Loading...
Waterside P3-CS 940721 COPPELL PUBLIC WORKS MEMORANDUM DATE: July 21, 1994 TO: Engineering FROM: Public Works RE: PLAT/PLAN REVIEW - JULY 21, 1994 Waterside Estates No. 3 - 2nd Review - 850 degree minimum curve on sanitary sewer lines - The connection of the 8" sewer to the 27" sewer on Pardway Blvd. is against the flow, why? This 27" runs between 1/3 and 2/3 in flow. - Need any landscape/irrigation plans associated with this project for staff review. cc: Planning I'LATI'I.N2.PW