Coppell Industrial-LR011001 (2) GEOTECHNICAL AND I ~ F:~ r-1 U F:3
ENVIRONMENTAL CONSULTANTS
CONCR 'rEST RFPORT
f lradePoint One
B~thel Road and Royal I_ano
~,~ Coppell,
R£PORIED TO: CP-Coppell Industrial I_ti~....~_ REPORT NO. 203
c/o Champion Partners, ltd. REG PROJECl NO. 73@4
15601 Dallas Parkway, Suite 100 SAMPL£ DATE: 10-01-01
Addison, Texas 75001 TI=CI-INIClAN: R. Hollin§s
ATTN: Mr. Kerry Burden
CONTRACTOR: C.D. Henderson, Inc.
Location of Sample
Set Number I Location I Quantity Represented
1 Paving: 35'S, 125'E of S.W. building corner 10/200
2 Paving: 20'S, 160'E of S.W. building corner 110/200
Design Information
Source of Concrete J Mix Identification J Specified Strength p.s.i.
Potter 7752 4000
Test Results
Set Cylinder Age@ Total Load I CompressiveI Average
No. ID Date Tested Test lbs. I IStrength p.s.i. Strength p.s.i.
1 3613 10-08-01 7 96100 3400
3613 10-29-01 28
3613 10-29-01 28
2 3614 10-08-01 7 125580 4440
3614 10-29-01 28
3614 10-29-01 28
Cylinder Data
Set Cylinder Time of I Concrete Air I Ticket
No. ID Slump Sample I Air Temp. Temp. Entrainment I Number
1 3613 5.00 10:45AM 72 76 6.0 614402
2 3614 5.00 12:30PM 76 80 5.6 614412
Mail Submitted by:
Distribution: (1) Champion Partners, Ltd./
Mr. Kerry Burden REED ENGINEERING GROUP, INC,
(1) C.D.Henderson, Inc./
Mr. Jason Nunley Original Signed By
(1) AECC, Inc./Mr. Fran Carter
(1) Haynes Whayley Associates, Inc./ Keith Atkins
Mr. Kent Penrod
(1) City of Coppell/Mr. Larry Davis KEA/je
(1) City of Coppeil/Mr. Lee Stone
(1) Potter Concrete/Mr. Brent Cox
Extranet
Distribution: (1) Meinhardt & Quintana/ Mr. David Meinhardt
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019