Loading...
Waterside P3-CS 930915 MEMORANDUM To: Taryon Bowman, Planning and Zoning Coordinator From: Kenneth M. Griffin, P.E. , City Engineer RE: FINAL Engineering Conunents for DRC 8/26/93 & 9/2/93 Date: September 15, 1993 12. Waterside Estates Phase III preliminary plat (resubmittal) - located at the northwest corner of MacArthur Blvd. and Parkway Blvd. 2. V~ should be r~uest~ for the minimum center line radius from 425 to 150. 3. V~ce should be r~uest~ for the deletion of ~leys for lots 1-15, Bl~k G. 4. It is my opinion that it will be ve~ difficult to build on ~t 15, Bl~k G. The previous submit~ in J~u~, 1992 show~ a dr~nage msement on the no~h side of ~t 15. That dr~nage msement coupl~ with the 30 foot ~wer msement on ~e muth side basic~ly renders the lot n~ unbuildable. Some consideration should be given to eliminating the lot. 7. Water, sewer ~d dr~nage plus should be provide. it`-12 4 ,? -- -, . - ---' • x4,1 , (,), \(1/ d N : - , )N<\\ \ ' '\-. \ a \S 'cl — / / ti/ 0 _ i (c) V- -:_Vi f / * / \ ( * \*? 1 / / q .. \Z1c01-'j. —-C)=— 0 /, • 0 q ‘ y/ - .i _. . c- / ‘9 6 .-., '-,, - / _ • - ' N, ---1 v'h /‘04 \ tr / i0 \ x . t, '' / 1\- \ 04j . / k 4 \' ;$0 (S) % / 1)0 4 "0: 2/It h � �1-�h�� / 450 ti / / / , • .% / . 1 1"- 401 -- -----