Loading...
Cambridge Phase 2-CS0112054011 W. Plane Parkway, Suite 108 Piano, Texas 75093 Ph: (g72) 312-88E~ Fx: (972) 312-0675 lraulics/Hydrology ~,vil Engineering Consulting December .5, 2001 Mr. Matthew B. Mitler, p.F., Chief Hazards Study Branch Federal tnsurance and Mitigation A~tion FEM_A. LOM_A Depot PBSEJ ! 210 ! India~ Creek Cou~ Beltsv~te, MazTla~d 20705 Re: C,~e .No. 0]-06-]984A Estates of Cambridge Ma~or, ;Phase II, Block B, Lot 5; 6].8 Castle Creek Drive Dear Ntt'. M~tler, Enclosed please find a revised "CommtllaJty Acknowledgment Form" submitted in response to comments contained in your letter dated September 26, 2001. We are also including an engineer's certificate as requested by Mr. Kenneth M. G~ P.E.; the City of Coppell floodplain administrator. Should you have any questions or comments, please feel free to contact me per the information above. Sincerely, O'BRIEN ENGINEERING, INC. Project Manager Cc: Ma:. Kenneth M. Gr~ffln~ P.E. Mr. Crreg Colley FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B. Burden No. 3067-0147 COMMUNITY ACKNOWLEDGMENT Expires May 31, 2001 OF REQUESTS INVOLVING FILL PUBLIC BURDEN DISCLOSURE NOTICE Public reporting burden for this form is estimated to average .88 hour per response. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing and reviewing the form. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing this burden to: Information Collections Management, Federal Emergency Management Agency, 500 C Street, S.W., Washington, DC 20472; and to the Office of Management and Budget, Paperwork Reduction Pre DC 20503. You are not required to respond tO this collection of information unless a valid OMB Control Number is displayed in the :orner of this form. We hereby acknowledge receipt and review of this Letter of Map Revision (Based on Fill) request and have found that the completed or proposed project meets or is designed to meet all of [he community's applicable flo~lplain, management regulations, including the requirement that no fill De ~ced in the regulatory floodway. We understand that this request is being forwarded to FEMA for a possible map revision. For proposed projects, we understand that FEMA is being asked to provide comments on the potential effects of this project on the flood hazards of our community. Community comments on the proposed project: I Community Official's Name (please print or type): ~-. e Vt V~ e J/~ I~ · ~ ~- I F I::: ~,~ ~ 'i~. ~-. Oa~me Telephone Number: q "l ~- "~ C~ PLEASE ~EFE~ TO THE INST~U~TION~ FO~ FEMA Fo~ 81~7C Communi~ A~o~gmenl or Reques~ InvoNing ~11 Fo~ MT-I F~m 4 Lot 5, Block B of the Estates of Cambridge Manor, Phase Two 613 Castle Creek Drive Coppell, Texas 75019 I, Jim O'Brien, certify that the house at the above mentioned property, having slab-on-grade~ construction, on properly compacted fill, and whose finished floor elevation is above the BFE, is reasonably safe from flooding in accordance with the guidance provided within FEMA's Technical Bulletin 10-01 related to ensuring that structures are reasonably safe fi:om flooding and in accordance with accepted professional practices. Jim ?;~rien 'Date Title License Number Type of License ,a _ Address: 4011 W. Piano Pkwy, Suite Plano, Texas 75019 Phone: (972) 312-8850 Professio~ Sefl Lice~e E~kation Date