w C r a c k e d C o r b e l C o r b e l - C o a t C o r b e l 1, 0 8 0 $ 5 0 0 0 . 4 6 3 225,507 $5,850 CO P - 1 4 S S 0 1 5 5 35 3 N D e n t o n T a p R d In f l o w C r a c k e d C o r b e l C o r b e l - C o a t C o r b e l 1, 0 8 0 $ 5 0 0 0 . 4 6 3 226,587 $6,350 CO P - 0 7 S S 1 8 0 7 63 5 N M a c A r t h u r B l v d In f l o w F r a m e S e a l Re p a i r F r a m e S e a l 1, 4 4 0 $ 7 5 0 0 . 5 2 1 228,027 $7,100 CO P - 1 4 S S 0 1 5 5 35 3 N D e n t o n T a p R d In f l o w F r a m e S e a l Re p a i r F r a m e S e a l 1, 4 4 0 $ 7 5 0 0 . 5 2 1 229,467 $7,850 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 P age 1 of 2 Ba s i n / S t r u c t u r e St r e e t A d d r e s s Ty p S o u r c e R e h a b i l i t a t i o n W o r k Fl o w ( G P D ) Co s t Ratio ( $ / G P D ) ( $ ) Re p a i r Flow ( GPD )Cumlative Cost ( $ )Cumlative Pr o j e c t N u m b e r 18 - 2 9 2 5 - 0 0 Co p p e l l , T X 2 0 1 5 S S E S P a r t 2 A CO P - 1 0 S S 2 1 6 6 42 4 N M o o r e R d In f l o w F r a m e S e a l Re p a i r F r a m e S e a l 1, 4 4 0 $ 7 5 0 0 . 5 2 1 230,907 $8,600 CO P - 1 0 S S 2 1 7 5 25 0 N a t c h e s T r a c e In f l o w F r a m e S e a l Re p a i r F r a m e S e a l 1, 4 4 0 $ 7 5 0 0 . 5 2 1 232,347 $9,350 CO P - 1 5 S S 0 1 4 8 23 4 P a r k w a y B l v d In f l o w F r a m e S e a l Re p a i r F r a m e S e a l 72 0 $ 7 5 0 1 . 0 4 2 233,067 $10,100 CO P - 0 7 S S 0 1 0 7 62 3 G l e n L a k e s D r In f l o w F r a m e S e a l Re p a i r F r a m e S e a l 72 0 $ 7 5 0 1 . 0 4 2 233,787 $10,850 CO P - 0 7 S S 1 8 1 6 62 3 G l e n L a k e s D r In f l o w F r a m e S e a l Re p a i r F r a m e S e a l 72 0 $ 7 5 0 1 . 0 4 2 234,507 $11,600 CO P - 1 0 S S 2 1 7 0 54 6 N D e n t o n T a p R d In f l o w F r a m e S e a l Re p a i r F r a m e S e a l 72 0 $ 7 5 0 1 . 0 4 2 235,227 $12,350 CO P - 1 0 S S 2 1 7 2 20 8 R u s t i c M e a d o w W a y I n f l o w F r a m e S e a l Re p a i r F r a m e S e a l 72 0 $ 7 5 0 1 . 0 4 2 235,947 $13,100 CO P - 1 0 S S 2 3 7 0 38 5 N D e n t o n T a p R d In f l o w F r a m e S e a l Re p a i r F r a m e S e a l 72 0 $ 7 5 0 1 . 0 4 2 236,667 $13,850 CO P - 1 0 S S 2 1 6 4 42 0 P a r k w o o d L n In f l o w F r a m e S e a l Re p a i r F r a m e S e a l 72 0 $ 7 5 0 1 . 0 4 2 237,387 $14,600 CO P - 0 7 S S 1 8 1 3 63 4 G l e n L a k e s D r In f l o w F r a m e S e a l Re p a i r F r a m e S e a l 72 0 $ 7 5 0 1 . 0 4 2 238,107 $15,350 CO P - 0 7 S S 1 8 1 6 62 3 G l e n L a k e s D r In f l o w B r o k e n F r a m e R e p l a c e F r a m e a n d C o v e r 1 7 3 $ 9 5 0 5 . 4 9 8 238,280 $16,300 To t a l S o u r c e s : 40 To t a l F l o w (g p d ) : 2 91 , 1 0 0 To t a l Co s t : $1 6 , 3 0 0 We d n e s d a y , J a n u a r y 0 4 , 2 0 1 7 Page 2 of 2 APPENDIX F Sonar Inspections Report City of Coppell Sonar Analysis Client:City of Coppell Date:2/24/2016 Location:COPPELL Direction:Downstream Volume of Debris: 0 ft^3 AssetID:SS2173_SS2174 Pipe size:24 Max Debris Height: 0 in USMH_AssetID: SS2173 Pipe type:VCP Min Debris Height: 0 in DSMH_AssetID:SS2174 Weather:Dry Percent Overall: 0 % Pipe Length:24.4 Inspected Length:24.4 Remarks:0.0 Comments r 12.000 Pipe Pipe Volume Debris Water Adiff Volume Percent a 2Theta h Aarc 2Atri Length Pipe Level approx approx overall Size (in.)ft.in^3 in.in in^2 in^3 %in degrees in in^2 in^2 24 0.0 132296.7 0.0 14.4 0.000 0.000 0 0.000 0.000 0.000 0.000 0.000 24 5.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 10.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 15.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 20.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 25.0 0.0 14.4 0.000 0.000 Project Information Debris 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 55.0 60.0 0. 0 De p t h o f D e b r i s ( b l u e ) ; W a t e r ( r e d ) Length of Pipe 2181_2182 1 of 13 5/11/2016 City of Coppell Sonar Analysis Client:City of Coppell Date:2/24/2016 Location:COPPELL Direction:Downstream Volume of Debris: 0 ft^3 AssetID:SS2174_SS2175 Pipe size:24 Max Debris Height: 0 in USMH_AssetID: SS2174 Pipe type:VCP Min Debris Height: 0 in DSMH_AssetID:SS2175 Weather:DRY Percent Overall: 0 % Pipe Length:383.0 Inspected Length:383.0 Remarks:0.0 Comments r 12.000 Pipe Pipe Volume Debris Water Adiff Volume Percent a 2Theta h Aarc 2Atri Length Pipe Level approx approx overall Size (in.)ft.in^3 in.in in^2 in^3 %in degrees in in^2 in^2 24 0.0 2079181.4 0.0 12 0.000 0.000 0 0.000 0.000 0.000 0.000 0.000 24 5.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 10.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 15.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 20.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 25.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 30.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 35.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 40.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 45.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 50.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 55.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 60.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 65.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 70.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 75.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 80.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 85.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 90.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 95.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 100.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 105.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 110.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 115.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 120.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 125.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 130.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 135.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 140.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 145.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 150.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 155.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 160.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 165.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 170.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 175.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 180.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 185.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 190.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 195.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 200.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 205.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 210.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 215.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 220.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 225.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 230.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 235.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 240.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Debris 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 0. 0 20 . 0 40 . 0 60 . 0 80 . 0 10 0 . 0 12 0 . 0 14 0 . 0 16 0 . 0 18 0 . 0 20 0 . 0 22 0 . 0 24 0 . 0 26 0 . 0 28 0 . 0 30 0 . 0 32 0 . 0 34 0 . 0 36 0 . 0 38 0 . 0 De p t h o f D e b r i s Length of Pipe 2182_2183 2 of 13 5/11/2016 City of Coppell 24 245.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 250.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 255.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 260.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 265.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 270.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 275.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 280.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 285.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 290.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 295.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 300.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 305.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 310.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 315.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 320.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 325.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 330.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 335.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 340.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 345.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 350.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 355.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 360.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 365.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 370.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 375.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 380.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 385.0 0.0 12 0.000 0.000 3 of 13 5/11/2016 City of Coppell Sonar Analysis Client:City of Coppell Date:2/24/2016 Location:COPPELL Direction:Downstream Volume of Debris: 0 ft^3 AssetID:SS2175_SS2176 Pipe size:24 Max Debris Height: 0 in USMH_AssetID: SS2175 Pipe type:RCP Min Debris Height: 0 in DSMH_AssetID:SS2176 Weather:DRY Percent Overall: 0 % Pipe Length:670.0 Inspected Length:670.0 Remarks:0.0 Comments r 12.000 Pipe Pipe Volume Debris Water Adiff Volume Percent a 2Theta h Aarc 2Atri Length Pipe Level approx approx overall Size (in.)ft.in^3 in.in in^2 in^3 %in degrees in in^2 in^2 24 0.0 3637210.3 0.0 14.4 0.000 0.000 0 0.000 0.000 0.000 0.000 0.000 24 5.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 10.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 15.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 20.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 25.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 30.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 35.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 40.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 45.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 50.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 55.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 60.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 65.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 70.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 75.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 80.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 85.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 90.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 95.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 100.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 105.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 110.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 115.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 120.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 125.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 130.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 135.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 140.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 145.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 150.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 155.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 160.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 165.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 170.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 175.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 180.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 185.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 190.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 195.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 200.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 205.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 210.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 215.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 220.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 225.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 230.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 235.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 240.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 245.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 250.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 255.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 De… 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 0. 0 50 . 0 10 0 . 0 15 0 . 0 20 0 . 0 25 0 . 0 30 0 . 0 35 0 . 0 40 0 . 0 45 0 . 0 50 0 . 0 55 0 . 0 60 0 . 0 65 0 . 0 De p t h o f D e b r i s Length of Pipe 2183_2184 4 of 13 5/11/2016 City of Coppell 24 260.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 265.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 270.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 275.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 280.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 285.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 290.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 295.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 300.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 305.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 310.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 315.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 320.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 325.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 330.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 335.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 340.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 345.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 350.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 355.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 360.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 365.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 370.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 375.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 380.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 385.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 390.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 395.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 400.0 2.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 405.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 410.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 415.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 420.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 425.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 430.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 435.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 440.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 445.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 450.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 455.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 460.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 465.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 470.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 475.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 480.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 485.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 490.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 495.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 500.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 505.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 510.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 515.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 520.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 525.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 530.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 535.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 540.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 545.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 550.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 555.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 560.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 565.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 570.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 575.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5 of 13 5/11/2016 City of Coppell 24 580.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 585.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 590.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 595.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 600.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 605.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 610.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 615.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 620.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 625.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 630.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 635.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 640.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 645.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 650.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 655.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 660.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 665.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 670.0 0.0 14.4 0.000 0.000 6 of 13 5/11/2016 City of Coppell Sonar Analysis Client:City of Coppell Date:2/24/2016 Location:COPPELL Direction:Downstream Volume of Debris: 0 ft^3 AssetID:SS2176_SS1332A Pipe size:24 Max Debris Height: 0 in SS2176 Pipe type:RCP Min Debris Height: 0 inUSMH_AssetID: DSMH_AssetID: Weather:DRY Percent Overall: 0 % Pipe Length:133.0 Inspected Length:133.0 Remarks:0.0 Comments r 12.000 Pipe Pipe Volume Debris Water Adiff Volume Percent a 2Theta h Aarc 2Atri Length Pipe Level approx approx overall Size (in.)ft.in^3 in.in in^2 in^3 %in degrees in in^2 in^2 24 0.0 722013.4 0.0 9.6 0.000 0.000 0 0.000 0.000 0.000 0.000 0.000 24 5.0 0.0 9.6 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 10.0 0.0 9.6 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 15.0 0.0 9.6 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 20.0 0.0 9.6 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 25.0 0.0 9.6 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 30.0 3.2 0.0 9.6 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 35.0 0.0 9.6 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 40.0 0.0 9.6 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 45.0 0.0 9.6 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 50.0 0.0 9.6 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 55.0 0.0 9.6 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 60.0 0.0 9.6 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 65.0 0.0 9.6 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 70.0 0.0 9.6 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 75.0 0.0 9.6 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 80.0 0.0 9.6 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 85.0 0.0 9.6 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 90.0 0.0 9.6 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 95.0 0.0 9.6 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 100.0 0.0 9.6 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 105.0 0.0 9.6 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 110.0 0.0 9.6 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 115.0 0.0 9.6 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 120.0 0.0 9.6 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 125.0 0.0 9.6 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 130.0 0.0 9.6 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 135.0 0.0 9.6 0.000 0.000 De… 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 0. 0 50 . 0 10 0 . 0 De p t h o f D e b r i s Length of Pipe 2184_2184U 7 of 13 5/11/2016 SS1332A City of Coppell Sonar Analysis Client:City of Coppell Date:2/24/2016 Location:COPPELL Direction:Downstream Volume of Debris: 0 ft^3 AssetID:SS1332_SS1332A Pipe size:24 Max Debris Height: 0 in Pipe type:RCP Min Debris Height: 0 inUSMH_AssetID: DSMH_AssetID:SS1332A Weather:Dry Percent Overall: 0 % Pipe Length:1330.0 Inspected Length:1330.0 Remarks:0.0 Comments r 12.000 Pipe Pipe Volume Debris Water Adiff Volume Percent a 2Theta h Aarc 2Atri Length Pipe Level approx approx overall Size (in.)ft.in^3 in.in in^2 in^3 %in degrees in in^2 in^2 24 0.0 7220133.9 0.0 14.4 0.000 0.000 0 0.000 0.000 0.000 0.000 0.000 24 5.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 10.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 15.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 20.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 25.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 30.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 35.0 4.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 40.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 45.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 50.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 55.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 60.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 65.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 70.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 75.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 80.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 85.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 90.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 95.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 100.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 105.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 110.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 115.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 120.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 125.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 130.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 135.0 4.5 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 140.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 145.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 150.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 155.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 160.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 165.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 170.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 175.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 180.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 185.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 190.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 195.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 200.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 205.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 210.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 215.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 220.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 225.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 230.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 235.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 240.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 245.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 #REF! De… 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 0. 0 50 . 0 10 0 . 0 15 0 . 0 20 0 . 0 25 0 . 0 30 0 . 0 35 0 . 0 40 0 . 0 45 0 . 0 50 0 . 0 55 0 . 0 60 0 . 0 65 0 . 0 70 0 . 0 75 0 . 0 80 0 . 0 85 0 . 0 90 0 . 0 95 0 . 0 10 0 0 . 0 10 5 0 . 0 11 0 0 . 0 11 5 0 . 0 12 0 0 . 0 12 5 0 . 0 13 0 0 . 0 De p t h o f D e b r i s Length of Pipe 2184U_1339 8 of 13 5/11/2016 SS1332 City of Coppell 24 250.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 255.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 260.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 265.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 270.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 275.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 280.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 285.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 290.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 295.0 1.5 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 300.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 305.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 310.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 315.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 320.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 325.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 330.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 335.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 340.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 345.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 350.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 355.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 360.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 365.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 370.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 375.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 380.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 385.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 390.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 395.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 400.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 405.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 410.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 415.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 420.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 425.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 430.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 435.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 440.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 445.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 450.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 455.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 460.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 465.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 470.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 475.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 480.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 485.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 490.0 3.1 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 495.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 500.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 505.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 510.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 515.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 520.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 525.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 530.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 535.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 540.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 545.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 550.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 555.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 560.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 565.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 9 of 13 5/11/2016 City of Coppell 24 570.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 575.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 580.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 585.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 590.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 595.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 600.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 605.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 610.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 615.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 620.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 625.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 630.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 635.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 640.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 645.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 650.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 655.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 660.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 665.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 670.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 675.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 680.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 685.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 690.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 695.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 700.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 705.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 710.0 1.2 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 715.0 2.4 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 720.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 725.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 730.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 735.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 740.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 745.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 750.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 755.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 760.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 765.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 770.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 775.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 780.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 785.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 790.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 795.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 800.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 805.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 810.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 815.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 820.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 825.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 830.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 835.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 840.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 845.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 850.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 855.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 860.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 865.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 870.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 875.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 880.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 885.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 10 of 13 5/11/2016 City of Coppell 24 890.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 895.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 900.0 2.9 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 905.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 910.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 915.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 920.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 925.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 930.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 935.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 940.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 945.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 950.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 955.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 960.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 965.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 970.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 975.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 980.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 985.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 990.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 995.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1000.0 1.9 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1005.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1010.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1015.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1020.0 1.2 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1025.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1030.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1035.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1040.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1045.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1050.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1055.0 1.4 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1060.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1065.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1070.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1075.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1080.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1085.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1090.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1095.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1100.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1105.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1110.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1115.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1120.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1125.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1130.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1135.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1140.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1145.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1150.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1155.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1160.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1165.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1170.0 1.4 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1175.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1180.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1185.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1190.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1195.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1200.0 2.2 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1205.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 11 of 13 5/11/2016 City of Coppell 24 1210.0 3.6 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1215.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1220.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1225.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1230.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1235.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1240.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1245.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1250.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1255.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1260.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1265.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1270.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1275.0 3.1 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1280.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1285.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1290.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1295.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1300.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1305.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1310.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1315.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1320.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1325.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1330.0 0.0 14.4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 1335.0 0.0 14.4 0.000 0.000 12 of 13 5/11/2016 City of Coppell Sonar Analysis Client:City of Coppell Date:2/24/2016 Location:COPPELL Direction:Downstream Volume of Debris: 0 ft^3 AssetID:SS1332_SS1333 Pipe size:24 Max Debris Height: 0 in USMH_AssetID: SS1332 Pipe type:RCP Min Debris Height: 0 in DSMH_AssetID:SS1333 Weather:DRY Percent Overall: 0 % Pipe Length:235.0 Inspected Length:235.0 Remarks:0.0 Comments r 12.000 Pipe Pipe Volume Debris Water Adiff Volume Percent a 2Theta h Aarc 2Atri Length Pipe Level approx approx overall Size (in.)ft.in^3 in.in in^2 in^3 %in degrees in in^2 in^2 24 0.0 1275737.9 0.0 12 0.000 0.000 0 0.000 0.000 0.000 0.000 0.000 24 5.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 10.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 15.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 20.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 25.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 30.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 35.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 40.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 45.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 50.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 55.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 60.0 1.7 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 65.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 70.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 75.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 80.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 85.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 90.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 95.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 100.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 105.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 110.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 115.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 120.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 125.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 130.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 135.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 140.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 145.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 150.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 155.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 160.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 165.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 170.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 175.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 180.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 185.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 190.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 195.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 200.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 205.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 210.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 215.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 220.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 225.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 230.0 0.0 12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24 235.0 0.0 12 0.000 0.000 De… 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 0. 0 50 . 0 10 0 . 0 15 0 . 0 20 0 . 0 De p t h o f D e b r i s Length of Pipe 1339_1340 13 of 13 5/11/2016