ST0502B-CS180126 Priscilla Martinez From:Marcus Marion Sent:Friday, January 26, 2018 3:02 PM To:Priscilla Martinez Subject:FW: Freeport - RFI 04 - Phasing Change This is a correspondence for Freeport Parkway From: Darryl Zbranek Sent: Friday, January 26, 2018 1:11 PM To: Kent Collins <KCollins@coppelltx.gov>; George Marshall <GMarshall@coppelltx.gov>; Marcus Marion <MMarion@coppelltx.gov> Subject: RE: Freeport - RFI 04 - Phasing Change Kent, Met with Jerry and there are no particular concerns with the phasing changes. I did notice there are 3 water line crossings that are not on their schedule: 1. Water service crossing at Sta. 48+70.81 2. 8” water line crossing at Sta. 53+54.11 (Burns Street) 3. 8” water line crossing at Sta. 66+95.90 There were some questions that came up about the Contractors means and methods pertaining to tie-ins, chlorination, flushing, testing, and sampling that we can discuss with the contractor at the appropriate time before the water line work starts. If you have any questions please let me know. Thanks, DZ From: Kent Collins Sent: Thursday, January 25, 2018 9:28 AM To: George Marshall <GMarshall@coppelltx.gov>; Darryl Zbranek <dzbranek@coppelltx.gov>; Marcus Marion <MMarion@coppelltx.gov> Subject: RE: Freeport - RFI 04 - Phasing Change I believe the discussion was that if it is, a bridge pier could be adjusted to accommodate without any significant problems. But, perhaps we put that burden on them to verify before they proceed down this path. Kent Collins, P.E. Assistant Director of Public Works - Engineering 972-304-7019 From: George Marshall Sent: Thursday, January 25, 2018 9:07 AM To: Kent Collins <KCollins@coppelltx.gov>; Darryl Zbranek <dzbranek@coppelltx.gov>; Marcus Marion 1 <MMarion@coppelltx.gov> Subject: RE: Freeport - RFI 04 - Phasing Change My only question is can they verify that the existing waterline is not in the way of any of the bridge piers. That is a big hurdle. George S. Marshall, P.E. Engineering Manager Engineering & Public Works City of Coppell, TX 972-304-3562 (office) www.coppelltx.gov From: Kent Collins Sent: Thursday, January 25, 2018 7:37 AM To: George Marshall <GMarshall@coppelltx.gov>; Darryl Zbranek <dzbranek@coppelltx.gov>; Marcus Marion <MMarion@coppelltx.gov> Subject: FW: Freeport - RFI 04 - Phasing Change Please review and advise of any concerns. Thanks, Kent Kent Collins, P.E. Assistant Director of Public Works - Engineering 972-304-7019 From: Eric Giebelhaus \[mailto:Eric.Giebelhaus@strlco.com\] Sent: Friday, January 19, 2018 12:51 PM To: Kent Collins <KCollins@coppelltx.gov> Subject: Freeport - RFI 04 - Phasing Change See attached. Eric Giebelhaus Project Manager– North Texas Division Texas Sterling Construction Co. | 1441 Airport Freeway Suite 350, Euless, Texas 76040 | | 469.346.8085 Cell | 2