Loading...
2018 1st Quarter.► s AID I_ ' aft\{/ , !.• (4' C'=! RAIN EVENT DATE: 3 -,� 7- Y K iI RAINFALL:. Stormwater Construction Site Inspection Report 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 } FAX 9721304 3673 General Information Project Name Modification To Northlake Dams NPDES Tracking No. TXR15002100 Location Datlas TX Date of Inspection 2.., t 5, Start/End Time ; C S2!! eq Inspector's Name: James Howe inspector's Title., Dam Inspector Inspector's Contact Information: 972-607-5466 Inspector's Qualifications: Describe present phase of construction Ongoing Maintenance Type of Inspection: Regular Pre -storm event During storm event Post -storm event Weather Information Has there been a storm event since the last inspection: If yes, provide: Storm Start Date & Time Storm Duration (hrs.) Yes _ No Approximate amount of Precifpitation (ins.) Weather at time of this inspection? Clear I Cloudy Rain Snowing High WindsPR'� Other F- Sleet F Temperature Fog Have any discharges occurred since the last inspection? If yes, describe: Yes No Are there any discharges at the time of inspection? Yes No BMP BMPlnstalled ? Esmv ain enanee ftecaint Corrective Action Needed and Notes 1 Slag Pile Yes No f Yes - o _ ' v c, -C,) J 2 Yes No L Yes LjNo �z 3 Yes No ^ Yes LjNo 4 Yes No Yes L7 No 5 Yes _ No 4i Yes LJNo i 6 YesNo Yes No 7 Yes No =Yes No 8 Yes No Yes UNo 9 Yes =No Yes No 10 Yes No Yes No _ 11 Yes =No i Yes No �l 12 Yes No Yes UNO 13 Yes No Yes UNo _ 14 Yes No , Yes UNO 15 Yes =N6 Yes No 16 Yes =No " Yes UNo 17 Yes =No Yes UNo _ 18 Yes No Yes No 19 Yes =No Yes No 20 Yes NoYes No 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 } FAX 9721304 3673 Implemented MaintenanceRequired? Corrective Action Needed and Notes BMP/ Activity Are all slopes and 1 disturbed areas not actively being worked roperly stabilized? Yes No Q Yes Q No _ Are natural resource areas (e-g., streams, 2 wetlands, mature trees, etc) protected with barriers or similar BMPs? YesNo Q Yes r IND Are perimeter controls and sediment barriers 3 adequately installed (keyed into substrate and No Yes Q No maintained)? Yj. es Are discharge points and q receiving waters free of any sediment deposits? Yes 6No Yes ';'_ : No drain inlets /• S Are storm properly protected? No Q YesNo Yes Is the construction exit 6 preventing sediment being tracked into the Q street? Yes No - _ Yes No Is trash /litter from work 7 areas colected and placed in covered dumpsters? Yes No Yes 0No Are washout facilities � (e.g., paint, stucco, g concrete) available LNo clearly marked, andNo Yes_ . . Yesmaintained? Are vehicle and equipment fueling,VT / 1/ cleaning, and 9 maintenance areas free of spills, leaks, or any other deleterious ONo materials? Yes o -,-.,_,!Yes Are materials that are L10 potential stormwater contaminates stored inside or under cover? _ No Yes No Yes o Are non-stormwater discharges (e.g., wash 11 water, dewatering) properly controlled? Yes O LJ Yes ONO CEJJ 12 (Other) /v �— IvIg– Yes =No Yes ®No Describe any incident of non-compliance not described above? F- Wo CERTIFILATION STAT EMEN I 'tb C9 c) I Qr4a1-0 " I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. 1 am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Print Name and Title: JAMES HOWE - DAM INSPECTOR Signature:Date: 3.- �t> CUFF - LLL Date; 255 '^«^w^, ^ r000xo^,u ° corpcLL,,ao/o + TEL v,m^vxvox2 ^ VAX 9721304 3673 BMP/ Activity I Implemented Area s oyes and - 1 disturbed areas not actively being worked ro erl stabilized? Yes ` Are natural resource areas (eg., streams, 2 wetlands, mature trees, etc) protected with barriers or similar BMps? Yes p Are perimeter controls and sediment barriers 3 adequately installed (keyed into substrate and rviainienance Required? No h i Yes l -tamed)? Yes_._ ; No Are discharge points and 4 receiving waters free of any sediment deposits? Yes 5 Are storm drain inlets /r Properly Protected? Yes No Is the construction exit 6 Preventing sediment being tracked into the street? Yes No Is trash / litter from work 7 areas colected and Placed In covered dumpsters? Jp�/ .' Are washout facilities Yes ` No (e.g., paint stucco, 8 concrete) available -j clearly marked, and maintained? Yes No Are vehicle and-= equipment fueling, cleaning, and 9 maintenance areas free ofspifls, leaks, or any other deleterious materials? Yes No Are materials that are 10 Potential stormwater f /- contaminates stored `" inside or under cover? Yes No Are non-stonnwater 11 discharges (e.g., wash water, dewatering) Properly controlled? No No No No Yes <- .IWO Yes No es No _ ;No - _I _.� No No Corrective Action Needed and Notes 22 L(Other) Yes Nor, Yes,=r No i ribe any incident of non-�ampiiante not described above CERTIFICATION STATEMENT ! certify under Penalty of law that this accordance with a document that and all attachments were prepared under m direction submitted B system designed to assure Lhat qualified personnel y on or supervision Based on my inquiry of the person or P-P-Iy gathered and evaluated the infrmat in gathering the information, the information submitted is to who Manage the system, or those am aware that there are significant penalties for submitting false Information including the Peons directly responsible for best of my knowledge and belief, true, accurate, and complete. ! for knowing violations. Possibility of fine and imprisonment Print Name and Ti i t e. JAMES "OWE - DAM INSPECTOR Signature: Date: �` J THE -CITY -OF RAIN EVENT DATE: -7.2 RAINFALL: Stormwater Construction Site Inspection Report "7.55 PARKVVAY * P.O.HOX 947FJ * COPPELL TX 75019 f; TEL 972/4G2 0022 * FAX 972/304 3673 General Information Project Name Modification To Northlake Dams NPOES Tracking No. TXR15002100 ILocation 10allasTX Date of Inspection — Start/End Time ; Vz; �rn - 1 Inspector's Name: JafRes Howe Inspector's Title: Dam Inspector Inspector's Contact Information: 972-607-5466 Inspector's Qualifications: Describe present phase of construction Ongoing Maintenance Type of Inspection: Regular Pre -storm event During storm event ost-storm event Weather Information Has there been a storm event since the last inspection: If yes, provide: Storm Start Date & Time ,.•Z, :{ Storm Duration (hrs.) " �`f � r2 - Yes No i, 1 ; Approximate amount of Precifpitation (ins.) r '� Weather at time of this inspection? Clear Cloudy Rain SnowingF_'� High Winds Other Sleet Temperature Fog Have any discharges occurred since the last inspection? If yes, describe: "r Yes No Are there any discharges at the time of inspection? Yes No amp BMP Installed ? am enance Required? Corrective Action Needed and Notes 1 Slag Pile Yes No _-- Yes o oz;, w �� J 2 Yes No Yes - No e CA CLfL 3 Yes x_ No Yes No i -- 4 Yes i_ No Yes No 5 Yes No Yes iNo -'No 6 Yes No Yes 7 Yes No Wes No 8 Yes No iYes "No 9 Yes No ;Yes,No 10 Yes No 17_7 Yes kNo 11 Yes No Yes - . No 12 Yes No Yes No 13 Yes q,5_ No Yes No _ 14 Yes _ _-No Yes No a - 15 Yes "No Yes U ; No I 16 Yes No Yes !77_0 :. 17 Yes No L .._' Yes No ° 18 Ives No Yes L.jNo I 19 Yes iNo s Yes lNo 20 Ives v J No Yes No "7.55 PARKVVAY * P.O.HOX 947FJ * COPPELL TX 75019 f; TEL 972/4G2 0022 * FAX 972/304 3673 Implemented maintenance enannance Corrective Action Needed and Notes BMP/ ActivityRequired? Are all slopes and disturbed areas not 1 actively being worked �� Yes CD No properly stabilized? Yes No s s Are natural resource areas (e.g., streams, 2 wetlands, mature trees, etc) protected with barriers or similar BMPs? Yes No Yes No _ Are perimeter controls and sediment barriers 3 adequately installed (keyed into substrate and maintained)? YesEZZJ/No- $ Yes '- 'No Are discharge points and 4 receiving waters free of any sediment deposits? Yes No 's' Yes No Are storm drain inlets ►� % It/14 5 properly protected? - / - ` Yes - No Yes 'No Is the construction exit preventing sediment 6 being tracked into the street? Yes _I/- No Yes No _ Is trash / litter from work / � 1/ / 7 areas colected and placed in covered dumpsters? Yes _ __- No ,- Yes No Are washout facilities (e.g., paint, stucco, � % a j yQ 1 g concrete) available /� V clearly marked, and C11— maintained? Yes 5�______- No Yes —,No Are vehicle and equipment fueling, cleaning, and 9 maintenance areas free of spills, leaks, or any other deleterious � materials? Yes s _ ? No lf' Yes No Are materials that are / potential stormwater t' V f'T A 10 contaminates stored inside or under cover? Yes No Yes No Are non-stormwater discharges (e.g., wash 11 water, dewatering) properly controlled? Yes" No Yes No 12 (Other) l V Yes _z_ NoE � N 1 Yes I_'�� No �___.� any incident of non-compliance not described above? CERTIFICATIOU STATEM ENT I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Print Name and Title: JAMES HOWE - DAM INSPECTOR Signature: Date: T H E C I T Y O F COPP-ELL RAIN EVENT DATE: j r F .s j`` s'1 �' `' s RAINFALL: S StnrmwatPr Construction Site Insnection Report 255 PARKWAY * P.0.60X 9478 * COPPELL TX 7501 9 * TEL 972/462 0022 * FAX 972/304 3G73 General Information Project Name Modification To Northlake Dams NPDES Tracking No. TXR15002100 ILocation I Dallas TX Date of Inspection A-� - 2,i Start/End Time ' d — z [k gl Inspector's Name: James Howe Inspector's Title: Dam Inspector Inspector's Contact Information: 972-607-5466 Inspector's Qualifications: Describe present phase of construction Ongoing Maintenance Type of Inspection: Regular F-7-771Pre-storm event During storm event F-771Post-storm event Weather Information Has there been a storm event since the last inspection: Yes No If yes, provide: Storm Start Date &Time Storm Duration (hrs.) Approximate amount of Precifpitation (ins.) Weather at time of this inspection? Clear Cloudy Rain SnowingF::� High Winds Other Sleet Temperature Fog Have any discharges occurred since the last inspection? Yes If yes, describe: No Are there any discharges at the time of inspection? Yes No BMP BMF maintenance BMPlnstalled ? Required?tCorrective Action Needed and Notes 1 Slag Pile Yes No __Yes ` o 2 Yes No js Yes No 3 Yes No a Yes No-� f` ; 4 Yes No� 5 Yes No 6 Yes 4YeN No 7 Yes No 8 Yes No 9 Yes No tea; Yes No 10 Yes =No 'Yes No 11 Yes No,! Yes ONo 12 Yes No Yes No 13 Yes U jNo='i; Yes No 14 Yes No Yes No 15 Yes No Yes No 16 Yes Noi Yes No 17 Yes Not No 18 Yes No19 Yes No20 Yes No No 255 PARKWAY * P.0.60X 9478 * COPPELL TX 7501 9 * TEL 972/462 0022 * FAX 972/304 3G73 BMP/ Activity Implemented maintenance Required? Corrective Action Needed and Notes Are all slopes and 1 disturbed areas not actively being worked No Yes Q No properly stabilized? Yes Q Q Are natural resource areas (e.g., streams, 2 wetlands, mature trees, etc) protected with barriers or similar BMPs? Yes an No (=Yes Q No CIZI Are perimeter controls and sediment barriers 3 adequately installed (keyed into substrate and Q No CEf maintained)? Yes C]Zf No Yes Are discharge points and 4 receiving waters free of any sediment deposits? �o Q IM Yes Yes No Are storm drain inlets /� � Al 4 5 properly protected? 1 v Yes =No =Yes O No O Is the construction exit 6 preventing sediment being tracked into the street? Yes U ryo O Yes Q No Is trash / litter from work y 7 areas colected and placed in covered dumpsters? O O No Q O Yes No Yes Are washout facilities (e.g., paint, stucco, g concrete) available clearly marked, and Q O O Q maintained? Yes No Yes No Are vehicle and equipmentng, cleaningg,, and /V 9 maintenance areas free of spills, leaks, or any other deleterious materials? Yes Q No O Yes C3No Are materials that are 10 potential stormwater �V contaminates stored inside or under cover? Yes No = Yes O No Q Are non-stormwater 11 discharges (e.g., wash water, dewatering) properly controlled? yes CEJ'No Q Yes O No 12 (Other) �l k Yes ® No CD 11114 Yes O No Q Describe any incident of non-compliance not described above? n I-, 7fc' CERTIFICATION STATEMENT ✓ Q Y -(—k K n_ t1 co " I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Print Name and Title: Signature: MES HOWE - DAM INSPECTOR - /._ l Date: T H E • C i T Y. o F COPPELL 0 RAIN EVENT DATE: � ^ :Z --� F �� S'- 4 :1 � 8 8 � RAINFALL; n Stormwater Construction Site Inspection Report General information Project Name Modification To Northlake Dams NPOES Tracking No. TXR15002100 Location Dallas TX Date of Inspection Z (r, _ Start/End Time / Lu — Inspector's Name: James Howe Inspector's Title: Dam Inspector Inspector's Contact Information: 972-607-5466 Inspector's Qualifications: Describe present phase of Ongoing Maintenance construction Type of Inspection: regular APre-storm event During storm event Weather Information Has there been a storm event since the last inspection: Yes [/ No If yes, provide: Storm Start Date & Time _11 _ 3,n Storm Duration (hrs.) �/ Approximate amount of Precifpitation (ins.) Weather at time of this inspection? Clear Cloudy Rain . Sleet Fog Snowing High Winds Other Temperature Have any discharges occurred since the last inspection? Yes No V If yes, describe: e - Are there any discharges at the time of inspection? Yes No 1 2 3 4 S 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 BMP SMP Installed ? I-, Slag Pile I Yes o Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No Yes ' J0 event Required? I Corrective Action Needed and Notes -evtG i1+ e',acc s R 255 PARKWAY * F -0 -BOX 9470 * COPPELL TX 75019 * TEL 972/402 0022 * FAX 972/304 3673 BMP/ Activity implemented maintenance Required? Corrective Action Needed and Notes Are all slopes and 1 disturbed areas not actively being worked ___ properly stabilized? Yes No l`_ Yes ' g No Are natural resource areas (e.g., streams, Z wetlands, mature trees, etc) protected with barriers or similar BMPs? yes E2 No + Yes CD No Are perimeter controls and sediment barriers 3 adequately installed (keyed into substrate and maintained)? Yes c No Yes No Are discharge points and 4 receiving waters free of any sediment deposits? Yes No a Yes L No Are storm drain inlets, 5 properly protected? / Yes No Yes ® N,o, Is the construction exit 6 preventing sediment being tracked into the meet? Yes _ No Yes CD If. Is trash / litter from work 7 areas colected and placed ✓ v in covered dumpsters? 0 Yes No Yes No Are washout facilities (e.g., paint, stucco, 8 concrete) available clearly marked, and ® CD maintained? Yes No Yes No Are vehicle and equipment fueling, 9 cleaning, and maintenance areas free j 7 of spills, leaks, or any other deleterious LJNo materials? Yes No Yes Are materials that are 10 potential storrnwater contaminates stored inside or under cover? yes No Yes Li No Are non-stormwater 11 discharges (e.g., wash water, dewatering) properly controlled? yest. I No ( Yes = No Describe any incident of non-compliance not described above? �e� CERTIFICATION STATEMENT " I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Print Name and Title: JAMES HOWE - DAM INSPECTOR Signature: Date: `� 414 12 (Other) Yes I NoJ. i No „ y Describe any incident of non-compliance not described above? �e� CERTIFICATION STATEMENT " I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Print Name and Title: JAMES HOWE - DAM INSPECTOR Signature: Date: `� T H E C 1 T Y O F COFFELL RAIN EVENT DATE: Zi IA F x S�`: V s A RAINFALL: Stnrmwater Construction Site Inspection Report 255 PARKWAY * P.0.80X 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 General information Project Name Modification To Northlake Dams NPDES Tracking No. TXR15002100 Location jDaIIasTX Date of Inspection "�2 _,:?--Z— — Start/End Time AMu Inspector's Name: James Howe Inspector's Title: Dam Inspector Inspector's Contact Information: 972-607-5466 Inspector's Qualifications: Describe present phase of construction Ongoing Maintenance Type of Inspection: Regular E-71Pre-storm event During storm event Post -storm event Weather Information Has there been a storm event since the last inspection: If yes, provide: Storm Start Date & Time Storm Duration (hrs.) Yes No Approximate amount of Precifpitation (ins.) Weather at time of this inspection? Clear Cloudy Rain Snowing High Winds Other �'� Sleet Temperature Fog Have any discharges occurred since the last inspection? If yes, describe: Yes Are there any discharges at the time of inspection? Yes L= No BMP BMPinstalled ? maintenance Required? Corrective Action Needed and Notes Slag Pile Yes 0 3'No - Yes o W •e-• --c- - T,7 TT1 2 Yes No Yes No Geo iZ 3 Yes No j Yes UNo 4 Yes No Yes UNO 5 Yes =No I Yes UNo 6 Yes =No Yes LjNo 7 Yes No Yes LjNo 8 Yes No Yes I No 9 Yes No Yes No 10 Yes =No Yes UNo 11 Yes No Yes I No 12 Yes No Yes No 13 Yes =No f Yes No 14 Yes No Yes No 15 Yes No Yes No 16 Yes No € Yes No 17 YesMT—'—rNoYes No18 YesYes No19 YesYes No 20 YesYes LjNo 255 PARKWAY * P.0.80X 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 BMP/ Activity Implemented Maintenance Required? Corrective Action Needed and Notes Are all slopes and 1 disturbed areas not actively being worked properly stabilized? Yes �No i �@ Yes No Are natural resource areas (e.g., streams, Z wetlands, mature trees, etc) protected with barriers or similar BMPs? Yes L-�ZNO C= Yes =NO CID Are perimeter controls and sediment barriers 3 adequately installed (keyed into substrate and maintained)? Yes (0 No M Yes ® No GZf Are discharge points and 4 receiving waters free of any sediment deposits? ® Yes GZfNO CD Yes No Are storm drain inlets /V 5 properly protected? Yes = No ® Yes CD No, Is the construction exit 6 preventing sediment being tracked into the street? �No ® Yes Yes two Is trash / litter from work r %�- 7 areas colected and placed in covered dumpsters? Yes No Yes No M 3 Are washout facilities g (, paint, stucco, concrete) available /� � / ,A iYj clearly marked, and maintained? Yes = No Yes CD No Are vehicle and equipment fueling, 9 cleaning, and maintenance areas free / y� / 4 of spills, leaks, or any other deleterious materials? Yes =No =Yes ®No Are materials that are 10 potential stormwater contaminates stored inside or under cover? yes L --j No Ej Yes 0 No Are non-stormwater 11 discharges (e.g., wash water, dewatering) properly controlled? Yes Callo ® Yes ® No 12 (Other) �/A-- �/1, Yes No ,-, Yes ® No Describe any incident of non-compliance not described above? CERTIFICATION STATEMENT 1 certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Print Name and Title: JAMES HOWE - DAM INSPECTOR Signature: Date: ? Z J7 T H E C 1 T Y . O F OFF CE"LL P-�=,q -}� �l'j i r: , / o Date: Bi-WeeklyReport Fw t Cl Stormwater ConSite Iflsnection Report 255 PARKWAY t P_O.BOX 9478 * COPPELL TX 75019 it TEL 972/462 0022 * FAX 9721304 3673 General Information Project Name Modification To Northlake Dams NPDES Tracking No. TKR15002100 ILocation jDallas TX Date of inspection - ) Start/End Tim 3 Inspector's Name: James Howe Inspector's Title: Dam Inspector "' Inspector's Contact Information: 972-607-5466 Inspector's Qualifications: Describe present phase of construction Ongoing Maintenance Type of Inspection: Regular Pre -storm event During storm event Post-stonnn went Weather Information Has there been a storm event since the last inspection: Yes No If yes, provide: Storm Start Date &Time Storm Duration (hrs.) Approximate amount of Precifpitation (ins.) Weather at time of this inspection? Clear Cloudy Rain SnowjngF High WindsF�] Other" Sleet Temperature Fog S Have any discharges occurred since the last inspection? T No If yes, describe: Are there any discharges at the time of inspection? Yes No t- BMP "IBMP_Installed ? . maintenanceBmr Required? Corrective Action Needed and Notes 1 Stag Pile Yes. j/No ( _ Yes 2 Yes ItNo __- Yes 3 Yes - No 4 Yes € No 3-- - 4 YesRto Yes ri .No_ 5 Yes �N0 �t Yes _ Jno 6 Yes ) :_No t Yeses No 7 Ves (, _ Na ._..jjYes. ::jNo 8 Yes .. yes (. No 9 Yes 4.._ ,NOYes 10 Yes -) _ - No Yes 11 Yes a 3No Yes UNO 12 Yes No Yes U_j No 13 Yes LANo 14 Yes (No y .Yes 15 Yes -�11b Yes No - 16 Yes.„ _ tNo -- Yes 17 YesNo _ Yes ^ No 18 Yes ,,Rbv'- - -V Ves No 19 Yes No Yes L-. Rio %. 20 Yes -120 -- Yes UNo 255 PARKWAY t P_O.BOX 9478 * COPPELL TX 75019 it TEL 972/462 0022 * FAX 9721304 3673 BMP/ Activity -a -0 - Implemented maenzenar:ce Required? Corrective Action Needed and Notes Are all slopes opesandisturbed disturbed areas not actively being worked ro eri statril¢ed? Yes 0 Yes :'— ^ No Are natural resource areas (e g_, streams, 2 wetlands, mature trees, etc) protected with barriers or similar BMPs? Yes `2No =Yes No Are perimeter controls and sediment. barriers 3 adequately installed (keyed into substrate and _ maintained)? Yes No ( Yes h No Are discharge points and 4 receiving waters free of any sediment deposits? Yes No Yes No Are storm drain inlets properly protected? ''tt r -- Yes L—_j No Yes No Is the construction exit 6 preventing sediment being tracked into the street?_ `a Yes No r^7110 F - •Yes • :` .J I 7 Is trash / litter from work areas colected and placed in covered dumpsters?__ Yes j No Yes No Are washout f<ic9t'rties 8 (e.g., paint, stucco, concrete) available clearly marked, and maintained? Yes 4 No Yes No _', Are vehicle and equipment fueling, cleaning, and ^ t 9 maintenance areas free ►" of spills, leaks, or any other deleterious materials? Yes LJ No L_—( Yes i ;!No 11 Are materials that are potential stormwater 10 f contaminates stored inside or undercover? Yes_ __� No Yes $_ 'No Are non-stormwater 11 discharges (e.g., wash water, dewatering) � Properly controlled? Yes _-1 No Yes l No 12 (Other) No any incident of non-?wnpliance not described above? CERTIFICATION STATEMENT 1 certify under tensity of law that this document and all attachments were Prepared under my direction or supervision in accordance with a system designed to assure that quaified personnel properly gathered and evaluated the infonnatron submitted. Based on my inquiry of the person or persons who manage the system, or those gathering the information, the information subrnitted is, to the best of my knowledge and those beliPfersons directly responsible for am aware that there are significant penalties for submitting false information, ledgincludin the true, accurate, and complete, 1 g possibility of fine and imprisonment for knowing violations. Print Name and Title: JAMES HOWE - DAM iNSPECrOR Signature: Date: T FI E C I T Y O F COFFELL Bi -Weekly Report Z' = � `\ L j'�`=� 2), Date: Stormwater Construftibn Site Inspection Report 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 is TEL 9727462 0022 * FAX 972730.7 3G73 General Information Project Name Modification To Northlake Dams NPDES Tracking No. TXRIS002100 IDallasTX Date of Inspection 31' Inspector's Name: James Howe Inspector's Title: Dam Inspector Inspector's Contact Information: 972-607-5466 Inspector's Qualifications: Describe present phase of construction Ongoing Maintenance Type of Inspection: Regular Pre -storm event During storm event Post -storm event Weather Information Has there been a storm event since the last inspection: If yes, provide: Storm Start Date & Time Storm Duration (hrs.) Yes No Approximate amount of Precifpitation (ins.) Weather at time of t,Pbis inspection? Clear Cloudy SnowingF=1 High Winds Rain FOther ' Sleet F Fog Temperature Have any discharges occurred since the last inspection? If yes, describe: Yes • No Are there any discharges at the time of htspection? Yes No BMP SMP -installed 7 111vil, maintenance Required? Corrective Action Needed and Notes 1 Slag Pile Yes `( 2 Yes._ No Yes JNo 3 Yes ) No ;Yes ,No ..,( 4 Yes 1, : No - f Yes I ?,No__ 5 Yes 11 No Yes )No 6 Yes !No i7 Yes i No ) 7 Yes. ._° .,No.:.:. Yes 8 Yes 9 Yes allo Yes (_ ,sNo -- 10 Yes ? u No = Yes ; No 11 Yes J, yj No ( Yes E. J 12 Yes No f Yes s 13 Yes No k YesT. No a 14 Yes No t• . _ _ Yes _ _n No 15 Yes NoYes # No. 16 Yes No ) $ Yes., , _9No 17 Yes, a.No r Yes No-[..-„ _s 18 Yes _ , No € Yes ) No j - -- 19 Yes (,- _ )No s YesNo, 20 Yes (.-_„jNo `Yes .-_(No �,_ 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 is TEL 9727462 0022 * FAX 972730.7 3G73 -- BMP/ Activity implemented ivIauaenarice Required? Corrective Action Needed and Notes Are all slopes an disturbed areas not 1 actively being worked j No properly stabilized? Yes No Yes Are natural resource areas (e.g., streams, Z wetlands, mature trees, etc) protected with j barriers or similar BMPs? r Yes !;No _ Yes No Are perimeter controls and sediment barriers 3 adequately installed (keyed into substrate and U6No Yes No maintained)?Yes Are discharge points and 4 receiving waters free of any sediment deposits? Yes U - No 1__. Yes _ a No V �{ F Are storm drain inlets 5 properly protected? Yes ) No „ _ Yes No is the construction exit preventing sediment 6 being tracked into the street? Yes 6No `: Yes No is trash / litter from work �C 7 areas colected and placed" in covered dumpsters? =No (_J Yes Yes Nox Are washout facilities r (e.g., paint, stucco, g concrete) available clearly marked, and, maintained? Yes No ` ;Yes No D Are vehicle and equipment fueling, 9 cleaning, and maintenance areas free of spills, leaks, or any other deleterious materials? Yes No Yes No F - Are materials that are potential stormwater { i 10 contaminates stored inside or under cover? Yes No Yes a No Are non-storrnwater 11 discharges (e.g., wash water, dewatering) properly controlled? r Yes -, - No Lj lYes LD No "?l_,- 12 1 (Other) 1 K 0- I (► � f,�_ No Describe any incident of non-_Qompliance not described above? CERTIFICATION STATEMENT I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties forsubmitting false information, including the possibility of fine and imprisonment for knowing violations. Print Name and Title: jij JAMES FiOWE -DAM INSPECTOR Signature, _ j f ate: i' T 1-1 E - C I T Y O F COFFELL Bi -Weekly Report it iY ; n %' '� Date: 'q o Stormwater Construftibn Site lAsnection Report _ General Information Project Name Modification To Northlake Darns NPDES Tracking No. TXRiS002100 Location Dallas TX Date of Inspection - /� (- Startgnd Time Inspector's Name: James Howe Inspector's Title: Dam Inspector Inspector's Contact Information: 972-607-5466 Inspector's Qualifications: Describe present phase of construction Ongoing Maintenance Type of I ction: Regular Pre -storm event During storm event Post -storm event Weather Information Has there been a storm event since the last inspection: Yes No If yes, provide: Storm Start Date & Time Storm Duration (hrs.) Approximate amount of Precifpitation (ins.) Weather at time of this inspection? Clear Cloudy Rain Snowing High Winds Other ' PTemperature Sleet Fog Have any discharges occurred since the last inspection? Yes - No If yes, describe: Are there any discharges at the time of Inspection? Yes No !/ BMP IMP BMP, Installed ? Maintenance Required? Corrective Action Needed and Notes 1 Slag Pile Yes �e ; No p ?Yes jNo �f / .r , �� 2 Yes.. --,No Ye TINO 3 Yes No - ._ es No 4 Yes -: ..-:-)No --jYes 5 4.....___ No �::- -i Yes Yes _y i^ $No : 6 Yes ) 7No (...;,__E Yes^ -,No, 7 Yes r<...,jNo - Yes I.. )No I .j 8 Yes h__._.,.i No � _ :.. €Yes !__._.)No _.. iNo g 9 Yes 4.>_ -,.No ?_ -_. r Yes ?No ;_: ,.j 10 Yes _ No Yes @ No it Yes P._-_..4NoYes -,I No__'_, 12 Yes j No -:}Yes :-)No -- 13 y- Yes t..�,.:.:NO ---_..tYes - - t __yNo 14 Yes ,No e}Yes<No 15 Yes:_.SYesNo .: 16 Yes k_ _ ._-')No�No Yes _ 17 Yes._. No (� ti Yes No 18 Yes .- No Yes ),,,.SNo 19 _ Yes t. �No ) _~g Yes K 71NO c..__I 20 Ives t-- I No s, I Yes .. JN �.- 255 PARKWAY } P -0 -BOX 9478 * COPPELL TX 75019 * TEL 97.1_/462 0022 * FAX 972/304 3673 ? t.orreccnve Acnun 1—cucu a.••• •------ Required. implementedtJYes 8MP/Activity Ar�opes and disturbed areas not: 1 actively being worked Yes I No J. No _ ro er! stabii'¢ed? _ Are natural resource areas (e.g., streams, 2 wetlands, mature trees, etc) protected with barriers or similar BNIPs? No� Yes - No Yes a_ �~` Are perimeter controls and sediment barriers 3 adequately installed and (keyed into substrate Yes _ `f' No Yes (_�? No maintained)? Are discharge points and q receiving waters free of any sediment deposits? Yes 17 ----- - a _J No :Yes "' No i Are storm drain inlets v 5 properly protected? � 4 No ? Yes No ,�_J Yes ;� is the construction exit preventing sediment 6 being tracked into the street?Yes { No - I Yes i No Is trash / litter from work 7 areas colected and placed in covered dumpsters? Yes __ No Yes No = Are washout facilities (e.g., paint, stucco, 1 g concrete) available dearly marked, and Yes No� Y�� No maintained? Are vehicle and equipment fueling, cleaning, and g maintenance areas free of spills, leaks, or any other deleterious materials? Yes =` No L_ ti Yes _ ' No Are materials that are potential stormwater 10 contaminates stored inside or under cover? Yes � No L Yes ' _JNo _ _, Are non-stormwater discharges (e.g., wash 11 water, dewatering) properly controlled?Yes V No ( Yes No _' 12 1 (Other) I iV 6— I �V { No e any incident of non-compliance not described above? CERTIFICATION STATEMENT 1 certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Print Name and Title: JAMES HOWE - DAM INSPECTOR Signature: fir/ r Date: l