Loading...
Waterside P3-CS 941013October 13, 1994 Mr. Bill Anderson Dowdey, Anderson and Associates, Inc. 16250 Dallas Parkway Suite 100 Dallas, TX 75248 RE: Waterside Estates III Development Fee Assessment (Revised) Dear Mr. Anderson: Enclosed is a copy of the City of Coppell Developmem Fee Assessmem list, along with a copy of the Development Fee Calculations for Waterside Estates III. Please provide a check made payable to the City of Coppell in the amount of $45,325.00 and forward it to Mr. Alan Johnson, Finance Director, along with a copy of the Fee Assessmem List. Please provide our office a copy of the Engineer's Estimate or contract for this project so the construction inspection fee can be verified. By providing a copy of your paid receipt to our office, it will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer cc: Rey Gonzales, Street Superintendent Howard Pafford, Utilities Superintendent Alan Johnson, Finance Director Greg Jones, Building Official CITY OF COPPELL DEVELOPMENT FEES (Revised)~ Date: October 13, 1994 Project: Waterside Estates III TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $ 24,700.00 $ 24,700.00 (100% due prior to Council Approval) Water Tap Inspection Fee $ 3,400.00 -0- (100% due at Issuance of Building Permit) Wastewater Impact Fee $ 14,850.00 $ 14,850.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee $ 3,300.00 -0- (100% due at Issuance of Building Permit) Utility Final Inspection Fee $ 1,650.00 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) $ 734.25 -0- (100% due at Issuance of Building Permit) Water Meter Deposit (Non-Residential) $ 35.00 (100% due at Issuance of Water Meters) Water Meter Deposit (Residential) $ 990.00 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Irrigation & Fire) $129.10 -0- (100% due at Issuance of Water Meters) Irrigation Meter Deposit -0- -0- (100% due at Issuance of Water Meters) Street Sign Fee $ 671.79 -0- (100% due prior to Acceptance of Project) Street Light Fee * information not -0- (100% due prior to Acceptance of Project) available Park Fee $11,550.00 $ 5,775.00 (50% due prior to Issuance of Building Permit) (50% =$5,775.00) (50 % due prior to Council Approval) (50 % = $5,775.00) Construction Inspection Fee need submittal of -0- (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $ 62,010.14 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 45,325.00 · This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPPELL PUBLIC WORKS MEMORANDUM DATE: June 3, 1994 TO: Engineering Departm~ ~ FROM: Public Works Staff ~%~ RE: Development Fees for Waterside Estates III The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 33 - 5/8" x 3/4" Domestic Meter/s = 33 ESU's 1 - 1 1/2" Irrigation Meter/s = 5 ESU's - Fireline Meter/s = ESU's Total 38 ESU's @ $650.00 ea = $ 24,700.00 100% due prior to Council approval of the final plat. Wastewater Impact (City) 33 - 5/8" x 3/4" Domestic Meter/s = 33 ESU's Total 33 ESU's @ $450.00 ea = $ 14,850.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 34 Connections @ $100.00 each = $ 3,400.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee 33 Connections @ $100.00 each = $3,300.00 100% due prior to issuance of building permit. (Residential only) Development Fees Page 2 Utility Final Inspection Fee (All Development) 33 lots ~ $50.00/lot = $ 1,650.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 33 - 5/8" x 3/4" Domestic Meters @ 22.25 ea = $ 734.25 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) 1 - 1 1/2" Irrigation Meter/s @ $ 129.10 ea = $ 129.10 - Fireline Meter/s @ $ ea = $ 100% due prior to issuance of water meter/s. Water Meter Deposit (Residential) 33 Meters @ $30.00 ea = $ 990.00 100% due prior to issuance of building permit. Water Meter Deposit (Multi-Family or Non-Residential) 1 Meters @ $35.00 ea = $ 35.00 100% due prior to issuance of water meters. Irrigation Meter Deposit Meters @ $35.00 ea = $ 100% due prior to issuance of water meters. Development Fees Page 3 Park Fee For those developments having preliminary plat approval prior to June 23, 1992 the following assessment is determined: Residential Lots at $150.00 each = $ Units (Multi family) at $75.00 each = $ 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined: %~ Residential Lots at $350.00 each = $ ~ ~50 Units (Multi-Family) at $350.00 each = $ 50% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after October 26, 1993 the following assessment is determined: -33 --'ResidenEiai ~L~ aL $1,285.00 each= ~ ~/~~ Units (Multi-Family) at $1,285.00 each = $ ~ 41 ~ 100% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Development Fees Page 4 Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. cc: Steven G. Goram, Director of Public Works G. Greg Jones, Chief Building Official Development Fees Page 5 STREET SIGN ASSESSMENT for Waterside Estates III The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY EXTENDED PRICE No Parking $53.10 Speed Limit $63.54 6 381.24 Yield $58.56 Stop $65.12 Street Name $11.60 Stop & Street Combo $96.85 3 290.55 OTHER TOTAL $ 671.79 * Cost breakdowns may be obtained from Public Works by written request. DEVFEES.HLP Revised 1/14/94