Waterside P3-CS 940721 COPPELL PUBLIC WORKS
MEMORANDUM
DATE: July 21, 1994
TO: Engineering
FROM: Public Works
RE: PLAT/PLAN REVIEW - JULY 21, 1994
Waterside Estates No. 3 - 2nd Review
- 850 degree minimum curve on sanitary sewer lines
- The connection of the 8" sewer to the 27" sewer on Pardway
Blvd. is against the flow, why? This 27" runs between 1/3 and
2/3 in flow.
- Need any landscape/irrigation plans associated with this
project for staff review.
cc: Planning
I'LATI'I.N2.PW