Loading...
Waterside P3-LR 950916FUGRO-McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75~.9 Ph (214) 484-8301; Fax (214) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Standard Pacific of Texas Report Date: September 16, 1995 PROJECT: Waterside Estates #3, CoppeH, Texas Project No.: o751-2031 CONTRACTOR: Cullum Construction TICKET NO.: CONCRETE SUPPLIER: Pioneer AMBIENT TEMP. CF): PLANT/TRUCK: CONCRETE TEMP. (oF): MIX ID NUMBER: TIME BATCH'ED: AIR (%) (AS~M C-aZ1) TIME SAMPLED: WATER ADDED: WEATHER CONDITION: SLUMP (inches) (ASTM LOCATION OF PLACEMENT: Inlets top at Cove Drive, station 2+62 CYLINDER AGE DATE TOTAL LOAD COMPRESSIVE REQUIRED COMPRESSI'vrK NUMBER (days) TESTED (pounds) STRENGTIt STRENGTH (psO (psi) WSP 16 7 07/28/95 55000 1946 4000/28 days WSP 17 28 08/18/95 90800 3212 * WSP 18 28 08/18/95 90000 3184 * WSP 19 56 09/15/95 115000 4068 SpecLficatio~s: Makin~ & Curing: A~TM C-31 Testing: Methods: ASTM C-143, ASTM C-39 REMARKS: Cylinders cast by Contractor. All information except test data furnished by Contractor and assumed to be · Does not meet project specifications for required compressive strength. Technician: Jose Rivera FUGRO-McCLELLAND (SOUTHWEST), INC. Checked By: ~-'9~'~/'~ SMH/so Distribution: Standard Pacific of Texas - Randy Lockhaxt City of Coppell - Lar~y Davis ~