DR16-02-CS180405
Request ForInformation
RFI No.:005
Owner: Cityof CoppellProject: Grapevine Creek BankStabilization
Contractor: Ark ContractingRefer to Drawing:Sht. 4
Engineer: Teague Nall&PerkinsAttachments:1
Problem Identification orQuestion:
Initiator of Request: Darryl Zbranek, City of CoppellDate:4-5-18
Resolution
Contractor can deletethe top row of gabion baskets and row of anchors from Sta. 0+92.00 to Sta. 1+72.22 provided
the finish grade slope from property lines to top of row 9 baskets does not exceed 6:1.
ProjectEngineer:Keith Burkholder Date:4/10/18
ResolutionBy:Keith Burkholder Company /Section:TNPTitle:_PM_Date:4/10/18