Loading...
ST9601-CS 980211 Coppetl. Texas 75019 COPPELL, TEXAS 75019 February 11, 1998 ASG Nikor Harrison Limited Suite 201 9220 S~I~ S~eet D~I~, Texas 75243 RE: Wrangler Drive Construction Project - ST 96-01 Dear Sir: The City of Coppell is currently fmalizing the construction plans for Wrangler Drive from Belt Line Road to Freeport Pkwy. It is our intention to put this project out to bid in late March 1998, with possible start of construction in May or early June 1998. We curren~y have necessary right-of-way from your site to construct the roadway, however, the location of the existing sidewalk across the front of your property proposes a problem in regard to elevation with the proposed street. It is the City's intent to remove and replace the sidewalk with the construction of Wrangler Drive. However, while we might have adequate right-of-way to construct the roadway, the elevation difference from the existing ground on your side to the proposed roadway proposes a problem in the reconstruction of the sidewalk. It is our intent to construct the sidewalk not entirely in right-of-way but partially on the green space between your parking lot and the right-of-way. Prior to expending City tax dollars outside the right-of-way, it will be necessary to have an easement dedicated from yourself to the City for the reconstruction of the sidewalk. Please contract me at your earliest convenience to discuss this issue and once I have adequately addressed any questions or concerns you might have I will have our consultant prepare easement documents to forward to you for signatures and execution. Thank you for your consideration of this matter. Sincerely, ~~M.~G~: P. E. Director of Engineering and Public Works file/kgriffin/ST96-01yrnca.docpc