Loading...
ST15-01A-PN180416 STAGE 2 MATCH LINE - STA 35+00 LEGEND STAGE 2 CONSTRUCTION SEQUENCING NARRATIVE: M A S T T C A H 2 L 2 I N + E 5 0 0 5 + 6 4 A T S - E N I L MATCH LINE - STA 35+00 H C T A M STAGE 2 M A T C H L I N E - S T A 1 1 + 0 0 LEGEND STAGE 1 MATCH LINE - STA 22+50 MATCH LINE - STA 11+00 STAGE 1 STAGE 1 CONSTRUCTION SEQUENCING NARRATIVE: 0 0 0 5 + + 8 6 5 4 A A T T S S - - E E N N I I L L H H C C T T A A M M STAGE 2 LEGEND STAGE 2 CONSTRUCTION SEQUENCING NARRATIVE: 0 0 + 8 5 A T S - E N I L H C T A M STAGE 2 0 0 0 5 + + 8 6 5 4 A A T T S S - - E E N N I I L L H H C C T T A A M M STAGE 2 LEGEND STAGE 2 CONSTRUCTION SEQUENCING NARRATIVE: 0 0 + 8 5 A T S - E N I L H C T A M STAGE 2 0 0 0 5 + + 8 6 5 4 A A T T S S - - E E N N I I L L H H C C T T A A M M STAGE 2 LEGEND STAGE 2 CONSTRUCTION SEQUENCING NARRATIVE: 0 0 + 8 5 A T S - E N I L H C T A M STAGE 2 STAGE 2 MATCH LINE - STA 35+00 LEGEND STAGE 2 CONSTRUCTION SEQUENCING NARRATIVE: M A S T T C A H 2 L 2 I N + E 5 0 0 5 + 6 4 A T S - E N I L MATCH LINE - STA 35+00 H C T A M STAGE 2 M A T C H L I N E - S T A 1 1 + 0 0 6 9 . 6 9 f t LEGEND WRANGLER SIGNALIZATION NOTES: CITY WILL BE RESPONSIBLE FOR MOVING HEADS, OPERATING SIGNALS, AND INTERIM SIGNALIZATION FOR THE EXISTING TEMPORARY SIGNALIZATION. CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING LOCATION OF ALL OTHER TEMPORARY SPAN WIRE SIGNALIZATION STRUCTURES AS NEEDED (DETERMINED BY CONTRACTOR) DURING CONSTRUCTION AND CONSTRUCTION PHASING. STAGE 2 FUTURE SIGNALS AT WRANGLER INTERSECTION TO BE INSTALLED BY OTHERS. CONTRACTOR TO COORDINATE INSTALLATION OF FUTURE SIGNALIZATION CONDUIT WITH SIGNALIZATION CONTRACTOR PRIOR TO EACH PAVING PHASE. MATCH LINE - STA 22+50 MATCH LINE - STA 11+00 STAGE 2 STAGE 2 CONSTRUCTION SEQUENCING NARRATIVE: STAGE 2 MATCH LINE - STA 35+00 LEGEND STAGE 2 CONSTRUCTION SEQUENCING NARRATIVE: M A S T T C A H 2 L 2 I N + E 5 0 0 5 + 6 4 A T S - E N I L MATCH LINE - STA 35+00 H C T A M STAGE 2