Loading...
ST9601-CS 980211 (2) Coppell, Texas 75019 2 C 972-462-0022  COPPELL, TEXAS 75019 February 11, 1998 Buddy EchoIs, Superintendent Coppell ISD 200 S. Denton Tap Road Coppell, Texas 75019 RE: Wrangler Drive Construction Project - ST 96-01 Dear Mr. EchoIs: The City of Coppell is currendy finalizing the construction plans for Wrangler Drive. It is our intention to put this project out to bid in late March 1998, with possible start of construction in May or ea~y June 1998. Our goal is to attempt to coordinate the start of construction with the end of school to minimize disruption. We are also attempting to provide wording in the contract to mandate that the contractor complete the section from Freeport to Enterprise as a first phase. This should allow better access to the school while the remainder of the project is under construction. In late 1997, a schematic was provided to the CISD showing proposed locations and configurations of driveways. As of this date there has been no confirmation from the CISD concerning those driveway locations or configurations and as such we are proceeding on with the project. As a reminder, five driveways are being provided to the school site: one is on the west side of the football field (this is curren~y a dirt access); one is on the east side of the football field; two are being provided to the parking lot that currently fronts onto Wrangler Drive (one on the far east end and one on the far west end); and a divided driveway is being proposed for the far east approach to the middle school. As we previously discussed, the construction of the divided drive approach at the far east end of CMS West will necessitate that the school district provide some on-site paving to accommodate traffic from Wrangler Drive to the parking lot and student drop-off on the east side of CMS West. I noticed today that it appears as though sometime in the prior weeks an irrigation system has been newly constructed in the vicinity of where the divided driveway would go and also in the vicinity of where any additional on-site paving would be required by the CISD to facilitate traffic movement. At the time of construction there will need to be coordination between the City, the City's contractor and the CISD to relocate some sprinkler heads to avoid conflict with the proposed drive approach. Again, we are f'malizing construction plans and hope to put the project out to bid in late March 1998. If you do have any concerns or questions about access to or from the school please contact me at your earliest convenience so that we can attempt to address those issues before we go out for bids. Thank you for your consideration of this matter. Kenneth M. G:~,~.E. Director of Engineering and Public Works rdc/kg~imwSTg~cchd,.d~cpc