Loading...
Coppell Industrial-LR011001 (2) GEOTECHNICAL AND I ~ F:~ r-1 U F:3 ENVIRONMENTAL CONSULTANTS CONCR 'rEST RFPORT f lradePoint One B~thel Road and Royal I_ano ~,~ Coppell, R£PORIED TO: CP-Coppell Industrial I_ti~....~_ REPORT NO. 203 c/o Champion Partners, ltd. REG PROJECl NO. 73@4 15601 Dallas Parkway, Suite 100 SAMPL£ DATE: 10-01-01 Addison, Texas 75001 TI=CI-INIClAN: R. Hollin§s ATTN: Mr. Kerry Burden CONTRACTOR: C.D. Henderson, Inc. Location of Sample Set Number I Location I Quantity Represented 1 Paving: 35'S, 125'E of S.W. building corner 10/200 2 Paving: 20'S, 160'E of S.W. building corner 110/200 Design Information Source of Concrete J Mix Identification J Specified Strength p.s.i. Potter 7752 4000 Test Results Set Cylinder Age@ Total Load I CompressiveI Average No. ID Date Tested Test lbs. I IStrength p.s.i. Strength p.s.i. 1 3613 10-08-01 7 96100 3400 3613 10-29-01 28 3613 10-29-01 28 2 3614 10-08-01 7 125580 4440 3614 10-29-01 28 3614 10-29-01 28 Cylinder Data Set Cylinder Time of I Concrete Air I Ticket No. ID Slump Sample I Air Temp. Temp. Entrainment I Number 1 3613 5.00 10:45AM 72 76 6.0 614402 2 3614 5.00 12:30PM 76 80 5.6 614412 Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC, (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Haynes Whayley Associates, Inc./ Keith Atkins Mr. Kent Penrod (1) City of Coppell/Mr. Larry Davis KEA/je (1) City of Coppeil/Mr. Lee Stone (1) Potter Concrete/Mr. Brent Cox Extranet Distribution: (1) Meinhardt & Quintana/ Mr. David Meinhardt 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019