Loading...
Coppell Industrial-LR010926 (2) GEOTECHNICAL AND I ~ F=] I'--I I I I=~ ENVIRONMENTAL CONSULTANTS I CONCRETE CYLINDER TEST REPORT TradePoint One Ce Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 201 c/o Champion Partners, Ltd. REG PROJECT NO. 7394 15601 Dallas Parkway, Suite 100 SAMPLE DATE: 09-26-01 Addison, Texas 75001 TECHNICIAN: L. Johnson ATTN: Mr. Kerry Burden CONTRACTOR: C.D. Henderson, Inc. Location of Sample Set Number I Location I Quantity Represented 1 Floor slab: 305'S, 2'W of N.E. building corner 40/80 Design Information I Source of Concrete I Mix Identification I Specified Strength p.s.i. Potter 9349 4000 Test Results Set Cylinder Age@ Total Load I CompressiveI Average No. ID Date Tested Test lbs. I IStrength p.s.i. Strength p.s.i. 1 3462 10-03-01 7 122900 4350 3462 10-03-01 7 121220 4290 4320 3462 10-24-01 28 3462 10-24-01 28 Cylinder Data Set1 Cylinder I Time of I Concrete Air TicketI No. ID Slump Sample Air Temp. Temp. Entrainment Number 3462 4.25 9:45AM 71 80 N/A 614394 Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Haynes Whayley Associates, Inc./ Keith Atkins Mr. Kent Penrod (1) City of Coppell/Mr. Larry Davis KENje (1) City of Coppell/Mr. Lee Stone (1) Potter Concrete/Mr. Brent Cox Extranet Distribution: (1) Meinhardt & Quintana/ Mr. David Meinhardt 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019