2018 2nd QuarterT E- CITY- () r
CoppTLL Date: -
z C-1 - 4---
J!�7
8i -Weekly Report
Ct^rmvLmtgbr Cnnctn&tsiAn Site 1�irrfection Report
255 PARKWAY * P.O.BOX 9470 * COPPELL TX 75019 * TEL 9721462 0022 * FAX 972130-1 3673
Implemented
IMMMIS
Corrective Action Needed and Notes
BMP/ Activity
Are all slopes an
disturbed areas not
1
actively being worked
ro erl stabilized? Yes
fNo •-- Yes
No
Are natural resource
areas (e.g., streams,
2
wetlands, mature trees,
etc) protected with
barriers or similar BMPs?
-_
Yes No JN
Yes No r
Are perimeter controls
and sediment barriers
g
adequately installed
(keyed into substrate and
maintained)?
Yes No ( _;
Yes :--- No
Are discharge points and
q
receiving waters free of
any sediment deposits?
__
=No ! _q
Yes t_v No 4.. 3
Yes
Are storm drain inlets
, v
5
property protected?
yes ED No
Yes i:.:j No
Is the construction exit
preventing sediment
6
being tracked into the
street?
Yes
Yes
Is trash / litter from work
/`[A(�
7
areas colected and placed
/ /
/ V�
In covered dumpsters?—:,
Y@9r 1 _ _-- No
___
Yes i=----J--J NO
Are washout facilities
(e.g., paint, stucco,
X/
g
concrete) available
f x
clearly marked, and
maintained?
Yes %as. No
N
Yes E--% °--
Are vehicle and
equipment fueling,
/(
cleaning, and
g
maintenance areas free
�� J
of spills, leaks, or any
other ~edous-
materials?
Yes No
Are materials that are
l 5n
10
potential stormwater
contaminates stored
Inside or under cover?r
Yes i -.. � No
— -''
Yes No k--�
Are non stormwater
11
discharges (e.g., wash
water, dewatering)
property controlled?
--L / "- -
Yes - - No --
.
Yes
Describe any indent of not d
CEIGN CATIM STATBAW
I ceFft ander penalty of law that this document and air a rents avers PrePared under any direction or supervision in
accordance with a system designed to assure that qualified personnei PmPedll gathered and evaluated the information
submitted, Based on my inquiry of the person orpersons who manage thesyslem, or those persons directly responsible for
gathering the information, tate Wermation svbmitted1s, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are sknMcMt penalties fersiriimitftfalse infonrladM induding the possibility of fine and imprisonment
for knowing violations.
Print Name and Title: A JAMES I40WE - DAM INSPECTOR
Signature:
Date: (� r /
xl*
Describe any indent of not d
CEIGN CATIM STATBAW
I ceFft ander penalty of law that this document and air a rents avers PrePared under any direction or supervision in
accordance with a system designed to assure that qualified personnei PmPedll gathered and evaluated the information
submitted, Based on my inquiry of the person orpersons who manage thesyslem, or those persons directly responsible for
gathering the information, tate Wermation svbmitted1s, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are sknMcMt penalties fersiriimitftfalse infonrladM induding the possibility of fine and imprisonment
for knowing violations.
Print Name and Title: A JAMES I40WE - DAM INSPECTOR
Signature:
Date: (� r /
T H F_ - C I T Y- O F
COFFEr,,** LL
M-WeeWy Report ``"�`g ;�s" ' Date:
Rtrirmwater CnnvtniWi6n Site I on Report
255 PARAWAY fir P.O-BOX 9478 it COPPELL TX 75019 * TEL 9721462 0022 * FAX 972!30.1 3673
General tnforawthm
Project Name
pAoditiwtiweTo Northlake Dares
NPDESTradcingNo.
TiIti1 OOZWO
location Datmi7
Date ofirMecdon
'/
�:i(
Start/EadTmne `r7e�- i:Xf
Inspector's mam m-
laanes ltomre
inspectoes-nde:
Dam Inspector
inspectors Contact information:
972-607-5466
Desarl'im pmsent Phase of
consuuction
prrgoirrg NlawrterrNrte
Type of Imspecklmit
Regular
Prestwm event
._
D -wv +v rent F Post -storm event
We_ athet tnfon !don
Hasthere been a storm eaerlt*M thelilainspection: Yes
ifyes, proved-.- S; an Start Dace & lucre
Stnrrrr Dvtadar c sF Appr�e amoto t tit
Weatherat time of this ons
Clear Cloudy Hain
Snourir� Web Winds Other "
EYes
Slee[ Fog
Temperature
have mw dir dmaes oamrmd since the I:at inspection? - No
if yes, desmbe:
Are tflerea111 at Metirneofd lr?
amp
iws; Irk?
...
Cornxtive Action Needed and Notes
1 SIacPiie
Yes.,No
_
a-, -
2
Yes -:
-. _Yes
= ~ No
3
Yes.SND
V _
4
Y�
.iY�
�,.No
S
Yee
6
Yes j __ -_ .�No
_-_� Yes
�__•__�� j.- _ i
7
Yes ;mo
-
4 , Yes
$
------ .'_ 1110
_
f . Yes
-- 11M LJ
9
Yes_JNo - - Yes
. SMO €_
1D
Yes" �.. � 3f
- Yes
,No
12
Yes �.,,_No,.
•� Yes.
.No•- �s
12
Yes . No
Yes
-
3.3
Yes
14
_7T_- '.No
Yes
._ 9 Yes
No
15
Yes
Yes
__ I o
16
Yes..: ENo
S �, Yes
U. No
17
Yes _ Elco
~_, Yes
No•, ,t
18
Yes ,No
-- Yes
No
19
Yes _ � �No
Yes
O No
20
Yes __?No
_ Yes
No
255 PARAWAY fir P.O-BOX 9478 it COPPELL TX 75019 * TEL 9721462 0022 * FAX 972!30.1 3673
Implemented
marrrtenarrcc
Corrective Action Needed and Notes
BMP/ Activity
Required?
Are all slopes and
disturbed areas not
1
actively being worked
_ :
properly stabilized?
__
Yes _-- No _ _ }
Yes '� _ —1 N0
Are natural resource
areas (e.g., streams,
Z
wetlands, mature trees,
etc) protected with
barriers or similarBMPs?
Yes_ =H
Yes ,~- Qq No r
Are perimeter controls
and sediment barriers
3
adequately installed
(keyed into substrate and
_
r__
maintained)?
yes Ll�
Yes L_ _-- ; No .- -
Are discharge points and
q
receiving waters free of
any sediment deposits?
No J
Yes `^-_
Yes _s1
Are storm drain inlets
M
14
S
properly protected?
�
YesL _ No ' _
Yes �< No
Is the construction exit
preventing sediment
ii
being tracked into the
streets
Yes mo (_
Yes,
Is trash / litter from work
/
�)
7
areas colected and placed
In covered dumpstersT
Yes No ---
Yes t __.. � No
Are washout facilities
(e.g., paint, stucco,
/� ✓1
f'
g
concrete) available
clearly marked, and—
maintained?
Yes
Yes No
Arevehide and
equipment fueling,
leaning, and
�f
g
maintenance areas free
Al/4
l
of spills, leaks, or any
odwdetetedous
materials?
Yes E. �4 No �i_—.
Yes ° No���111
Are materials that are
potential stormwater
(Vn
10
contaminates contaminates stored
inside or under cover?
YeS -�
; Yes _- No�,
Are non stormwater
discharges (eg., wash
11
water, dewatering)
property controlled?
Yes
Yes No
11
i 12MUM
L7)-
d ab=?
CEIMRC471MSrAM%fiW
sub-IthmL Based on
m designed m assure tba""U'6'd P"O"nO PnIPWF*631thered and evaluated the
my inquiry of*,p,,,, orperjumvtm Maas& Meswum, or
„s di^euh� resvoaas�te for
ga"wIrMtheW"Mation, the Infonna"m sulmn*W7.,
to the best Of My knWaledge and baW, bme, amwateand complete. I
""'"WeamsW
fur IO"wW1119violations
Print Name and Title: JA How - DAM INSPECTOR
Signature:
S,
T 14 E • C I T Y - a F
COFFTE"'LL
c .k___'Ma
Bi Weekly Report uo,a
o Date:
Ct..rnm.r�tar Co%. wt .:mAn S:tf. Report
25S PAn KWAY * P.O.BOX 9470 * COPPCLL TX 75019 * TEL 972/462 0022 FAX 9721304 3673
General information
Project Name
Modification To Northlake Dams
NPDES Tracking No.
Date of Inspection
TXM002100
- 1 ,"
location
Start/End Time
' a-, e,44
inspector's Name:
James Howe
inspector'sTitle:
Dam Inspector
-
inspector's Contact Information:
972 607-5466
Inspector's (qualifications:
Describe present phase of
construction
ongoing Maintenance
Type of Inspection
-1Pre3torm
event
-
ng Duristorm event
Pmt storm event
Weather hd 6mution
Has there been a storm event since the last inspection:
If yes, provide: Storm Start Date & Time
Storm Dwation (hM)
Yes
Approbemate
No
arnount of PrecifpMBOron ik )
Weatherattimeof inspection?
Clear Cloudy RainE
Snowing High Winds Other "
� I
Sleet
Temperature
Fog
C:70
Have any discharges occurred since the last inspection?
if yes, describe
Yes -
No
Aretinereatrydisdnargesaithetimeofiork?
.. y�
No
-
..
BMP
SNEP Irstall�?"
Corrective Action Needed and Notes
1 5lagpiie
z
_
f",-Pres, :J. _No t��c�s
Yes :�N-t
Yes__:_ Yes _ E_ . a
�Pe
/v , -
3
Yes s . __,..,#Yes
5No__
S
4
yes _ �No -.
Yes E._�NO.._:,.s
5
es ' -x Yes
6
Yes,z-: _No __ __i
Yes
7
_ ftiio : .. Yes
g
_
o __ _ _
Yes No �
k -
Yes
g
YesNO
10
yes �.,No .
11
Yes �..->-INo [.,
Yes.-
12
13
Yes
14
Yrs No C f_..,
15
YZ__
No �7
. Yes
No
16
Yes �___ENo L,..
Yes _.
)NO _
17
Yes _ No _
Yes
No
18
Yes 7JETU-77'Yes
r
No
19
Yes No
Yes_.
No
20
Ves 1No -
Yes
- No r{_-„•
25S PAn KWAY * P.O.BOX 9470 * COPPCLL TX 75019 * TEL 972/462 0022 FAX 9721304 3673
OMP/Activity
Area slopes an
disturbed areas not
actively being worked
properly stabilized?
Are natural resource
areas (e g., streams,
Z wedands, mature trees,
etc) protected with
barriers or similar BMPs?
Are perimeter con!.h
and sediment barriers
3 adequately installed
(keyed into substrate and
maintained)?
Are discharge points and
4 receiving waters free of
any sediment deposits??
implemented
Masme"UHM
No
-1Yes No
A
jNO Yes No
Y"
Yes
No il
es IV
Are storm drain inlets
5 property protected?
e.
Yes
Yes No
is the construction exit
preventing sediment
6 being tracked into the
no
street?
Yes
is trash / litter from work
7 areas colected and placed
/V.
in covered dumpsters?
r
Yes
L No L__35 Yes L—J No
Yek
Yell,--
__11mo
Are washout facilities
(e.g., paint, stucco,
concrete) available
dearly marked, and
Yes No
NO Yes
maintained?
Yes
0
Are vehicle and
equipment fuelin&
cleaning, and
9 maintenance areas free
of spills, leaks, or any
other deleterious
materials?
Yes
No Yes 4o
Are materials that are
potential stormwater
7Yes._�
10 contaminates stored
r
inside or under cover?
Yin
L_ __j No
Are non-stormwater
k�
discharges (e.g-, wash
I
water,
ater, dewatering)
:
properly controlled?
pro;
Yes zZ ly�
4
Yes O -L
corrective Action Needed and Notes
12 j (te)
No L,._ -_) 'Yes t-_.:_ No
Vibe airy incident of non-Gamplianre rot above?
Sri I ty Gct e -I
CEiCMCA71(M STATEMENT
' 1 4MW under penaKy of h wd at this dacumenc and 211 ariadurrents were prepared cmlermy direction or supervision in
aonftBt roe u ed a s Win designed to assure that qualified personnel PmPr1Y gathered and evaluated the information
submiq 1. Based on my inquiry of the person or persons VU 0manVethesOt om, orth— persons dingy responsible for
gathering the "nnlafiun, IJ* iq rmatipn sutunittedisi, t, tw WA of my knowledge and belief, true, aeuvate, and complete. t
am aware that them are significant penalties forsubn ttblg false information, includingthe possibillty of fine and imprisonment
for knowing vlolations.
Print Mame and TMe. AMES HOWE- DANT INSPEMR
Signature: G
Date: / ! jj
T H E - C I T Y - O F
COPi LL
Bi -Weekly Report '- F iNn"� Date_
F y�S e
xa
ct.:e..aawr�tnr (�n..rtrrii�tibin Sita IacrwCtion Report
t--ft-!V.- /sem
255 PARKWAY * P.O.BOX 9476 A COPPCLL TX 75019 * TEL 9721462 0022 * FAX 9721304 3673
General Information
Project Name
Modification To Northlake Dams
NPDES Tracking No-
Date of Inspection
IDaUasTX
Inspector's Name:
lames Howe
Inspectors Title:
_
Dam Inspector
inspectors Contact information:
972-607-5466
Inspectors Qual-ifications:
Describe present phase of
construction
Ongoing Maintenance
Type of ton:
Regolalr
-
Pre -storm event
During
sbonn event Post -storm euercY
Weather kdbTM2ti4rk
Has there been a storm event since the last kkWc ftt YesNo ��
If yes, provide: Storm Start Date & rime
Stoma Owation (hrs.) f I ApprOAnat+e amOufifofPreofpltatier+{kM)
Weather at thine of inspection?
Clear Cloudy F=:�Rain
Snowing PZ'Nigh WindsOthei .
meet fOg
TemPm
Have anal cosdwrges oc u red since the last Inspection? yes-
if yes, describe:
�
ArethereanydIxlargesal<the time oiirapectoon? .. Yes
No ---
BMP
Mwr
Ono_ Wired?
Corrective Accton Needed and Notes
1 SlagPile
Yes .I '.�f.-- .i Yes
+
7Cf a=''Ccs ✓'�
Yes =
No
25
t_ ..- ..�
3
Yes i__:..� I.::.:,Yes It -ANO
a --
- •.
q
Yes _No ,...-._.i Yps
..-
5
Yes No _. res 1_
$nom
6
Yes gW= _No '____t Yes
7
YesNo „ Yes �No
$
Yes �. -,
(y. _•
9
YesNo (_ _.. Yes
1D
Yes •• (_.<- No _ Y� es - 'iNo
-
11
_
Yes 3 =, _jNo Yes .ANO.-
� ��-
12
Yes -.No �,. Yes
.JNo
13
Yes t . •.Ift {: -- Yes
__ No
14
Yes (No A.,�., Yes _
ENo
i5
Yes (f� 1110 �... ,. Yes
No
._
16
Yes �.'. ENo �. Yes
:. No
17
Yes No ^� Yes
No
18
Yes -TN—o7--7 Yes
-�.(Wo
No
19
_' Yes , No
Yes
E7
20
Yes ..jNo - Yes LJNO
�_--
255 PARKWAY * P.O.BOX 9476 A COPPCLL TX 75019 * TEL 9721462 0022 * FAX 9721304 3673
disturbed areas not
1 actively being worked
roeri stabilized? Yes
Are natural resource
areas (e g., streams.
Z wetlands, oratune trees,
etc) protected with
barriers or similar [?MPs? Yes
Are perimeter controls
and sediment barriers
3 adequately instailed
(keyed into substrate and
mabMained)? Yes
Are discharge points and
q receiving waters free of
any sediment deposits?
Ivrdlme"411C e
Implemented I Regwned?
1No
as No
Yes J No L
No
Yes_: No
AA—
Are storm drain inlets //(/
5 property protected? Y
Yes L
fNo .IVes —J Pio
is the construction exit /
preventing sediment
6 being tracked into the
street? Yes '- No Yes- No
is trash / Titter from work
7 areas mtected and placed
in covered dumpsters?
-
No Yes 1 ti
Yes __�
Are washout facilities
paint, stucco,
g conuete} available
concrete)
dearly marked, and
- —; t
No Yes _¢ No i
maintained?
Yes _`_
Are vehicle and
equipment fueling,
cleaning, and
/) /
g maintenance areas free
of spills, leaks, or any
other deleterious
NO
materials?
Yes ?`_ __;
Are that are
potential stormwater
retial sto
10 contaminates stored
inside or under cover?
_
^a
Yes ( No
Yes L -x_ fINO IQ`s
Are non-stormwater
discharges (e -g., wash
11
water, dewatering)
property controlled?
_
V. _- no '- Yes �iNo
r (
Corrective Action Needed and Notes
In2 iotei �tiL jl�bYes L—LL—Imor."
xibe arty incident of non-GDm Ianw not desafted -?
CERT'IfiCATIONSTATEwu Nr
a i Certify underpenalty of lawthat this document and alt attachments Were prepamd arrrtermy direriion or mon in
8CWM- oe urldr a system designed to assure that qualified persarrrrel Pmt -Pi gathered and evaluated the udormatiaa
submitted, eased on my inquiry of the person or persons who manage thesystem, orthose persons directly responsible for
gathering the information, the brfonnadon submitted1s, to the best of my krwwiedge and belief, bue, aco,rate, and complete. 1
am aware OW trete are significant penalties forsubmitting false information, indudingthe possibility offltw and imprisonment
for knowing violations.
Print Name and Title: JAMES HOWE -)DAM INSPECTOR
Signature:
Date: j
T H E • C I T Y • O F
COPPELL
RAIN EVENT DATE: �Zv (�%,f`S `ti ? $ RAINFALL:
Stormwatpr Cnnctrltr•tinn Cita Incnnrr+inn Dors. +
255 PARKWAY * P.O. BOX 947y * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
General Information
Project Name
Modification To Northlake Dams
NPDES Tracking No.
TXR1S002100
ILocation Dallas TX
Date of Inspection
�
''
d Time
Inspector's Name:
James Howe
Inspector's Title:
Dam Inspector
Inspector's Contact Information:
972-607-5466
Inspector's Qualifications:
Describe present phase of
construction
Ongoing Maintenance
Type of Inspection:
Regular
Pre -storm event
.
During storm event Post -storm event
Weather Information
Has there been a storm event since the last inspection:
If yes, provide: Storm Start Date & Time
Storm Duration (hrs.)
Yes No
Approximate amount of Precifpitation (ins.)
Weather at time of this inspection?
Clear Cloudy Rain
Snowing pz� High Winds Other
Sleet Fog
Temperature
Have any discharges occurred since the last inspection?
If yes, describe:
Yes
No
Are there any discharges at the time of inspection?
Yes
No
BMP
BMP)nstalled ?
timp am enance
_Require
Corrective Action Needed and Notes
1 Slag Pile
Yes No
Yes
2
Yes No
Yes
No
3
Yes No
Yes
ONo
4
Yes No
Yes
ONo
5
Yes No
Yes
No
6
Yes No
Yes
No
7
Yes No
Yes
No
8
Yes No
Yes
ONo
9
Yes No
Yes
UNo
10
Yes No
Yes
No
11
Yes No
Yes CjNo
12
Yes No
Yes
No
13
Yes No
Yes Lj
No
14
Yes No
Yes
No
15
Yes No
Yes
No
16
Yes No
Yes
UNO
17
Yes No
Yes
UNo
28
Yes No
Yes
UNO
19
Yes No
Yes
ONo
20
Yes No
Yes
No
255 PARKWAY * P.O. BOX 947y * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
BMP/ Activity
Implemented
maintenance
Required?
Corrective Action Needed and Notes
Are all slopes and
1
disturbed areas not
actively being worked
properly stabilized?
Yes ` Noy
Yes No
Are natural resource
areas (e g., streams,
2
wetlands, mature trees,
etc) protected with
barriers or simifar tSMPs?
Yes 9
Yes s �d No
F�
Are perimeter controls
and sediment barriers
3
adequately installed
(keyed into substrate and
_
p No
maintained)?
Yes No
YestiJ
Are discharge points and
4
receiving waters free of
any sediment deposits?
Yes No 3
�i}
Yes C_�' No
5
Are storm drain Inlets
properly protected?
Yes : No _
Yes EJ No ,
Is the construction exit
preventing sediment
/)
�^f
6
being tracked into the
street?8
C No
Yes No C J
Yes -D
Is trash / litter from work
7
areas colected and placed
In covered dumpsters?
�!
L
t -=–
Yes LJ No 1.
Yes .�!-' No
-_
Are washout facilities
(e.g., paint, stucco,
A—
A-
8
concrete) available
/ V
clearly marked, and
maintained?
Yes _— No 5q
Yes '` No L=J
Are vehicle and
equipment fueling,
cleaning, and
9
maintenance areas free
►y/
of spills, leaks, or any
1/'//J
other deleterious
materials?
Yes � b No
Yes No -
I
Are materials that are
potential stormwater
10
contaminates stored
inside or under cover?
Yes �` � No �`-.�
Yes -_ No
Are non-stormwater
11
discharges (e.g., wash
water, dewatering)
properly controlled?
Yes__ No
c
Yes No_
r
_ ,
12
(Other)
rip
Yes No
Yes P'D No
any incident of non-compliance not described above?
CERTIFICATION STATEMENT
" I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information
submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and
imprisonment for knowing violations.
Print Name and Title: JAMES HOWE - DAM INSPECTOR
P
L
Signature: /E Date: 5�C�
T 1-1 E C I T Y OP
L
L
Bi -Weekly Report's='' % Date:
�4.
C o iAcnartinn Rp_nort
y,2s=/Cf --
25S PARKWAY * P.O.BOX 9470 * COPPCLL TX 75019 * -rl=L )72/462 0022 * FAX 9'12!304 3673
General information
Project Name
Modification To Northlalce Dams
NPDES Tracking No.
Date of Inspection
TKR15002100
Location
Start/End Time
Dallas TX
inspector's Name:
James Howe
Inspector's Title:
Dam inspector
inspector's Contact information:
972-607-S466
Inspector's Qualifications:
Describe present phase of
construction
Ongoing Maintenance
Type of Inspection:
Regular
Pre -storm event
During storm event
Post -storm event
Weather Information
Has there been a storm event since the last inspection:
if yes, provide: Storm Start Date & Time
Storm Duration (hrs.)
Yes I No
Approximate amount of Preccfpitation (ins.)
Weather at time of this inspection?
Clear F�/ Cloudy Rain
Snowing High Winds �/� Other '
F=�Sleet
Fog
Temperature
Have any discharges occurred since the last inspection?
if yes, describe:
Yes •
No
Are there any discharges at the time of inspection?
Yes
No
BMP
BMP Installed ?
Vivir Corrective Action Needed and Notes
Re uired?
1 Slag Pile
Yes (, . t No s
: Ye
No I'— 3
LJ O
7
Yes a ; -, _. No
Yes
; No f.-: . i e
3
Yes 5 'ANO -::Yes
a
SNo .
4
Yes x , ,. <No @
t Yes 6
_ $ No i. .
5
1 No,:.
Yes r._ ..
Yes i .."No �... ,
6
Yes.:::'.jNo
=Yes (..7h10....-.
p
7
Yes 4 .. .tNo (_- -
-
Yes
aN
8
Yes i ........s No E I Yes 1..
. No
9
Yes No t...__.
xYes
10
Yes (_.,< (No
Yes E
No
11
Yes ?.:...:-No j.:.,.:rYes
f(No::-:
12
Yes ,No
13
Yes (.. . f No (
.. Yes
_, No �.: -...
14
Yes a ;No (_...IYes
'No
15
Yes .:..., No
Yes
f No f
16
Yes jNo._....:f
Yes !
_,No
17
Yes No :- -
Yes
lIIYes
a No 7
.1Yes
19
Yes �..-,-.. (No (- ,
, s Yes U..DNo8
20
Yes -
( Yes J
-1 -No (,
25S PARKWAY * P.O.BOX 9470 * COPPCLL TX 75019 * -rl=L )72/462 0022 * FAX 9'12!304 3673
BMP/ Activity
Implemented
nna+ncenance
Required?
Corrective Action Needed and Notes
Are all slopes an
disturbed areas not
1
actively being worked
properly stabilized?
Yes :!No
Yes1 No
Are natural resource
areas (e.g., streams,
2
wetlands, mature trees,
etc) protected with
barriers or similar BMPs7
Yes L� No I s
Yes No @
Are perimeter controls
and sediment barriers
3
adequately installed
(keyed into substrate and
maintained)?
Yes No
_
Yes _ o
Are discharge points and
4
receiving waters free of
any sediment deposits?
Yes ` 1NrciYes
!_ No
Are storm drain inlets
Y'
S
properly protected?
Yes L-JNo --Ji
Yes LNo
Is the construction exit
preventing sediment
- r„
JVD"/ A7
ti
being tracked into the
street?
u`
Yes
Yes:
Is trash / litter from work
Af -
7
areas colected and placed
//--
in covered dumpsters?
Yes No
Yes No
.y
Are washout facilities
(e.g., paint, stucco,
g
concrete) available
V
V
clearly marked, and-
maintained?
Yes �_ No
Yes_ No
Are vehicle and
equipment fueling,
cleaning, and
9
maintenance areas free
of spills, leaks, or any
other deleterious
materials?
Yes -',!No
Yes i No
Are materials that are
potential stormwater
j
10
i
contaminates stored
inside or under cover?
Yes JNo S
Yes ;; No: j
Are non-stormwater
11
discharges (e.g., wash
water, dewatering)
properly controlled?
YesNo lYes
No
12 (Other) N
any incident of -n—M--nce not described above?
CERTIFICATION STATEMENT
1 certify under penalty of taw that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information
submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the information, the htformation submitted is, to the best of my knowledge and belief, true, accurate, and complete. 1
am aware that there are significant penalties for submitting falseinformation, including the possibility of tine and imprisonment
for knowing violations.
Print Name and Title: f JAMES HOWE - DAM imcper-rr .
Signature:
� Date: �/ Z�
T ld E C I T Y 0 F
COPPELL
ee a ortBi-W kly R p c to
q
Stormwater ConstrUtion Site Inspection Report
255 PARKWAY * P.O.BOX 9478 * COPPELL 1-X 75019 * Tl'L 972/462 0022 * FAX 97.2/304 3673
General Information
Project Name
Modification To Northlake Dams
NPOES Tracking No.
TXR15002100
I location jDallas TX
Date of Inspection
— C Z^ '—
Start/End Time )J - "O ; 7M
Inspector's Name:
James Howe
Inspector's Title:
Dam Inspector
Inspector's Contact Information:
972-607-5466
Inspector's Qualifications:
Describe present phase of
construction
Ongoing Maintenance
Type of Inspection:
i/ Regular
Pre storm event
During storm event Post -storm event
Weather Information
Has there been a storm event since the last inspection:
If yes, provide: Storm Start Date & Time
Storm Duration (hrs.)
Yes No
Approximate amount of Precifpitation (ins.)
Weather at time of this inspection?
Clear Fj/ Cloudy
Snowing High Winds
Rain
Other
'
Sleet Fog
Temperature Ste/
Have any discharges occurred since the last inspection?
if yes, describe:
Ves • No
Are there any discharges at the time of inspection?
Yes No
BMP
BMP. Installed ?
Bmv
maintenance
Required? Corrective Action Needed and Notes
1 Slag Pile
Yes I/ No i_ ._.,t
-
Yes
-•ii✓ 'No ?., LC%=_
7.
..-„
a
Yes "! No
JYes
: -..')No ._
3
Yes S _ a No
-: Yes
ti No !
4
Yes I No @
Yes
g„ )No.
5
Yes ¢ .._-=INo r. ,1
Yes
? No t.._.,
6
Yes ) !Noa
Yes
) .. )No (,
7
Yes .. , .rNo [-
, Yes
) No
8
Yes _ _ gNo a Yes
�Nci 4
9
Yes No,-.
Yes.
10
Yes ;No
Yes
,_ No
11
Yes ?.,, . No
;Yes,.,
.R No ~. ,
12
Yes No, ._ ._
! Yes
13
Yes e..- rNo
Yes
m No {.
14
Yes ,No (
. Yes
)No p
15
Yes , . .,,>No •_
,) Yes
__, INo j
16
Yes ), ,No
Yes
;No i
17
Yes No ;. _
Yes
'Yes
9 No
18
Yes I ',::.,No
)..-.,)No
19
Yes ) 7. Noy
Yes
- JNO
20
Yes ; IVo I-
' Yes
) . No
255 PARKWAY * P.O.BOX 9478 * COPPELL 1-X 75019 * Tl'L 972/462 0022 * FAX 97.2/304 3673
BMP/ Activity
Implemented
mauaenance
Required?
Corrective Action Needed and Notes
Are all slopes an
disturbed areas not
1
actively being worked
properly stabilized?
Yes L jNo ,--
Yes3 No e r
Are natural resource
areas (e.g., streams,
2
wetlands, mature trees,
etc) protected with
barriers or similar BMPs?
Yes _ No
.,
Yes No
Are perimeter controls
and sediment barriers
3
adequately installed
(keyed into substrate and
maintained)?
Yes ':7-3, . No
Yes L No _
Are discharge points and
4
receiving waters free of
any sediment deposits?_
Yes No `__•.-
Yes No LEI
5
Are storm drain inlets
, V
properly protected?
Yes ry No
Yes ., No_ _
Is the construction exit
preventing sediment
6
being tracked into the
street?
Yes � No
' '
Ye§ - No
Is trash / litter from work
7
areas colected and placed`
r'
In covered dumpsters?
`
Yes No
Yes No _
Are washout facilities
(e.g., paint, stucco,
g
concrete) available
clearly marked, and
}
1—
L
maintained?
Yes Noa
Yes No
Are vehicle and
equipment fueling,
cleaning, and
9
maintenance areas free
of spills, leaks, or any
other deleterious
materials?
Yes No
Yes No
Are materials that are
stormwater
A- /�
10
potential
contaminates stored
l/'A"1
inside or under cover?
Yes iNo
Yes )No
Are non-stormwater
discharges (e.g., wash
11
water, dewatering)
properly controlled?
Yes CE�No[LJIYes
No _-
22 (Other) J l � 1 / ��%
..,`,. No R,.,_
Yes pV 1 4 99 ##
€..:,.., J Yes 1... i No V ..
any incident of non-compliance not described above?
CERTIFICATION STATEMENT
1 certify under penalty of law that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information
submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. 1
am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment
for knowing violations.
Print Name and Title: JAMES HOWE - DAM INSPECTOR
Signature: -"i
Date: -Z/