Loading...
ST9601-CS 980211 (3) ) P.O. Box 478 · . a ith A Beautiful Future 972-462-0022 COPPELL, TEXAS 75019 February 11, 1998 Dennis Chovan, P.E. Half Associates, Inc. 8616 Northwest Plaza Drive Dallas, Texas 75225 RE: Wrangler Drive Construction Project - ST 96-01 Dear Mr. Chovan: This letter is written as a follow-up to a meeting we held in October 1997 discussing drainage along the north side of Wrangler Drive as it intersects Belt Line Road. At that time, the ATT Call Center was proposed to be built at the northwest comer of Wrangler Drive and Belt Line Road. Because of drainage and other considerations the ATT Call Center chose to relocate to the southwest comer of Airline Drive and Belt Line Road. However, subsequent to the meeting there was conversation about whether or not the developers or owners of the property were interested in participating in the construction of the drainage which will be on their property running west to east on the north side of Wrangler Drive. I am unsure if there will be any financial savings to the developer to participate at this time, however, we are fmalizing the construction plans and hope to go out for bids in late March 1998 for the construction of Wrangler Drive. If the developer wants to pursue the inclusion of that drainage system as part of this project and pay for the same, then a completed set of construction plans for the drainage should be provided to the City along with commitments from the developer or owner of the property that they will fund the construction of the drainage system. As you are well aware, one of the issues with the drainage system is the existing gas line along the north side of Wrangler Drive. The gas line will need to be lowered to accommodate the construction of an on-site drainage system in the future not only for the referenced site but also potentially at a drainage stubout opposite Crestside Drive that will accommodate drainage from the property north of Wrangler Drive. Please contact this office to let me know your current plans for providing construction plans and for funding the construction of the aforementioned drainage system. If you should have any questions or need any additional information please feel free to contact me at your convenience. Sincerely, , ~ ~,~rl~~ M , P.E. Director of Engineering and Public Works file/kgriffin/ST96-01hal~tr.doclx: