Loading...
PA1701-CS180420 AA'vrDUIIIIAWAy Transmittal 550 Bailey Avenue, Suite 400, Fort Worth, TX 76107 PROJECT: Andrew Brown Parks DATE: 4/20/2018 Redevelopment- PH 1 B000810 SUBJECT: West Trail Connection-Andrew TRANSMITTAL ID: 00037 Brown pieLt, 1-7--0 I PURPOSE: For your review and comment VIA: Info Exchange FROM NAME COMPANY PHONE Aldo Medina 550 Bailey Avenue, Suite Dunaway Associates, amedina@dunaway- 400 L.P. assoc.com (817) 335-1121 Fort Worth TX 76107 United States TO NAME COMPANY EMAIL PHS:; GMarshall@coppelltx.gov GMarshall@coppelltx.gov jelias@coppelltx.gov jelias@coppelltx.gov Brad Reid P.O. Box 9478 City of Coppell breid@coppelltx.gov (972)462-0022 Coppell TX 75019 United States REMARKS: Hello, Please find attached the Report, HEC-RAS model and Shapefiles associated with the Andrew Brown Park-West Trail Connection project. This is for your review and comment. We have now modeled a low-water crossing instead of the pedestrian bridge we had before. In general, having a low-water crossing instead of a bridge does not in itself reduce/eliminate water surface increases. However, reducing the n-values at the concrete trail (n=0.02) and along the areas that are expected to be cleared (short grass n=.03) eliminated the increases in water surface elevation. Included in this submittal is the HEC-RAS model for your review. Please let me know if you have any questions or concerns. Thanks, Aldo Medina Page 1 of 2 Transmittal DATE 4/20/2018 TRANSMITTAL ID. 00037 DESCRIPTION OF CONTENTS QTY DATED TITLE NOTES 1 4/20/2018 810—Report-2018-0417.pdf 1 4/17/2018 Cotton_Wood_Branch.zip 1 4/20/2018 Shapefiles(City).zip COPIES Aldo Medina (Dunaway Associates) Michael Dellies Page 2 of 2