Loading...
CF-Coppell Rd SC-LR011001 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Texas Unified Constructors, Inc. DATE: 1 October 2001 PROJECT: Field Service Offices & Maintenance Fac. JOB NO.: 01.1054 Coppell, TX MATERIAL DESCRIPTION: 1) On-Site Fill - Dark Grey Clay ASTM D 698 STANDARD PROCTOR: 1) 95.0 pcf @ 22.0% Moisture MOISTURE DRY PERCENT REQUIRED LOCATION PROCTOR LIFT CONTENT DENSITY COMPACTION COMPACTION % PCF % % BELOW Backfill Over 8" Water Line SUBGRADE 40) approx. 150' east of Coppell Rd. 1 Fin. Sub. 21.9 93.3 98.2 95+ 41) approx. 150' east of Coppell Rd. 1 1' 21.9 96.3 101.4 Optimum +/- 2% Backfill Over 8" Water Tap, West Side of Coppell Road 42) south side 1 2'-3' 20.0 97.0 102.1 43) east side 1 0'-1' 22.6 91.8 96.6 NOTE: All tests taken passed the project requirements. TECHNICIAN: CDJ ~~l~ -~'~ ~ DISTRIBUTION: (3) City of Coppell (1) Vidaud & Associates (1) Dovle Engineering Group (1) Texas Unified Constructors, Inc, 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF WATER PRESSURE INJECTION CLIENT: Texas Unified Constructors, Inc. DATE: 1 October 2001 PROJECT: Field Service Offices & Maintenance Fac. JOB NO.: 01.1054 for City of Coppell, TX TIME: 9:00am-10:O0am SUPPLIER: Kenneth Moore 11:00am-1 2:00 N 1:30pm-3:30pm 4.0 hours LOCATION: Building Pads (see below) NUMBER OF RIGS USED: 1 PROCEDURE: On 1 October 2001, a representative of Hooper Engineering Laboratories, Inc. visited the above named project during the time in which water pressure injection was taking place. During that time, he noted the following: SPECIFICATION REQUIREMENTS INSPECTION RESULTS: 1. Injection pressure 50 psi to 200 psi. 200, 200 2. Injection downward in approx. 12" intervals until refusal Yes (If No, see remarks below.) 3. Total depth of injection - 10 feet Yes (If No, see remarks below.) 4. Spacing for injection approx. 5 feet maximum. Yes (If No, see remarks below.) NOTES: Pass //4 (one-fourth) on Covered Storage pad. Pass //5 completed on Sservice Center and on Secured Storage pads. Pass #4 completed on Chemical Storage pad. DISTRIBUTION: (3) City of Coppelt (1) Vidaud & Associates (1) Texas Unified Constructors, Inc. (1) Doyle Engineering Group 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148