Fellowship-CS011120 Graham Associates, Inc. CONSULTING ENGINEERS & PLANNERS November 20, 2001 Mr. Kenneth M. Griffm, P.E. City of Coppell Engineering & Public Works Dept. 255 Parkway Coppell, Texas 76019 sX~ ~,4 ,X,&~ RE: Fellowship Church - Fellowship Lake Tree Survey & Mitigation Dear Mr. Griffin: Fellowship Church, through their representatives, Graham Associates, Inc., Beck Construction, Beck Architecture, and Mesa Design Group met with the City of Coppell, Engineering & Public Works Department to discuss construction of the above referenced project on Monday, November 19, 2001. The purpose of the meeting was to discuss City requirements of tree mitigation and land platting. A complete tree inventory survey has been accomplished for the construction site and was presented to staff during this meeting. The inventory survey demonstrated the areas impacted by the construction activities. The areas that have been determined to be exempt fiom tree mitigation are the lakes, dam, spillway, and the proposed soccer fields on the north side of Cottonwood Branch. The area determined to not be exempt of tree mitigation is the spoil site on the south side of Cottonwood Branch, north of Bass Pro-Bethel School Road. This area was chosen to receive earth spoil fiom the lake excavation because of minimal impact to the trees on site, and because it is the future location of baseball, football, soccer, tennis courts, and basketball court areas. The topsoil in this area will be striped in advance of the spoil operation, and replaced over the top of the spoil to facilitate re-vegetation of the site. Mesa Design Group has been authorized to proceed with formal submittal of the tree survey, tree mitigation, Developmental Plan, and Landscape Plan to be processed through Planning and Zoning Commission at their earliest convenience. Graham Associates, Inc. has been working with Public Works to obtain approval of engineering construction documents since early July of this year. Graham Associates, Inc. also has been authorized to proceed with platting of the property, as required, during construction. FSLas Colinas~FLW SHIP,Fellowship Church Lake~elesse & Hold Harmless Letter.doc Summit Office Park Centerpoint Two Bank One 1300 Summit Ave., Suite 419 616 Six Flags Drive, Suite 400 111 S. Garland Ave., Suite 202 Ft. Worth, Texas 76102 Arlington, Texas 76011 Garland, Texas 75040 (817) 332-5756 (817] 649-8530 * Metro (817] 640-8535 (972) 272-4655 FAX (81 7) 336-6909 FAX (817) 633-5240 FAX (972) 272-4655 This letter, on behalf of Fellowship Church, Graham Associates, Inc., Beck Construction, Beck Architecture, and Mesa Design Group, shall serve as your staff and Departmental release and hold harmless for responsibility of terms and conditions placed on the above stated parties by the Planning and Zoning Commission and the City Council pursuant to their review and apprOval of this project. We understand, proceeding with construction without Planning and Zoning Commission approval of the Tree Mitigation Plan, is solely at our own risk. Your Departments will not be held liable for conditions of approval placed on Fellowship Church or it's representatives by the Commission. Federal and State agencies will be notified of construction activities as required. Should you have any questions or comments, please advise. Respectfully, GRAHAM ASSOCIATES, INC. Project Manager cc: Scott A. Dyer - City of Grapevine Andrea L. Roy - City of Coppell Kenneth M. CJriff'm, P.E. - City of Coppell Craig Stovall - Fellowship Church Brandon White - Fellowship Church Kendra Howell - Beck Construction Jeff Forbes - Beck Construction James Worsham - Beck Architecture Ramon Villalba - Beck Architecture Chip Impastaito - Mesa Design Group Brad Goodman - Mesa Design Group FSLa$ ColinasXFLWSHlPWellowship Church Lake~elea~ & Hold Harmless LeV. er.doc