ST1501A-CS180518 Priscilla Martinez From:Marcus Marion Sent:Friday, May 18, 2018 7:19 AM To:Priscilla Martinez Subject:Freeport Parkway Reconstruction - Bridge Panel Inspections This is a correspondence for the bridge panel inspections From: Darryl Zbranek Sent: Thursday, May 17, 2018 1:19 PM To: Joel Peters <JDPeters@kleinfelder.com> Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>; Marcus Marion <MMarion@coppelltx.gov>; Amanda Chandler <AChandler@kleinfelder.com>; Kyle Woodard <kwoodard@kleinfelder.com> Subject: Re: Freeport Parkway Reconstruction See below, please keep us informed when this happens. Thanks, DZ Sent from my iPhone On May 17, 2018, at 12:02 PM, Joel Peters <JDPeters@kleinfelder.com> wrote: Darryl, The contractor may coordinate the inspection event with our dispatcher (Amanda Chandler) in our Austin office. They can reach her by calling 512-926-6650. We will likely be utilizing Kyle Woodard, one of our senior inspectors to cover the activities. Please let me know if there are any questions or if you need additional information. Thank you. Joel Peters, PE Project Manager 7805 Mesquite Bend Dr, Suite 100 Irving, TX 75063 o| 972.868.5900 d| 972.868.5916 m| 214.876.5559 f| 972.409.0008 <image002.png> <image003.jpg> <image004.jpg><image005.jpg><image006.jpg><image007.jpg><image008.jpg> 1 From: Darryl Zbranek \[mailto:dzbranek@coppelltx.gov\] Sent: Thursday, May 17, 2018 9:29 AM To: Joel Peters <JDPeters@kleinfelder.com> Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>; Marcus Marion <MMarion@coppelltx.gov> Subject: RE: Freeport Parkway Reconstruction External Email. Joel, I have talked to our contractor and as soon as we can give them the contact information for the person doing the inspection they will schedule the panel fabrication. They said the timeframe would be within a few days. If you have any questions please let me know. Thanks, <image009.jpg> Darryl Zbranek Chief Construction Inspector City of Coppell, TX (469)507-9095 (cell) www.coppelltx.gov From: Joel Peters \[mailto:JDPeters@kleinfelder.com\] Sent: Wednesday, May 16, 2018 3:37 PM To: Darryl Zbranek <dzbranek@coppelltx.gov> Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>; Marcus Marion <MMarion@coppelltx.gov> Subject: RE: Freeport Parkway Reconstruction Darryl, Thanks for your request and detail information for the proposed fabrication inspection. We would be able to provide an inspector out of our Austin, TX office at the following estimated rates. I have outlined some pricing based on the site visit NOT including test cylinders and WITH concrete test cylinders included; however, Bexar Concrete will likely be able to provide you with QC documentation of concrete strengths during production. -Senior Inspector: Estimated 10 hrs @ $70/hr = $700 (includes Round-trip travel (estimated @ 3 hrs) and about 4-5 hours onsite) -Travel: Estimated $100..actual mileage charge would be applied at current IRS mileage rates -Project Management for coordination and reporting: 1 hr @ $160/hr = $160 ESTIMATED TOTAL: $960 If compressive strength cylinders are desired to be cast on production concrete, the following would apply: -Additional 2 hrs of Senior Inspector during site visit: $70/hr = $140 -Cylinders @ 1 set of 6 samples: 6 cylinders @ $30/ea = $180 2 -Additional 4 hrs to retrieve samples cast on previous day: 4 hrs @ $70/hr = $280 - Estimated $100..actual mileage charge would be applied at current IRS mileage rates ESTIMATED ADDITIONAL: $600 We trust that this information is sufficient for your review at this time. If you have any questions, or need additional information, please contact me. Thanks for the continued opportunities to partner with the City. Joel Joel Peters, PE Project Manager 7805 Mesquite Bend Dr, Suite 100 Irving, TX 75063 o| 972.868.5900 d| 972.868.5916 m| 214.876.5559 f| 972.409.0008 <image002.png> <image003.jpg> <image004.jpg><image005.jpg><image006.jpg><image007.jpg><image008.jpg> From: Darryl Zbranek \[mailto:dzbranek@coppelltx.gov\] Sent: Wednesday, May 16, 2018 10:16 AM To: Joel Peters <JDPeters@kleinfelder.com> Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>; Marcus Marion <MMarion@coppelltx.gov> Subject: Freeport Parkway Reconstruction External Email. Joel, could you please send me a price for a one trip inspection to Bexar Concrete in San Antonio for production of the concrete bridge deck panels. Pricing to include trip cost, inspection cost, and inspection report. If you have any questions please let me know. Thanks, <image009.jpg> Darryl Zbranek Chief Construction Inspector City of Coppell, TX (469)507-9095 (cell) www.coppelltx.gov 3 To stop receiving messages from FreeportProjectST1501 group, stop following it. 4