Loading...
ST1501A-CS180509 Request F or I nformation From: To: Texas Sterling Construction Co City of Coppell 1441 Airport Freeway, Suite 350 265 E. Parkway Blvd. Coppell, TX 75019 Euless, Texas 76040 Freeport Parkway – Dividend Dr. to West Bethel Rd. Project No: ST15-01A Bid No: Q-1218-01 To: Kent Collins, PE (kcollins@coppelltx.gov) Date: 05-9-2018 From:Eric Giebelhaus(Eric.Giebelhaus@strlco.com)RFI#: 13 Refer to Plan Sheets: C-104 Specifications: Subject: HMAC Overlay on Existing Bridge Deck So far we have been unable to remove the sidewalk from the bridge deck in a way that leaves a smooth surface. In the locations we have chipped the sidewalk all the way down to the level of the deck it has left gouges in the deck. To provide a smoother surface and reduce the risk of damaging the bridge deck we would like to propose placing an asphalt overlay on the right southbound lane. This will allow us to level up the lane and fill any voids where the sidewalk has not been fully removed down to the deck. The left southbound lane (Stage 2 temporary northbound lane) as bare concrete. Currently there is two 11’ lanes plus the 6’ sidewalk. The traffic control plan calls for minimum 12’ lanes. These lane widths widen at the north end of the bridge to allow more turning radius. With 2.5’ for the traffic barrier this will leave 12.75’ for each lane. This will be a load of less than 50 tons of asphalt added to the bridge.