ST1501A-CS180430
Priscilla Martinez
From:Marcus Marion
Sent:Monday, April 30, 2018 11:50 AM
To:Priscilla Martinez
Subject:Freeport Parkway - Proposed Traffic Control Changes
This is a correspondence for Freeport deck repair
From: Darryl Zbranek
Sent: Monday, April 30, 2018 7:44 AM
To: Eric Giebelhaus <Eric.Giebelhaus@strlco.com>; Jimmy Reed <Jimmy.Reed@strlco.com>
Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>; Kent Collins <KCollins@coppelltx.gov>; George
Marshall <GMarshall@coppelltx.gov>; Marcus Marion <MMarion@coppelltx.gov>
Subject: FW: Freeport Parkway - Proposed Traffic Control Changes
Eric, see comments from Geoff Scheid with Aguirre & Fields. If you have any questions please let me know.
Thanks,
Darryl Zbranek
Chief Construction Inspector
City of Coppell, TX
(469)507-9095 (cell)
www.coppelltx.gov
From: Geoff Scheid, P.E. \[mailto:geoff.scheid@aguirre-fields.com\]
Sent: Monday, April 30, 2018 7:25 AM
To: Darryl Zbranek <dzbranek@coppelltx.gov>; Claudio Segovia <claudio@jvolkconsulting.com>
Cc: Kent Collins <KCollins@coppelltx.gov>; George Marshall <GMarshall@coppelltx.gov>; Marcus Marion
<MMarion@coppelltx.gov>; FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>
Subject: RE: Freeport Parkway - Proposed Traffic Control Changes
Darryl,
Per the TXDOT Concrete Repair Manual, for a full-depth deck repair, the perimeter of the repair will need to be saw-cut
½” to ¾” deep without cutting the existing reinforcing steel. The intent is to keep the existing steel intact while removing
the concrete in the damaged area.
Please refer Texas Sterling to Chapter 3, Section 4 of the repair manual for further information.
Thanks,
Geoff Scheid, P.E.
A GUIRRE & F IELDS LP
(682) 325-5446 (Direct)
(817) 509-8300 (Main)
1
From: Darryl Zbranek <dzbranek@coppelltx.gov>
Sent: Monday, April 30, 2018 6:41 AM
To: Claudio Segovia <claudio@jvolkconsulting.com>; Geoff Scheid, P.E. <geoff.scheid@aguirre-fields.com>
Cc: Kent Collins <KCollins@coppelltx.gov>; George Marshall <GMarshall@coppelltx.gov>; Marcus Marion
<MMarion@coppelltx.gov>; FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>
Subject: FW: Freeport Parkway - Proposed Traffic Control Changes
Claudio and Geoff, please see the question below and respond.
Thank you,
Darryl Zbranek
Chief Construction Inspector
City of Coppell, TX
(469)507-9095 (cell)
www.coppelltx.gov
From: Eric Giebelhaus \[mailto:Eric.Giebelhaus@strlco.com\]
Sent: Friday, April 27, 2018 3:37 PM
To: Darryl Zbranek <dzbranek@coppelltx.gov>; Jimmy Reed <Jimmy.Reed@strlco.com>
Cc: Marcus Marion <MMarion@coppelltx.gov>; FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>
Subject: RE: Freeport Parkway - Proposed Traffic Control Changes
Darryl,
The proposed full depth repair drawing shows sawcutting the full depth of deck down to the existing bridge beams. I
believe this is not a correct procedure for a full depth repair.
We want to keep all existing rebar intact for the repair. The existing steel has not been damaged and is embedded
across the full width of the deck. Keeping this will provide a better product than trying to drill into the deck on both
sides to epoxy bars into the existing deck.
Please let me know if we can proceed with this repair, keeping the existing rebar in place.
Thanks,
Eric Giebelhaus
Project Manager– North Texas Division
Texas Sterling Construction Co.
| 1441 Airport Freeway Suite 350, Euless, Texas 76040 |
| 469.346.8085 Cell |
2
From: Darryl Zbranek <dzbranek@coppelltx.gov>
Sent: Friday, April 27, 2018 3:31 PM
To: Eric Giebelhaus <Eric.Giebelhaus@strlco.com>; Jimmy Reed <Jimmy.Reed@strlco.com>
Cc: Marcus Marion <MMarion@coppelltx.gov>; FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>
Subject: FW: Freeport Parkway - Proposed Traffic Control Changes
Eric,
Please see the attached bridge deck repair details from Aguirrre & Fields. If you have any questions please call.
Thanks,
Darryl Zbranek
Chief Construction Inspector
City of Coppell, TX
(469)507-9095 (cell)
www.coppelltx.gov
From: Geoff Scheid, P.E. \[mailto:geoff.scheid@aguirre-fields.com\]
Sent: Friday, April 27, 2018 12:48 PM
To: Jay Volk <jay@jvolkconsulting.com>; Kent Collins <KCollins@coppelltx.gov>
Cc: Claudio Segovia <claudio@jvolkconsulting.com>; FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>;
Eugene Lee, P.E. <Eugene.Lee@aguirre-fields.com>
Subject: RE: Freeport Parkway - Proposed Traffic Control Changes
Please see attached for our deck repair details.
Due to the extent of the damage visible in the photos provided, we determined a full depth deck repair to be the most
appropriate method. Our details show the general repair configuration and refer to the TXDOT Concrete Repair Manual
for specific information on repair methods and products to be used.
We have allowed in the general notes for the contractor to provide alternative repair plans signed by an engineer at
their option.
Please don’t hesitate to give us a call with any questions or concerns.
Thanks,
Geoff Scheid, P.E.
A GUIRRE & F IELDS LP
5320 North Tarrant Parkway, Suite 260
Fort Worth, TX 76244
(682) 325-5446 (Direct)
(817) 509-8300 (Main)
3
From: Eugene Lee, P.E.
Sent: Thursday, April 26, 2018 12:15 PM
To: Jay Volk <jay@jvolkconsulting.com>; Kent Collins <KCollins@coppelltx.gov>; Geoff Scheid, P.E.
<geoff.scheid@aguirre-fields.com>
Cc: Claudio Segovia <claudio@jvolkconsulting.com>; FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>
Subject: RE: Freeport Parkway - Proposed Traffic Control Changes
Thank you all for the quick response. We have started on the sheet production and will get this to you all as soon as
possible.
Thanks,
Eugene
Eugene Lee, P.E.
(817) 509-8302(Direct)
From: Jay Volk \[mailto:jay@jvolkconsulting.com\]
Sent: Thursday, April 26, 2018 12:11 PM
To: Kent Collins <KCollins@coppelltx.gov>; Geoff Scheid, P.E. <geoff.scheid@aguirre-fields.com>; Eugene Lee, P.E.
<Eugene.Lee@aguirre-fields.com>
Cc: Claudio Segovia <claudio@jvolkconsulting.com>; FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>
Subject: RE: Freeport Parkway - Proposed Traffic Control Changes
Eugene, please proceed with plan sheets.
Thx.
Jay Volk | President
830 Central Parkway East | Suite 300 | Plano | TX 75074
972-201-3101 (office)
972-201-3101 (direct)
972-965-2864 (mobile)
972-201-3099 (fax)
www.jvolkconsulting.com
From: Kent Collins <KCollins@coppelltx.gov>
Sent: Thursday, April 26, 2018 12:02 PM
To: Jay Volk <jay@jvolkconsulting.com>
Cc: Claudio Segovia <claudio@jvolkconsulting.com>; FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>
Subject: Re: Freeport Parkway - Proposed Traffic Control Changes
4
Jay, thank you for the quick response. Please have them proceed with the plan sheets.
Thanks,
Kent
On Apr 26, 2018, at 11:06 AM, Jay Volk <jay@jvolkconsulting.com> wrote:
Kent, see below.
Jay Volk | President
<image001.png>
830 Central Parkway East | Suite 300 | Plano | TX 75074
972-201-3101 (office)
972-201-3101 (direct)
972-965-2864 (mobile)
972-201-3099 (fax)
www.jvolkconsulting.com
From: Eugene Lee, P.E. <Eugene.Lee@aguirre-fields.com>
Sent: Thursday, April 26, 2018 10:57 AM
To: Jay Volk <jay@jvolkconsulting.com>
Cc: Claudio Segovia <claudio@jvolkconsulting.com>; Geoff Scheid, P.E. <geoff.scheid@aguirre-fields.com>
Subject: RE: Freeport Parkway - Proposed Traffic Control Changes
Jay,
Traffic needs to remain closed for the exterior lane as the deck is not fully bearing on the girders. Since map pattern
cracking on the bottom of deck is visible, full deck repair for the damaged bays is necessary in lieu of partial-depth.
Referring to the TxDOT Concrete Repair Manual, (http://onlinemanuals.txdot.gov/txdotmanuals/crm/crm.pdf), the
damage from the photos is classified as a major spall. We recommend using a Class S mixture based similar properties to
the existing bridge deck, Class S mixture being readily available and performance since this portion of existing deck will
be utilized for the first phase of construction. This will require about 4 days until the concrete has sufficient strength to
return to service. If the city gives us approval by 4pm today, we can assemble a repair plan sheet and have that to you all
by COB tomorrow.
Once the deck repair is finalized, we will give further recommendations on how to proceed with the remainder of
sidewalk/median removal.
Thanks,
Eugene
Eugene Lee, P.E.
A GUIRRE & F IELDS LP
5320 North Tarrant Parkway, Suite 260
Fort Worth, TX 76244
(817) 509-8302 (Direct)
(469) 682-1012 (Mobile)
(817) 509-8300 (Main)
<Facebook_f78d931e-c43e-44ad-ac22-31698e351de5.png> <LinkedIn_9b0d8607-f1ad-4476-9701-
436da2ba6896.png> <Twitter_07954f1f-8dc1-4099-a2f9-e010ba3767d8.png>
<Best-Firm-2017_85ed9951-1e6a-4e6d-8673-b0dc09beddd8.gif>
5
From: Geoff Scheid, P.E.
Sent: Thursday, April 26, 2018 10:15 AM
To: Eugene Lee, P.E. <Eugene.Lee@aguirre-fields.com>
Subject: FW: Freeport Parkway - Proposed Traffic Control Changes
Geoff Scheid, P.E.
(682) 325-5446(Direct)
From: Jay Volk <jay@jvolkconsulting.com>
Sent: Thursday, April 26, 2018 10:11 AM
To: Geoff Scheid, P.E. <geoff.scheid@aguirre-fields.com>
Cc: Claudio Segovia <claudio@jvolkconsulting.com>
Subject: FW: Freeport Parkway - Proposed Traffic Control Changes
Geoff, see below. Can we get a response on the first item today?
Jay Volk | President
<image001.png>
830 Central Parkway East | Suite 300 | Plano | TX 75074
972-201-3101 (office)
972-201-3101 (direct)
972-965-2864 (mobile)
972-201-3099 (fax)
www.jvolkconsulting.com
From: Kent Collins <KCollins@coppelltx.gov>
Sent: Wednesday, April 25, 2018 8:16 AM
To: Jay Volk <jay@jvolkconsulting.com>
Cc: Claudio Segovia <claudio@jvolkconsulting.com>
Subject: RE: Freeport Parkway - Proposed Traffic Control Changes
Jay, I think the contractor understands and appreciates that their method caused the damage and they seem prepared
to deal with it. They need direction from our designers and the City. My request for your team is to:
1. As quickly as possible, assess whether traffic has to stay off of the outside lane, or if there is an option to plate
over the damaged stretch (or some other short-term solution)
2. Within a week (as A&F suggests) provide an analysis of options for the detour of both north and southbound
traffic to the western lanes. Given the difficulty in removing the sidewalk, they have suggested leveling up to
curbline with asphalt, but there may be a better option
I have been on-site and the area of damage if limited, and appears to be isolated to underneath the sidewalk. Given the
limited scope of damage, it seems that some fairly quick-to-implement options may be available. If we need to meet on-
site, let me know.
Thanks,
Kent
From: Jay Volk \[mailto:jay@jvolkconsulting.com\]
Sent: Tuesday, April 24, 2018 10:50 PM
6
To: Kent Collins <KCollins@coppelltx.gov>
Cc: Claudio Segovia <claudio@jvolkconsulting.com>
Subject: Re: Freeport Parkway - Proposed Traffic Control Changes
On Apr 24, 2018, at 7:31 PM, Kent Collins <KCollins@coppelltx.gov> wrote:
Jay/Claudio, we need a recommendation regarding handling traffic tomorrow, not next week. The
detour option evaluation can wait, but do we really need the one lane taken down or can we do
something to remediate quickly?
Kent M. Collins, P.E.
Director of Public Works
972.304.7019
On Apr 24, 2018, at 4:56 PM, Claudio Segovia <claudio@jvolkconsulting.com> wrote:
Kent and Darryl,
We ran this by Aguirre & Fields, please see their response below:
Based on the photos attached, it’s clear that the bridge deck has been significantly damaged and the
flexural capacity significantly reduced. Our first recommendation is to barricade the lane nearest to the
damage immediately. To evaluate if their proposal for the HMAC level-up is feasible, we’ll need time to
perform an analysis of the existing bridge deck and girders. We’ll get back to you early next week with
our recommendations.
I’ve cc’d Geoff and Eugene in case there are any other questions/comments on this.
Thanks.
Claudio Segovia | Engineer
J. VOLK consulting
830 Central Parkway East | Suite 300 | Plano | TX 75074
972-201-3100 (office)
972-201-3102 (direct)
972-322-7026 (mobile)
972-201-3099 (fax)
www.jvolkconsulting.com
Service with Integrity, Initiative and Innovation
From: Eric Giebelhaus <Eric.Giebelhaus@strlco.com>
Sent: Tuesday, April 24, 2018 3:08 PM
To: Kent Collins <KCollins@coppelltx.gov>
Cc: Marcus Marion <MMarion@coppelltx.gov>; Darryl Zbranek <dzbranek@coppelltx.gov>; Joe Soto
<Joe.Soto@strlco.com>; Jimmy Reed <Jimmy.Reed@strlco.com>; Jay Volk <jay@jvolkconsulting.com>;
Claudio Segovia <claudio@jvolkconsulting.com>
Subject: Freeport Parkway - Proposed Traffic Control Changes
Kent,
7
Please review the attached proposal. I would like to meet to discuss this once you have had a chance to
consider it.
Thanks,
Eric Giebelhaus
Project Manager– North Texas Division
Texas Sterling Construction Co.
| 1441 Airport Freeway Suite 350, Euless, Texas 76040 |
| 469.346.8085 Cell |
<image001.jpg>