ST1501A-CS180518
Priscilla Martinez
From:Marcus Marion
Sent:Friday, May 18, 2018 7:19 AM
To:Priscilla Martinez
Subject:Freeport Parkway Reconstruction - Bridge Panel Inspections
This is a correspondence for the bridge panel inspections
From: Darryl Zbranek
Sent: Thursday, May 17, 2018 1:19 PM
To: Joel Peters <JDPeters@kleinfelder.com>
Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>; Marcus Marion <MMarion@coppelltx.gov>;
Amanda Chandler <AChandler@kleinfelder.com>; Kyle Woodard <kwoodard@kleinfelder.com>
Subject: Re: Freeport Parkway Reconstruction
See below, please keep us informed when this happens.
Thanks,
DZ
Sent from my iPhone
On May 17, 2018, at 12:02 PM, Joel Peters <JDPeters@kleinfelder.com> wrote:
Darryl,
The contractor may coordinate the inspection event with our dispatcher (Amanda Chandler) in our
Austin office. They can reach her by calling 512-926-6650. We will likely be utilizing Kyle Woodard, one
of our senior inspectors to cover the activities.
Please let me know if there are any questions or if you need additional information.
Thank you.
Joel Peters, PE
Project Manager
7805 Mesquite Bend Dr, Suite 100
Irving, TX 75063
o| 972.868.5900
d| 972.868.5916
m| 214.876.5559
f| 972.409.0008
<image002.png>
<image003.jpg>
<image004.jpg><image005.jpg><image006.jpg><image007.jpg><image008.jpg>
1
From: Darryl Zbranek \[mailto:dzbranek@coppelltx.gov\]
Sent: Thursday, May 17, 2018 9:29 AM
To: Joel Peters <JDPeters@kleinfelder.com>
Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>; Marcus Marion
<MMarion@coppelltx.gov>
Subject: RE: Freeport Parkway Reconstruction
External Email.
Joel,
I have talked to our contractor and as soon as we can give them the contact information for the person
doing the inspection they will schedule the panel fabrication. They said the timeframe would be within a
few days. If you have any questions please let me know.
Thanks,
<image009.jpg>
Darryl Zbranek
Chief Construction Inspector
City of Coppell, TX
(469)507-9095 (cell)
www.coppelltx.gov
From: Joel Peters \[mailto:JDPeters@kleinfelder.com\]
Sent: Wednesday, May 16, 2018 3:37 PM
To: Darryl Zbranek <dzbranek@coppelltx.gov>
Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>; Marcus Marion
<MMarion@coppelltx.gov>
Subject: RE: Freeport Parkway Reconstruction
Darryl,
Thanks for your request and detail information for the proposed fabrication inspection. We would be
able to provide an inspector out of our Austin, TX office at the following estimated rates. I have outlined
some pricing based on the site visit NOT including test cylinders and WITH concrete test cylinders
included; however, Bexar Concrete will likely be able to provide you with QC documentation of concrete
strengths during production.
-Senior Inspector: Estimated 10 hrs @ $70/hr = $700 (includes Round-trip travel (estimated @ 3 hrs) and
about 4-5 hours onsite)
-Travel: Estimated $100..actual mileage charge would be applied at current IRS mileage rates
-Project Management for coordination and reporting: 1 hr @ $160/hr = $160
ESTIMATED TOTAL: $960
If compressive strength cylinders are desired to be cast on production concrete, the following would
apply:
-Additional 2 hrs of Senior Inspector during site visit: $70/hr = $140
-Cylinders @ 1 set of 6 samples: 6 cylinders @ $30/ea = $180
2
-Additional 4 hrs to retrieve samples cast on previous day: 4 hrs @ $70/hr = $280
- Estimated $100..actual mileage charge would be applied at current IRS mileage rates
ESTIMATED ADDITIONAL: $600
We trust that this information is sufficient for your review at this time. If you have any questions, or
need additional information, please contact me.
Thanks for the continued opportunities to partner with the City.
Joel
Joel Peters, PE
Project Manager
7805 Mesquite Bend Dr, Suite 100
Irving, TX 75063
o| 972.868.5900
d| 972.868.5916
m| 214.876.5559
f| 972.409.0008
<image002.png>
<image003.jpg>
<image004.jpg><image005.jpg><image006.jpg><image007.jpg><image008.jpg>
From: Darryl Zbranek \[mailto:dzbranek@coppelltx.gov\]
Sent: Wednesday, May 16, 2018 10:16 AM
To: Joel Peters <JDPeters@kleinfelder.com>
Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>; Marcus Marion
<MMarion@coppelltx.gov>
Subject: Freeport Parkway Reconstruction
External Email.
Joel, could you please send me a price for a one trip inspection to Bexar Concrete in San Antonio for
production of the concrete bridge deck panels. Pricing to include trip cost, inspection cost, and
inspection report. If you have any questions please let me know.
Thanks,
<image009.jpg>
Darryl Zbranek
Chief Construction Inspector
City of Coppell, TX
(469)507-9095 (cell)
www.coppelltx.gov