Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
ST1501A-CS180425 (3)
1723 - Freeport Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendarAMJJASONDJFMAMJJASOND DurationDuration 01201220120012312201100122012011201220120112012201201120022011201230120112012 3102131021020 346334009-Apr-18 14-Oct-191723 - Freeport 1723 - 1723 - FreeportF A A1000Project Start0009-Apr-187 DayProject Start A1320Duration530537009-Apr-1814-Oct-197 Day A1530Bridge ROW Issue010509-Apr-1804-May-187 DayBridge ROW Issue A1600Project Time Charges523537009-Apr-1814-Oct-197 Day A1330Milestone 1192192607-May-1814-Nov-187 Day A1670Start Time Charges0032707-May-185Start Time Charges Wki A1340Milestone 212512516015-Nov-1820-Mar-197 Day A1350Milestone 31461461522-Mar-1915-Aug-197 Day A1020Project Finish00014-Oct-197 DayProject Finish 2412709-Apr-1810-May-185 DayStage 1 Stage 1Stage 1 931509-Apr-1827-Apr-185 DayWater WaterWater A1650Sawcut for Removals - Water Line & Detour3009-Apr-1811-Apr-18 5 Day A1550Water Line 45+80 to 48+256012-Apr-1817-Apr-18 5 Day A1380Crossing @ 44+703018-Apr-1818-Apr-18 5 Day A1370Crossing @36+164019-Apr-1825-Apr-18 5 Day A1360Crossing @ 28+26331526-Apr-1827-Apr-185 DayCrossing @ 28+26 2412712-Apr-1810-May-185 DayTCP Setup Stage 2 TCP SeTCP Setup Stage 2t A1660Sawcut for Removals - Bridge Sidewalk1012-Apr-1820-Apr-18 5 Day A1050Remove Sidewalk SB53723-Apr-1827-Apr-185 DayRemove Sidewalk SB A1060Set PCTB - Center Stripe11730-Apr-1830-Apr-185 DaySet PCTB - Center Stripe A1070Remove Bridge Median11701-May-1801-May-185 DayRemove Bridge Median A1080Set & Pin PCTB - Demo Edge22702-May-1803-May-185 DaySet & Pin PCTB - Demo Edge A1090Removals - Detours11703-May-1804-May-185 DayRemovals - Detours A1100Install Stage Detours33704-May-1809-May-185 DayInstall Stage Detours A1610Railroad Install Temp Crossing Arms00710-May-185 DayRailroad Install Temp Crossing Arms 001825-Apr-1825-Apr-185 DayStorm Drain Storm Storm DrainD A1390Storm Drain Rehab @ 17+23001825-Apr-1825-Apr-185 DayStorm Drain Rehab @ 17+23 12112120607-May-1814-Nov-18Stage 2 - NB Dividend to Bethel Stage 2Stage 2 - NB Dividend to Bethel A1620Switch Traffic to Stage 211709-May-1810-May-185 DaySwitch Traffic to Stage 2 A1630Remove Concrete Pavement & Sidewalk88710-May-1822-May-185 DayRemove Concrete Pavement & Sidewalk 225222-May-1824-May-185 DaySanitary Sewer SanitarSanitary Sewery A1490Install SS @ 26+56 w/ Temp Connection225222-May-1824-May-185 DayInstall SS @ 26+56 w/ Temp Connection 9292424-May-1803-Oct-185 DayStorm Drain Storm Storm DrainD A1500Storm Drain Impovements NB335224-May-1829-May-185 DayStorm Drain Impovements NB A1860Complete Inlet Tops after Paving88424-Sep-1803-Oct-185 DayComplete Inlet Tops after Paving 808028607-May-1828-Aug-185 DayWater Line Water LWater Linei A1400Steel Casing 23+81 to 26+161616307-May-1828-May-185 DaySteel Casing 23+81 to 26+16 A1410Install Hydrants, Crossing, etc Divident to 19+0066329-May-1806-Jun-185 DayInstall Hydrants, Crossing, etc Divident to 19+00 A1420Install 16" Main 19+00 to 23+1044307-Jun-1812-Jun-185 DayInstall 16" Main 19+00 to 23+10 A1430Install 16" Main 27+13 to 36+1688313-Jun-1822-Jun-185 DayInstall 16" Main 27+13 to 36+16 Remaining Level of EffortActual WorkCritical Remaining Work Page 1 of 7 Run Date 25-Apr-18 Actual Level of EffortRemaining WorkMilestone Data Date 25-Apr-18 Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendarAMJJASONDJFMAMJJASOND DurationDuration 01201220120012312201100122012011201220120112012201201120022011201230120112012 3102131021020 A1640Install 16" Main 36+16 to 45+8077325-Jun-1803-Jul-185 DayInstall 16" Main 36+16 to 45+80 A1440Install 16" Main in Bore33305-Jul-1809-Jul-185 DayInstall 16" Main in Bore A1450Install Hydrants, Crossings, etc 19+00 to45+8088310-Jul-1819-Jul-185 DayInstall Hydrants, Crossings, etc 19+00 to45+80 A1460Connect to Existing @ 19+0811320-Jul-1820-Jul-185 DayConnect to Existing @ 19+08 A1470Finish Connecting Services22323-Jul-1825-Jul-185 DayFinish Connecting Services A1480Grout Existing Water Line1010325-Jul-1808-Aug-185 DayGrout Existing Water Line A1690Install 20" Waterline on Southwestern111128608-Aug-1823-Aug-185 DayInstall 20" Waterline on Southwestern A1700Replace Pavement on Southwestern3328623-Aug-1828-Aug-185 DayReplace Pavement on Southwestern 55556610-May-1807-Aug-18Bridge BridgeBridge A1030Demo Existing Bridge557410-May-1817-May-185 DayDemo Existing Bridge A1040Grading Proposed Bridge117417-May-1818-May-185 DayGrading Proposed Bridge A1110Drill Shafts447418-May-1824-May-185 DayDrill Shafts A1120Bent 2 Columns227424-May-1828-May-185 DayBent 2 Columns A1180Drill Shaft Cure3310924-May-1827-May-187 DayDrill Shaft Cure A1130Bent 3 Columns227428-May-1829-May-185 DayBent 3 Columns A1190Bent 2 Column Cure3311228-May-1831-May-187 DayBent 2 Column Cure A1140Abut 1 Cap227430-May-1804-Jun-185 DayAbut 1 Cap A1200Bent 3 Column Cure3311530-May-1802-Jun-187 DayBent 3 Column Cure A1150Abut 4 Cap227404-Jun-1806-Jun-185 DayAbut 4 Cap A1210Abut 1 Cap Cure3311704-Jun-1807-Jun-187 DayAbut 1 Cap Cure A1160Bent 2 Cap227406-Jun-1811-Jun-185 DayBent 2 Cap A1220Abut 4 Cap Cure3311406-Jun-1809-Jun-187 DayAbut 4 Cap Cure A1680Install CTB @ Abutments339606-Jun-1811-Jun-185 DayInstall CTB @ Abutments A1170Bent 3 Cap227411-Jun-1813-Jun-185 DayBent 3 Cap A1230Bent 2 Cap Cure3311011-Jun-1814-Jun-187 DayBent 2 Cap Cure A1240Bent 3 Cap Cure3310813-Jun-1816-Jun-187 DayBent 3 Cap Cure A1510Install Riprap Under New Bridge337413-Jun-1818-Jun-185 DayInstall Riprap Under New Bridge A1250Set Beams117418-Jun-1819-Jun-185 DaySet Beams A1260Set Overhang11117419-Jun-1805-Jul-185 DaySet Overhang A1270Install Precast Panels & PMD447406-Jul-1811-Jul-185 DayInstall Precast Panels & PMD A1280Tie Deck Steel227412-Jul-1813-Jul-185 DayTie Deck Steel A1290Pour Deck117413-Jul-1816-Jul-185 DayPour Deck A1300Cure Deck8810516-Jul-1824-Jul-187 DayCure Deck A1310Install Ped Rail on Deck w/ Conduit10107424-Jul-1807-Aug-185 DayInstall Ped Rail on Deck w/ Conduit 111111422-May-1814-Nov-18Roadway RoadwayRoadway A1710Balance Subgrade 1+55 to 36+00993922-May-1805-Jun-185 DayBalance Subgrade 1+55 to 36+00 A1960Retaining Wall 45+51 to 48+2411118322-May-1807-Jun-185 DayRetaining Wall 45+51 to 48+24 A2390Balance Subgrade 36+00 to 67+68993905-Jun-1818-Jun-185 DayBalance Subgrade 36+00 to 67+68 A1970Retaining Wall 63+82 to 65+15668308-Jun-1815-Jun-185 DayRetaining Wall 63+82 to 65+15 A1720Fine Grade Subgrade66308-Aug-1815-Aug-185 DayFine Grade Subgrade A17304" HMAC Ty B88316-Aug-1827-Aug-185 Day4" HMAC Ty B A1740Tie Steel - Paving Pass 155328-Aug-1804-Sep-185 DayTie Steel - Paving Pass 1 A1800Paving - Pass 133304-Sep-1807-Sep-185 DayPaving - Pass 1 A1750Tie Steel - Paving Pass 255307-Sep-1814-Sep-185 DayTie Steel - Paving Pass 2 A1870Cure Paving - Pass 133907-Sep-1810-Sep-187 DayCure Paving - Pass 1 A1780Tie Steel - 2nd Half Cross Streets223511-Sep-1813-Sep-185 DayTie Steel - 2nd Half Cross Streets A1760Tie Steel - Turn Lanes (13 turn lanes)221114-Sep-1819-Sep-185 DayTie Steel - Turn Lanes (13 turn lanes) A1810Paving - Pass 233314-Sep-1819-Sep-185 DayPaving - Pass 2 Remaining Level of EffortActual WorkCritical Remaining Work Page 2 of 7 Run Date 25-Apr-18 Actual Level of EffortRemaining WorkMilestone Data Date 25-Apr-18 Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendarAMJJASONDJFMAMJJASOND DurationDuration 01201220120012312201100122012011201220120112012201201120022011201230120112012 3102131021020 A1820Pave - Turn Lanes221119-Sep-1821-Sep-185 DayPave - Turn Lanes A1880Cure Paving - Pass 233519-Sep-1822-Sep-187 DayCure Paving - Pass 2 A1890Cure - Turn Lanes331521-Sep-1824-Sep-187 DayCure - Turn Lanes A1770Tie Steel - 1st Half Cross Streets222024-Sep-1826-Sep-185 DayTie Steel - 1st Half Cross Streets A1830Pave - 1st Half Cross Streets222027-Sep-1801-Oct-185 DayPave - 1st Half Cross Streets A1900Cure - 1st Half Intersections332801-Oct-1804-Oct-187 DayCure - 1st Half Intersections A1950Backfill Pavement33404-Oct-1808-Oct-185 DayBackfill Pavement A1840Pave - 2nd Half Cross Streets222004-Oct-1808-Oct-185 DayPave - 2nd Half Cross Streets A1910Cure 2nd Half Intersections332809-Oct-1812-Oct-187 DayCure 2nd Half Intersections A1930Install Colored Stamped Concrete552409-Oct-1815-Oct-185 DayInstall Colored Stamped Concrete A1980Grade for Sidewalk1212409-Oct-1824-Oct-185 DayGrade for Sidewalk A1790Tie Steel - Driveways222012-Oct-1816-Oct-185 DayTie Steel - Driveways A1940Cure Stamped Concrete333315-Oct-1818-Oct-187 DayCure Stamped Concrete A1850Pave - Driveways332016-Oct-1819-Oct-185 DayPave - Driveways A1920Cure - Driveways332919-Oct-1822-Oct-187 DayCure - Driveways A1990Pave Sidewalk & Trail88425-Oct-1805-Nov-185 DayPave Sidewalk & Trail A2000Backfill Sidewalk & Trail22406-Nov-1807-Nov-185 DayBackfill Sidewalk & Trail A2010Grass & Landscape Outside55407-Nov-1814-Nov-185 DayGrass & Landscape Outside 126126910-May-1807-Nov-185 DayRailroad RailroadRailroad A1560Railroad Installed Concrete Panels NB1113010-May-1811-May-185 DayRailroad Installed Concrete Panels NB A1570Railroad Installed Ped Crossing Arms NB1113210-May-1811-May-185 DayRailroad Installed Ped Crossing Arms NB A1580Connect Pavement NB223824-Sep-1826-Sep-185 DayConnect Pavement NB A1590Build Sidewalk at RR Crossing NB22906-Nov-1807-Nov-185 DayBuild Sidewalk at RR Crossing NB 441124-Sep-1827-Sep-185 DayTraffic Signals Traffic Traffic SignalsS A1520Signal Drill Shafts at Southwestern NB221124-Sep-1825-Sep-185 DaySignal Drill Shafts at Southwestern NB A1540Install Conduit from NB Corners w/ Pull Boxes221125-Sep-1827-Sep-185 DayInstall Conduit from NB Corners w/ Pull Boxes 61611314-Nov-1824-Feb-19Stage 3A - SB Dividend to Fritz Stage 3Stage 3A - SB Dividend to FritzA A3840Switch Traffic to Stage 3A11414-Nov-1815-Nov-185 DaySwitch Traffic to Stage 3A A3890Remove Concrete Pavement22915-Nov-1819-Nov-185 DayRemove Concrete Pavement 994720-Nov-1804-Dec-185 DayWater WaterWater A2280Remove & Replace Existing Hydrants334720-Nov-1822-Nov-185 DayRemove & Replace Existing Hydrants A2290Complete Crossing @ 13+60224723-Nov-1826-Nov-185 DayComplete Crossing @ 13+60 A2300Complete Crossing @ 16+05224727-Nov-1828-Nov-185 DayComplete Crossing @ 16+05 A2310Complete Crossing @ 22+68224703-Dec-1804-Dec-185 DayComplete Crossing @ 22+68 36361405-Dec-1828-Jan-195 DayStorm Drain Storm Storm DrainD A2400Storm Drain Impovements SB224705-Dec-1806-Dec-185 DayStorm Drain Impovements SB A2410Complete Inlet Tops after Paving221424-Jan-1928-Jan-195 DayComplete Inlet Tops after Paving 2626420-Nov-1831-Dec-185 DaySanitary Sewer SanitarSanitary Sewery A2360Install SS 32+33 to 23+8988920-Nov-1803-Dec-185 DayInstall SS 32+33 to 23+89 A2320Drill Shafts for Aerial SS Crossing33422-Nov-1827-Nov-185 DayDrill Shafts for Aerial SS Crossing A2330Columns for Aerial SS Crossing33427-Nov-1804-Dec-185 DayColumns for Aerial SS Crossing A2340Caps for Aerial SS Crossing22404-Dec-1806-Dec-185 DayCaps for Aerial SS Crossing A2350Casing for Aerial SS Crossing33406-Dec-1811-Dec-185 DayCasing for Aerial SS Crossing A2370Install SS 23+89 to 17+3988411-Dec-1821-Dec-185 DayInstall SS 23+89 to 17+39 A2380Rehab Existing SS Manholes55421-Dec-1831-Dec-185 DayRehab Existing SS Manholes 55551915-Nov-1815-Feb-19Bridge BridgeBridge Remaining Level of EffortActual WorkCritical Remaining Work Page 3 of 7 Run Date 25-Apr-18 Actual Level of EffortRemaining WorkMilestone Data Date 25-Apr-18 Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendarAMJJASONDJFMAMJJASOND DurationDuration 01201220120012312201100122012011201220120112012201201120022011201230120112012 3102131021020 A2030Demo Existing Bridge55415-Nov-1822-Nov-185 DayDemo Existing Bridge A2040Grading Proposed Bridge112222-Nov-1823-Nov-185 DayGrading Proposed Bridge A2050Drill Shafts552223-Nov-1804-Dec-185 DayDrill Shafts A2060Bent 2 Columns222204-Dec-1805-Dec-185 DayBent 2 Columns A2200Drill Shaft Cure333404-Dec-1807-Dec-187 DayDrill Shaft Cure A2070Bent 3 Columns222206-Dec-1807-Dec-185 DayBent 3 Columns A2210Bent 2 Column Cure333906-Dec-1809-Dec-187 DayBent 2 Column Cure A2080Abut 1 Cap222207-Dec-1811-Dec-185 DayAbut 1 Cap A2220Bent 3 Column Cure334207-Dec-1810-Dec-187 DayBent 3 Column Cure A2090Abut 4 Cap222212-Dec-1814-Dec-185 DayAbut 4 Cap A2230Abut 1 Cap Cure334612-Dec-1815-Dec-187 DayAbut 1 Cap Cure A2100Bent 2 Cap222214-Dec-1818-Dec-185 DayBent 2 Cap A2240Abut 4 Cap Cure334314-Dec-1817-Dec-187 DayAbut 4 Cap Cure A2190Install CTB @ Abutments334014-Dec-1819-Dec-185 DayInstall CTB @ Abutments A2110Bent 3 Cap222218-Dec-1821-Dec-185 DayBent 3 Cap A2250Bent 2 Cap Cure333918-Dec-1821-Dec-187 DayBent 2 Cap Cure A2260Bent 3 Cap Cure333621-Dec-1824-Dec-187 DayBent 3 Cap Cure A2180Install Riprap Under New Bridge442221-Dec-1828-Dec-185 DayInstall Riprap Under New Bridge A2120Set Beams112228-Dec-1831-Dec-185 DaySet Beams A2130Set Overhang662231-Dec-1808-Jan-195 DaySet Overhang A2140Install Precast Panels & PMD552208-Jan-1915-Jan-195 DayInstall Precast Panels & PMD A2150Tie Deck Steel222215-Jan-1917-Jan-195 DayTie Deck Steel A2160Pour Deck112217-Jan-1918-Jan-195 DayPour Deck A2270Cure Deck883218-Jan-1926-Jan-197 DayCure Deck A2170Install Ped Rail on Deck w/ Conduit10102228-Jan-1911-Feb-195 DayInstall Ped Rail on Deck w/ Conduit A2020Form & Pour West Sidewalk & Median442211-Feb-1915-Feb-195 DayForm & Pour West Sidewalk & Median 5858320-Nov-1824-Feb-19Roadway RoadwayRoadway A2430Balance Subgrade662520-Nov-1828-Nov-185 DayBalance Subgrade A2440Fine Grade Subgrade22531-Dec-1802-Jan-195 DayFine Grade Subgrade A24504" HMAC Ty B33403-Jan-1908-Jan-195 Day4" HMAC Ty B A2460Tie Steel - Paving Pass 122408-Jan-1910-Jan-195 DayTie Steel - Paving Pass 1 A2520Paving - Pass 122410-Jan-1914-Jan-195 DayPaving - Pass 1 A2470Tie Steel - Paving Pass 222414-Jan-1915-Jan-195 DayTie Steel - Paving Pass 2 A2660Cure Paving - Pass 133514-Jan-1917-Jan-197 DayCure Paving - Pass 1 A2480Tie Steel - Turn Lanes22416-Jan-1918-Jan-195 DayTie Steel - Turn Lanes A2530Paving - Pass 222317-Jan-1921-Jan-195 DayPaving - Pass 2 A2540Pave - Turn Lanes22321-Jan-1923-Jan-195 DayPave - Turn Lanes A2670Cure Paving - Pass 2332021-Jan-1924-Jan-197 DayCure Paving - Pass 2 A2680Cure - Turn Lanes33423-Jan-1926-Jan-197 DayCure - Turn Lanes A2590Backfill Pavement221623-Jan-1924-Jan-195 DayBackfill Pavement A2490Tie Steel - 1st Half Cross Streets11228-Jan-1928-Jan-195 DayTie Steel - 1st Half Cross Streets A2620Grade for Sidewalk441428-Jan-1901-Feb-195 DayGrade for Sidewalk A2550Pave - 1st Half Cross Streets22229-Jan-1930-Jan-195 DayPave - 1st Half Cross Streets A2690Cure - 1st Half Intersections33331-Jan-1903-Feb-197 DayCure - 1st Half Intersections A2630Pave Sidewalk221401-Feb-1904-Feb-195 DayPave Sidewalk A2500Tie Steel - 2nd Half Cross Streets11204-Feb-1904-Feb-195 DayTie Steel - 2nd Half Cross Streets A2510Tie Steel - Driveways221105-Feb-1906-Feb-195 DayTie Steel - Driveways A2560Pave - 2nd Half Cross Streets22205-Feb-1906-Feb-195 DayPave - 2nd Half Cross Streets Remaining Level of EffortActual WorkCritical Remaining Work Page 4 of 7 Run Date 25-Apr-18 Actual Level of EffortRemaining WorkMilestone Data Date 25-Apr-18 Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendarAMJJASONDJFMAMJJASOND DurationDuration 01201220120012312201100122012011201220120112012201201120022011201230120112012 3102131021020 A2640Backfill Sidewalk111405-Feb-1905-Feb-195 DayBackfill Sidewalk A2650Grass & Landscape Outside221406-Feb-1907-Feb-195 DayGrass & Landscape Outside A2570Pave - Driveways221007-Feb-1908-Feb-195 DayPave - Driveways A2700Cure 2nd Half Intersections33307-Feb-1910-Feb-197 DayCure 2nd Half Intersections A2710Cure - Driveways331608-Feb-1911-Feb-197 DayCure - Driveways A2580Install Colored Stamped Concrete88211-Feb-1920-Feb-195 DayInstall Colored Stamped Concrete A2720Cure Stamped Concrete33321-Feb-1924-Feb-197 DayCure Stamped Concrete 22431-Dec-1803-Jan-195 DayLighting LightingLighting A2850Install Conduit Between Medians22431-Dec-1803-Jan-195 DayInstall Conduit Between Medians 454510025-Feb-1907-May-19Stage 3B - Median Dividend to Airline Stage 3Stage 3B - Median Dividend to Airline A3850Switch Traffic to Stage 3B11325-Feb-1925-Feb-195 DaySwitch Traffic to Stage 3B A3900Remove Concrete Pavement11326-Feb-1926-Feb-195 DayRemove Concrete Pavement 131310327-Feb-1922-Mar-19Roadway RoadwayRoadway A2730Balance & Fine Grade Subgrade22327-Feb-1928-Feb-195 DayBalance & Fine Grade Subgrade A27404" HMAC Ty B11328-Feb-1901-Mar-195 Day4" HMAC Ty B A2750Tie Steel - Paving Pass 122301-Mar-1905-Mar-195 DayTie Steel - Paving Pass 1 A2780Pave - Pass 111305-Mar-1906-Mar-195 DayPave - Pass 1 A2760Tie Steel - Paving Pass 222306-Mar-1907-Mar-195 DayTie Steel - Paving Pass 2 A2810Cure Pass 133306-Mar-1909-Mar-197 DayCure Pass 1 A2790Pave - Pass 211111-Mar-1911-Mar-195 DayPave - Pass 2 A2770Tie Steel - Paving Pass 322112-Mar-1913-Mar-195 DayTie Steel - Paving Pass 3 A2820Cure Pass 23316512-Mar-1915-Mar-197 DayCure Pass 2 A2800Pave - Pass 311113-Mar-1914-Mar-195 DayPave - Pass 3 A2830Cure Pass 333114-Mar-1917-Mar-197 DayCure Pass 3 A2840Colored Stamped Median Pavement2211220-Mar-1922-Mar-195 DayColored Stamped Median Pavement 55627-Feb-1911-Mar-19Lighting LightingLighting A2860Install Illumination Drill Shafts (15 ea)22627-Feb-1901-Mar-195 DayInstall Illumination Drill Shafts (15 ea) A2870Complete Conduit22801-Mar-1904-Mar-195 DayComplete Conduit A2890Cure Illumination Drill Shafts66801-Mar-1906-Mar-197 DayCure Illumination Drill Shafts A2880Set Illumination & Wiring22607-Mar-1911-Mar-195 DaySet Illumination & Wiring 383811214-Mar-1907-May-195 DayLandscaping LandscLandscapinga A2900Install Irrigation System4411214-Mar-1920-Mar-195 DayInstall Irrigation System A2910Install Landscape Borders2211222-Mar-1926-Mar-195 DayInstall Landscape Borders A2920Install Landscaping181811226-Mar-1919-Apr-195 DayInstall Landscaping A2930Install City Monument121211219-Apr-1907-May-195 DayInstall City Monument 97971118-Mar-1915-Aug-19Stage 4A - SB Fritz to Bethel Stage 4Stage 4A - SB Fritz to BethelA A3860Switch Traffic to Stage 4A11118-Mar-1918-Mar-195 DaySwitch Traffic to Stage 4A A3910Remove Concrete Pavement88119-Mar-1928-Mar-195 DayRemove Concrete Pavement 66129-Mar-1908-Apr-195 DaySanitary Sewer SanitarSanitary Sewery A2940Install SS @ Southwestern44129-Mar-1903-Apr-195 DayInstall SS @ Southwestern A2950Complete SS Rehab Work22104-Apr-1908-Apr-195 DayComplete SS Rehab Work 58582008-Apr-1927-Jun-195 DayStorm Drain Storm Storm DrainD A3080Storm Drain Impovements SB55108-Apr-1915-Apr-195 DayStorm Drain Impovements SB A3090Complete Inlet Tops after Paving332024-Jun-1927-Jun-195 DayComplete Inlet Tops after Paving 3838129-Mar-1921-May-195 DayWater Line Water LWater Linei A3110Bore Casing Under Railroad (102 LF)1010529-Mar-1911-Apr-195 DayBore Casing Under Railroad (102 LF) Remaining Level of EffortActual WorkCritical Remaining Work Page 5 of 7 Run Date 25-Apr-18 Actual Level of EffortRemaining WorkMilestone Data Date 25-Apr-18 Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendarAMJJASONDJFMAMJJASOND DurationDuration 01201220120012312201100122012011201220120112012201201120022011201230120112012 3102131021020 A3100Complete SB Water Connections 28+26 to 45+8022115-Apr-1917-Apr-195 DayComplete SB Water Connections 28+26 to 45+80 A3120Install 16" Water Main 45+80 to 67+681515117-Apr-1908-May-195 DayInstall 16" Water Main 45+80 to 67+68 A3140Connect to Existing @ 67+6811108-May-1909-May-195 DayConnect to Existing @ 67+68 A3130Complete Connections North of 45+8022109-May-1913-May-195 DayComplete Connections North of 45+80 A3150Remove/Grout Existing Water Line66114-May-1921-May-195 DayRemove/Grout Existing Water Line 89891129-Mar-1915-Aug-19Roadway RoadwayRoadway A3200Balance Subgrade10103029-Mar-1911-Apr-195 DayBalance Subgrade A3210Fine Grade Subgrade33122-May-1927-May-195 DayFine Grade Subgrade A32204" HMAC Ty B66127-May-1905-Jun-195 Day4" HMAC Ty B A3230Tie Steel - Paving Pass 133105-Jun-1910-Jun-195 DayTie Steel - Paving Pass 1 A3290Paving - Pass 133110-Jun-1913-Jun-195 DayPaving - Pass 1 A3240Tie Steel - Paving Pass 233113-Jun-1918-Jun-195 DayTie Steel - Paving Pass 2 A3430Cure Paving - Pass 133313-Jun-1916-Jun-197 DayCure Paving - Pass 1 A3250Tie Steel - Turn Lanes (6 turn lanes)22218-Jun-1920-Jun-195 DayTie Steel - Turn Lanes (6 turn lanes) A3300Paving - Pass 233118-Jun-1921-Jun-195 DayPaving - Pass 2 A3310Pave - Turn Lanes33121-Jun-1926-Jun-195 DayPave - Turn Lanes A3440Cure Paving - Pass 2332921-Jun-1924-Jun-197 DayCure Paving - Pass 2 A3450Cure - Turn Lanes33126-Jun-1929-Jun-197 DayCure - Turn Lanes A3260Tie Steel - 1st Half Cross Streets22001-Jul-1903-Jul-195 DayTie Steel - 1st Half Cross Streets A3360Backfill Pavement441101-Jul-1905-Jul-195 DayBackfill Pavement A3320Pave - 1st Half Cross Streets33003-Jul-1909-Jul-195 DayPave - 1st Half Cross Streets A3370Install Gabions @ 61+80331108-Jul-1911-Jul-195 DayInstall Gabions @ 61+80 A3460Cure - 1st Half Intersections33009-Jul-1912-Jul-197 DayCure - 1st Half Intersections A3390Grade for Sidewalk10101111-Jul-1924-Jul-195 DayGrade for Sidewalk A3270Tie Steel - 2nd Half Cross Streets22012-Jul-1916-Jul-195 DayTie Steel - 2nd Half Cross Streets A3280Tie Steel - Driveways222417-Jul-1919-Jul-195 DayTie Steel - Driveways A3330Pave - 2nd Half Cross Streets33017-Jul-1919-Jul-195 DayPave - 2nd Half Cross Streets A3340Pave - Driveways332419-Jul-1924-Jul-195 DayPave - Driveways A3470Cure 2nd Half Intersections33020-Jul-1923-Jul-197 DayCure 2nd Half Intersections A3350Install Colored Stamped Concrete1010023-Jul-1906-Aug-195 DayInstall Colored Stamped Concrete A3480Cure - Driveways333424-Jul-1927-Jul-197 DayCure - Driveways A3400Pave Sidewalk10101124-Jul-1907-Aug-195 DayPave Sidewalk A3490Cure Stamped Concrete332106-Aug-1909-Aug-197 DayCure Stamped Concrete A3410Backfill Sidewalk221107-Aug-1909-Aug-195 DayBackfill Sidewalk A3420Grass & Landscape Outside441109-Aug-1915-Aug-195 DayGrass & Landscape Outside 93931629-Mar-1908-Aug-195 DayRailroad RailroadRailroad A2970Railroad Installed Concrete Panels SB1110729-Mar-1929-Mar-195 DayRailroad Installed Concrete Panels SB A2980Railroad Installed Ped Crossing Arms SB1110729-Mar-1929-Mar-195 DayRailroad Installed Ped Crossing Arms SB A2990Connect Pavement SB114526-Jun-1927-Jun-195 DayConnect Pavement SB A3000Build Sidewalk at RR Crossing SB111607-Aug-1908-Aug-195 DayBuild Sidewalk at RR Crossing SB 11111423-Jul-1909-Aug-19Traffic Signals Traffic Traffic SignalsS A3020Signal Drill Shafts at Southwestern SB221523-Jul-1924-Jul-195 DaySignal Drill Shafts at Southwestern SB A3040Install Conduit from SB Corners w/ Pull Boxes221724-Jul-1929-Jul-195 DayInstall Conduit from SB Corners w/ Pull A3050Signal Drill Shaft Cure662124-Jul-1930-Jul-197 DaySignal Drill Shaft Cure A3010Install Signal Poles & Wire881530-Jul-1909-Aug-195 DayInstall Signal Poles & Wire 336334009-Apr-1814-Oct-19Stage 4B - Median Stage 4Stage 4B - Median Airline to Bethel A3870Switch Traffic to Stage 4B111115-Aug-1916-Aug-195 DaySwitch Traffic to Stage 4B Remaining Level of EffortActual WorkCritical Remaining Work Page 6 of 7 Run Date 25-Apr-18 Actual Level of EffortRemaining WorkMilestone Data Date 25-Apr-18 Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendarAMJJASONDJFMAMJJASOND DurationDuration 01201220120012312201100122012011201220120112012201201120022011201230120112012 3102131021020 A3920Remove Concrete Pavement221116-Aug-1920-Aug-195 DayRemove Concrete Pavement 16162016-Aug-1910-Sep-19Bridge BridgeBridge A3160Form & Pour NB Sidewalk222416-Aug-1919-Aug-195 DayForm & Pour NB Sidewalk A3170Cure NB Sidewalk333320-Aug-1923-Aug-197 DayCure NB Sidewalk A3180Form & Pour NB Traffic Rail10102323-Aug-1906-Sep-195 DayForm & Pour NB Traffic Rail A3380Illumination and Banner Poles on Bridge222306-Sep-1910-Sep-195 DayIllumination and Banner Pol 3434020-Aug-1914-Oct-19Roadway RoadwayRoadway A3630Balance & Fine Grade Subgrade221120-Aug-1921-Aug-195 DayBalance & Fine Grade Subgrade A36404" HMAC Ty B221122-Aug-1923-Aug-195 Day4" HMAC Ty B A3650Tie Steel - Paving Pass 1111123-Aug-1926-Aug-195 DayTie Steel - Paving Pass 1 A3680Pave - Pass 1111126-Aug-1927-Aug-195 DayPave - Pass 1 A3660Tie Steel - Paving Pass 2111127-Aug-1928-Aug-195 DayTie Steel - Paving Pass 2 A3720Cure Pass 1332627-Aug-1930-Aug-197 DayCure Pass 1 A3730Cure Pass 2331528-Aug-1931-Aug-197 DayCure Pass 2 A3690Pave - Pass 2111830-Aug-1902-Sep-195 DayPave - Pass 2 A3670Tie Steel - Paving Pass 3111802-Sep-1903-Sep-195 DayTie Steel - Paving Pass 3 A3700Pave - Pass 3111903-Sep-1904-Sep-195 DayPave - Pass 3 A3740Cure Pass 3332603-Sep-1906-Sep-197 DayCure Pass 3 A3500Tie Steel - Pass 4111904-Sep-1905-Sep-195 DayTie Steel - Pass 4 A3510Pave Pass 4111809-Sep-1909-Sep-195 DayPave Pass 4 A3520Cure Pass 4332410-Sep-1913-Sep-197 DayCure Pass 4 A3830Colored Stamped Cross Walk221613-Sep-1917-Sep-195 DayColored Stamped Cross W A3710Colored Stamped Median Pavement221617-Sep-1919-Sep-195 DayColored Stamped Median A3820Permanent Striping55007-Oct-1914-Oct-195 DayPermanent Stripin 1717802-Sep-1927-Sep-19Lighting LightingLighting A3750Install Illumination Drill Shafts (27 ea)881002-Sep-1911-Sep-195 DayInstall Illumination Drill Shaf A3760Complete Conduit441012-Sep-1917-Sep-195 DayComplete Conduit A3780Cure Illumination Drill Shafts661512-Sep-1917-Sep-197 DayCure Illumination Drill Sha A3770Set Illumination & Wiring881018-Sep-1927-Sep-195 DaySet Illumination & Wirin 333334009-Apr-1814-Oct-19Landscaping LandscLandscapinga A3880Duration530537009-Apr-1814-Oct-197 Day A3790Install Irrigation System1212006-Aug-1922-Aug-195 DayInstall Irrigation System A3800Install Landscape Borders88022-Aug-1903-Sep-195 DayInstall Landscape Borders A3810Install Landscaping2424003-Sep-1907-Oct-195 DayInstall Landscaping Remaining Level of EffortActual WorkCritical Remaining Work Page 7 of 7 Run Date 25-Apr-18 Actual Level of EffortRemaining WorkMilestone Data Date 25-Apr-18