Loading...
Waterside P3-CS 931022 3. Drainage plans and contour information should be provided. The location of the floodplain on the rear of Lots 13-18, Block A cannot be verified without that information. 5. Please provide the volume and page number of the existing 15' off-site storm sewer easement that is generally located south of and between lots 7 & 8, Block A. 6. A Floodplain Development Permit will be required. 4. Waterside Estates Addition Phase HI - located at the northwest corner of Parkway Blvd. and MacArthur Blvd. 1. Contact should be made with the Coppell Municiple Utility District concerning the existing 27" sanitary sewer line along the south side of this proposed subdivision. That sewer line has recently been televised and some problems were noted in the line. It is recommended that contact be made to insure that 1) you can tie into the line with no problem, and 2) that no section of the line adjacent to the subdivision needs to be replaced with the development of this subdivision.