Loading...
NL Cypress-CS180511 T H E C 1 T Y O F COPPELL * •X‘<"". o4 x A S , 8 Travis Fieseler May 11, 2018 L.H. Lacy Company 1880 Crown Rd. Suite 1200 Dallas, Texas 75234 RE: Final Acceptance Letter Wrangler @ Olympus Dear Mr. Fieseler: Representatives of the City of Coppell have confirmed a final inspection of paving and utilities for the referenced project. The two-year maintenance bonds have been received. Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control Bond LC will also be two years from the date of this letter. You may notify MS4 (City of Coppell) at any time during the two-year maintenance period if stabilization of the site per the SWPPP permit can be demonstrated. If so, complete and submit a Notice of Termination (NOT) to discontinue coverage under the SWPPP permit. A follow up inspection of the facilities will be conducted prior to the lapse of the two- year bond period. If any punch list items are noted at that time, you will be contacted to make repairs. Sincerely, Marcus Ma.n Construction Inspector II Office Phone: (972) 304-3684 Fax: (972) 304-3570 cc: Kent Collins, P.E., Assistant Director of Engineering Michael Garza, P.E., Assistant Director of Public Works Suzanne Arnold, Chief Building Official Tim Oates, Deputy Fire Chief Jennifer Miller, Finance Director 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673