Cambridge Phase 2-CS0112054011 W. Plane Parkway, Suite 108
Piano, Texas 75093
Ph: (g72) 312-88E~
Fx: (972) 312-0675
lraulics/Hydrology
~,vil Engineering
Consulting
December .5, 2001
Mr. Matthew B. Mitler, p.F., Chief
Hazards Study Branch
Federal tnsurance and Mitigation A~tion
FEM_A. LOM_A Depot
PBSEJ
! 210 ! India~ Creek Cou~
Beltsv~te, MazTla~d 20705
Re: C,~e .No. 0]-06-]984A
Estates of Cambridge Ma~or, ;Phase II, Block B, Lot 5; 6].8 Castle Creek Drive
Dear Ntt'. M~tler,
Enclosed please find a revised "CommtllaJty Acknowledgment Form" submitted in response to
comments contained in your letter dated September 26, 2001. We are also including an
engineer's certificate as requested by Mr. Kenneth M. G~ P.E.; the City of Coppell
floodplain administrator. Should you have any questions or comments, please feel free to
contact me per the information above.
Sincerely,
O'BRIEN ENGINEERING, INC.
Project Manager
Cc: Ma:. Kenneth M. Gr~ffln~ P.E.
Mr. Crreg Colley
FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B. Burden No. 3067-0147
COMMUNITY ACKNOWLEDGMENT Expires May 31, 2001
OF REQUESTS INVOLVING FILL
PUBLIC BURDEN DISCLOSURE NOTICE
Public reporting burden for this form is estimated to average .88 hour per response. The burden estimate includes the time for reviewing
instructions, searching existing data sources, gathering and maintaining the needed data, and completing and reviewing the form. Send
comments regarding the accuracy of the burden estimate and any suggestions for reducing this burden to: Information Collections Management,
Federal Emergency Management Agency, 500 C Street, S.W., Washington, DC 20472; and to the Office of Management and Budget, Paperwork
Reduction Pre DC 20503.
You are not required to respond tO this collection of information unless a valid OMB Control Number is displayed in the
:orner of this form.
We hereby acknowledge receipt and review of this Letter of Map Revision (Based on Fill) request and have found that the completed or proposed
project meets or is designed to meet all of [he community's applicable flo~lplain, management regulations, including the requirement that no fill De
~ced in the regulatory floodway. We understand that this request is being forwarded to FEMA for a possible map revision. For proposed
projects, we understand that FEMA is being asked to provide comments on the potential effects of this project on the flood hazards of our
community.
Community comments on the proposed project:
I
Community Official's Name (please print or type): ~-. e Vt V~ e J/~ I~ · ~ ~- I F I::: ~,~ ~ 'i~. ~-.
Oa~me Telephone Number: q "l ~- "~ C~
PLEASE ~EFE~ TO THE INST~U~TION~ FO~
FEMA Fo~ 81~7C Communi~ A~o~gmenl or Reques~ InvoNing ~11 Fo~ MT-I F~m 4
Lot 5, Block B of the Estates of Cambridge Manor, Phase Two
613 Castle Creek Drive
Coppell, Texas 75019
I, Jim O'Brien, certify that the house at the above mentioned property, having slab-on-grade~
construction, on properly compacted fill, and whose finished floor elevation is above the BFE, is
reasonably safe from flooding in accordance with the guidance provided within FEMA's
Technical Bulletin 10-01 related to ensuring that structures are reasonably safe fi:om flooding
and in accordance with accepted professional practices.
Jim ?;~rien 'Date
Title
License Number
Type of License ,a _
Address: 4011 W. Piano Pkwy, Suite
Plano, Texas 75019
Phone: (972) 312-8850
Professio~ Sefl
Lice~e E~kation Date