Coppell CC 1B1-LR011010 ALLIANCE GEOTECHNICAL GROUP CONSULTING ENGINEERING * GEO TECHNICAL ENGINEERING * CONSTRUCTION MATERIALS 10610 Newkrik Street, Suite 202, Dallas, Texas 75220 Phone:972-444-8889 Fax: 972-444-8893 CONCRETE CORE COMPRESSION TEST REPORT CLIENT: Koll Development Company DISTRIBUTION: PROJECT: Koll Center - Coppell Koll Development Company - James Williams REPORT DATE: 10/10/01 (rev.1) Hill & Wilkerson, Inc. - Kirk Woltman AGG REPORT #: C01-0206-249A Alliance Architects - Tom Maxwell AECC, Inc. - Andy Brundige City of Coppell - Lee Stone City of Coppell - Larry Davis PROJECT DATA Placement Date: Drilled By: Mike Chism Date Drilled: 10/3/01 Moisture Condition at Time of Test: Surface Dry Date Tested: 10/5/01 Nominal Max. Size of Aggregate: Age at Test: Design Strength (psi): 4000 CONCRETE COMPRESSION TEST RESULTS CONCRETE CORED IN ACCORDANCE WITH ASTM C42, CURED (IF APPLICABLE) PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 CORE I.D. CORE CAPPED DIAMETER DIAMETER AVERAGE AREA MAXIMUM L/D CORRECTION CORRECTED LENGTH LENGTH, L 1 2 DIAMETER, D LOAD FACTOR STRENGTH (in.) (in.) (in.) (in.) (in.) (in2) (lbs.) (psi) 1 - A 6.90 6.60 3.88 11.82 67,200 1.70 0.98 5570 1 - B 6.60 6.60 3.88 11.82 61,550 1.70 0.98 5100 1 - C 7.15 6.50 3.88 11.82 60,840 1.68 0.97 4990 2 - A 5.65 5.50 3.88 11.82 73,050 1.42 0.95 5870 2 - B 5.75 5.50 3.88 11.82 69,030 1.42 0.95 5550 2 - C 5.35 5.15 3.88 11.82 75,340 1.33 .094 5990 3 - A 8.90 7.90 3.88 11.82 58,920 2.04 1.00 4980 3 - B 8.75 7.90 3.88 11.82 61,930 2.04 1.00 5240 3 - C 8.75 7.90 3.88 11.82 53,190 2.04 1.00 4500 LOCATION OF DRILLED CORES CORE I.D. LOCATION 1 - A 10' North by 60' West of the Southwest Corner of Building #2 (Placed on 6/20/01) I - B 10' North by 60' West of the Southwest Corner of Building #2 (Placed on 6/20/01) 1 - C 10' North by 60' West of the Southwest Corner of Building #2 (Placed on 6/20/01) 2 - A 25' South by 50' East of the Southwest Corner of Building #1 (Placed on 7/16/01) 2 - B 25' South by 50' East of the Southwest Corner of Building #1 (Placed on 7/16/01) 2 - C 25' South by 50' East of the Southwest Corner of Building #1 (Placed on 7/16/01) 3 - A 110' South by 90' East of the Southwest Corner of Building #3 ( Placed on 7/25/01) 3 - B 110' South by 90' East of the Southwest Corner of Building #3 ( Placed on 7/25/01) 3 - C 110' South by 90' East of the Southwest Corner of Building #3 ( Placed on 7/25/01) Note: This rep°rt is f°r the exclusive use of the Client addressed'l This report may not be reproduced except in its entirety, without I the written consent of AGG. Results apply only to above tests. I ALLIANCE NICAL GROUP ALLIANCE GEOTECHNICAL GROUP CONSULTING ENGINEERING * GEOTECHNICAL ENGINEERING * CONSTRUCTION MATERIALS ~0610 Newkrik Street, Suite 202, Dallas, Texas 75220 Phone:972-444-8889 Fax: 97'2-444-8893 CONCRETE CORE COMPRESSION TEST REPORT CLIENT: Koll Development Company DISTRIBUTION: PROJECT: Koll Center - Coppell Koll Development Company - James Williams REPORT DATE: 10/10/01 (rev.1) Hill & Wilkerson, Inc. - Kirk Woltman AGG REPORT #: C01-0206-249A Alliance Architects - Tom Maxwell AECC, Inc. - Andy Brundige City of Coppell - Lee Stone City of Coppell - Larry Davis PROJECT DATA Placement Date: Drilled By: Mike Chism Date Drilled: 10/3/01 Moisture Condition at Time of Test: Surface Dry Date Tested: 10/5/01 Nominal Max. Size of Aggregate: Age at Test: Design Strength (psi): 4000 CONCRETE COMPRESSION TEST RESULTS CONCRETE CORED IN ACCORDANCE WITH ASTM C42, CURED (IF APPLICABLE) PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 CORE I.D. CORE CAPPED DIAMETER DIAMETER AVERAGE AREA MAXIMUM I../D CORRECTION CORRECTED LENGTH LENGTH, L t 2 DIAMETER, D LOAD FACTOR STRENGTH (in.) (in.) (in.) (in.) (in.) (in2) (lbs.) (psi) 4 - A 7.15 7.00 3.88 11.82 39,890 1.80 1.00 3370* 4 - B 6.50 6.60 3.88 11.82 45,080 1.70 0.98 3740* 4 - C 6.60 6.60 3.88 11.82 41,620 1.70 0.98 3450* 5 - A 9.85 7.90 3.88 11.82 49,090 2.04 1.00 4150 5 - B 9.15 7.90 3.88 11.82 47,820 2.04 1.00 4050 5 - C 8.80 7.85 3.88 11.82 49,270 2.02 1.00 4170 6 - A 8.25 7.65 3.88 11.82 65,670 1.94 1.00 5560 6 - B 9.50 7.90 3.88 11.82 66,230 2.04 1.00 5600 6 - C 8.50 7.85 3.88 11.82 66,610 2.02 1.00 5640 LOCATION OF DRILLED CORES CORE I.D. LOCATION 4 - A 100' South by 25' East of the Northeast Corner of Building] #3 (Placed on 7/25/01 4 - B 100' South by 25' East of the Northeast Corner of Building #3 (Placed on 7/25/01) 4 - C 100' South by 25' East of the Northeast Corner of Building #3 (Placed on 7/25/01 5 - A Approach on the West Side of Building #3 (Placed on 7/16/01) 5 - B Approach on the West Side of Building #3 (Placed on 7/16/01) 5 - C Approach on the West Side of Building #3 (Placed on 7/16/01) 6 - A 20' North by 50' West of the Northwest Corner of Building #2 (Placed on 6/12/01 6 - B 20' North by 50' West of the Northwest Corner of Building #2 (Placed on 6/12/01 6 - C 20' North by 50' West of the Northwest Corner of Building #2 (Placed on 6/12/01) INote: This report is for the exclusive use of the Client addressed. IThis report may not be reproduced except in its entirety, without _ ~the written consent of AGG. Results apply only to above tests. I ALLIANCE GEOTECHNICAL GROUP ALLIANCE GEOTECHNICAL GROUP CONSULTING ENGINEERING * GEOTECHNICAL ENGINEERING * CONSTRUCTION MATERIALS 10610 Newkrik Street, Suite 202, Dallas, Texas 75220 Phone:972-444-8889 Fax: 972-444-8893 CONCRETE CORE COMPRESSION TEST REPORT CLIENT: Koll Development Company DISTRIBUTION: PROJECT: Koll Center - Coppell Koll Development Company - James Williams REPORT DATE: 10/10/01 (rev. 1) Hill & Wilkerson, Inc. - Kirk Woltman AGG REPORT #: C01-0206-249A Alliance Architects - Tom Maxwell AECC, Inc. - Andy Brundige City of Coppell - Lee Stone City of Coppell - Larry Davis PROJECT DATA Placement Date: Drilled By: Mike Chism Date Drilled: 10/3/01 Moisture Condition at Time of Test: Surface Dry Date Tested: 10/5/01 Nominal Max. Size of Aggregate: Age at Test: Design Strength (psi): 4000 CONCRETE COMPRESSION TEST RESULTS CONCRETE CORED IN ACCORDANCE WITH ASTM C42, CURED (IF APPLICABLE) PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 CORE I.D. CORE CAPPED DIAMETER DIAMETER AVERAGE AREA MAXIMUM I_/D CORRECTION CORRECTED LENGTH LENGTH, L I 2 DIAMETER, D LOAD FACTOR STRENGTH (in.) (in.) (in.) (in.) (in.) (in2) (lbs.) (psi) 7 - a 7.85 7.75 3.88 11.82 56,610 2.00 1.00 4790 7 - B 8.35 7.90 3.88 11.82 50,880 2.04 1.00 4300 7 - C 8.0 7.75 3.88 11.82 50,560 2.00 1.00 4280 8 - A 4.65 4.65 3.88 11.82 54,990 1.20 0.92 4280** 8 - B 4.50 4.40 3.88 11.82 71,780 1.13 0.90 5470 8 - C 4.85 4.75 3.88 11.82 62,090 1.22 0.92 4830 9 - A 6.90 6.40 3.88 11.82 49,600 1.65 0.97 4070 9 - B 6.00 5.50 3.88 11.82 63,260 1.42 0.95 5080 9 - C 6.85 6.15 3.88 11.82 53,370 1.59 0.97 4380 LOCATION OF DRILLED CORES CORE I.D. LOCATION 7-A 50' South by 50' West of Northwest Corner of Building #2 (placed on 6-20-01) 7-B 50' South by 50' West of Northwest Corner of Building #2 (placed on 6-20-01) 7-C 50' South by 50' West of Northwest Comer of Building #2 (placed on 6-20-01) 8-A 230' South by 50' West of the Northwest Corner of Building #2 ( placed on 6-20-01) 8-B 230' South by 50' West of the Northwest Corner of Building #2 ( placed on 6-20-01) 8-C 230' South by 50' West of the Northwest Corner of Building #2 ( placed on 6-20-01) 9 - A 68' North by 60' West of the Southwest Corner of Building #2 ( placed on 6-20-01) 9 - B 68' North by 60' West of the Southwest Corner of Building #2 ( placed on 6-20-01) 9 - C 68' North by 60' West of the Southwest Corner of Building #2 ( placed on 6-20-01) Notes: *Did not meet required project specification strength. · *Chair in the core INote: This report is for the exclusive use of the Client addressed.[ E~O~HN~ This report may not be reproduced except in its entirety, without I the written consent of AGG. Results apply only to above tests. I ALLIANCE G AL GROUP TELEPHONE CONVERSATION RECORD File: ~:~L_.L_. ~:>~~ ~--~ Date: Person (called, calling): Time: Representing: City: Subject: C.,~'~ ~--,~~C~'I~ Tel. No: Items Discussed: Signature: Circulate: xc to: