Loading...
Gateway BP(1.4)-LR180419 (5)Report Number: Service Date: Report Date: Task: Client Coppell, TX 75019 770 Gateway Blvd Haverty's Warehouse ExpansionHaverty Furniture Co Inc Attn: Glenn Boone 780 Johnson Ferry Rd NE Ste 800 Atlanta, GA 30342 214-630-1010 Reg No: F-3272 Dallas, TX 75247-4547 8901 Carpenter Fwy, Ste 100 94171346.0199 04/19/18 05/21/18 Revision 1 - 28-day results CONCRETE COMPRESSIVE STRENGTH TEST REPORT Project Project Number: 94171346 Specified Strength:28 days Mix ID: Supplier: Batch Time: Truck No.: R3136027 Martin Marietta Material Information 0233 8810 Plant: Ticket No.: 131 4643445 Field Test Data Test Air Content (%): Result Specification 4 1/2 3 - 5 4.1 3 - 6 61 54 146.8 3,600 Slump (in): psi @ Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Sample Information Sample Date: Sampled By: Weather Conditions: Sample Time:04/19/18 0315 Chris Jacobson Clear 10 / 310 10 0 0 See Placement LocationSample Location: Placement Method:Pump Water Added Before (gal): Water Added After (gal): Accumulative Yards:Batch Size (cy): Pavement, see attached sketchPlacement Location: Laboratory Test Data Set Avg Diam.Area DateDate Test Age at Load Maximum Strength Compressive Fracture No.ID Specimen Received Tested (days)Type(in)(sq in)(lbs)(psi) Tested By 1 1 4.00 12.57 04/26/18 7 54,115 1 4,310 ZHG 1 2 4.00 12.57 05/17/18 28 72,625 2 5,780 ZHG 1 3 4.00 12.57 05/17/18 28 68,605 2 5,460 ZHG 1 4 4.00 12.57 05/17/18 28 72,655 2 5,780 ZHG Average (28 days) 5,670 1 5 4.00 12.57 06/14/18 56 Initial Cure:Final Cure:Outside Plastic Lids Moist Room Comments:Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Services: Reported To: Contractor: Report Distribution: (1) Haverty Furniture Co Inc, Glenn Boone (1) City of Coppell TX, Marcus Marion (1) Kajima Building & Design Group Inc., Craig Farwick (1) Kajima Building & Design Group Inc., Juan Hernandez (1) Kent Companies, George Sellers (1) Macgregor Assoc Architects, Muhammed Dikko ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231Test Methods: Terracon Rep.: Chris Jacobson The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 4CR0001, 11-16-12, Rev.6 Report Number: Service Date: Report Date: Task: Client Coppell, TX 75019 770 Gateway Blvd Haverty's Warehouse ExpansionHaverty Furniture Co Inc Attn: Glenn Boone 780 Johnson Ferry Rd NE Ste 800 Atlanta, GA 30342 214-630-1010 Reg No: F-3272 Dallas, TX 75247-4547 8901 Carpenter Fwy, Ste 100 94171346.0199 04/19/18 05/21/18 Revision 1 - 28-day results CONCRETE COMPRESSIVE STRENGTH TEST REPORT Project Project Number: 94171346 Specified Strength:28 days Mix ID: Supplier: Batch Time: Truck No.: R3136027 Martin Marietta Material Information 0432 3851 Plant: Ticket No.: 131 4643766 Field Test Data Test Air Content (%): Result Specification 5 3 - 5 4.4 3 - 6 62 55 147.1 3,600 Slump (in): psi @ Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Sample Information Sample Date: Sampled By: Weather Conditions: Sample Time:04/19/18 0515 Chris Jacobson Clear 120 / 310 10 20 See Placement LocationSample Location: Placement Method:Pump Water Added Before (gal): Water Added After (gal): Accumulative Yards:Batch Size (cy): Pavement, see attached sketchPlacement Location: Laboratory Test Data Set Avg Diam.Area DateDate Test Age at Load Maximum Strength Compressive Fracture No.ID Specimen Received Tested (days)Type(in)(sq in)(lbs)(psi) Tested By 2 1 4.00 12.57 04/26/18 7 60,810 1 4,840 ZHG 2 2 4.00 12.57 05/17/18 28 70,430 1 5,600 ZHG 2 3 4.00 12.57 05/17/18 28 74,355 2 5,920 ZHG 2 4 4.00 12.57 05/17/18 28 66,215 3 5,270 ZHG Average (28 days) 5,600 2 5 4.00 12.57 06/14/18 56 Initial Cure:Final Cure:Outside Plastic Lids Moist Room Comments:Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Services: Reported To: Contractor: Report Distribution: (1) Haverty Furniture Co Inc, Glenn Boone (1) City of Coppell TX, Marcus Marion (1) Kajima Building & Design Group Inc., Craig Farwick (1) Kajima Building & Design Group Inc., Juan Hernandez (1) Kent Companies, George Sellers (1) Macgregor Assoc Architects, Muhammed Dikko ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231Test Methods: Terracon Rep.: Chris Jacobson The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 2 of 4CR0001, 11-16-12, Rev.6 Report Number: Service Date: Report Date: Task: Client Coppell, TX 75019 770 Gateway Blvd Haverty's Warehouse ExpansionHaverty Furniture Co Inc Attn: Glenn Boone 780 Johnson Ferry Rd NE Ste 800 Atlanta, GA 30342 214-630-1010 Reg No: F-3272 Dallas, TX 75247-4547 8901 Carpenter Fwy, Ste 100 94171346.0199 04/19/18 05/21/18 Revision 1 - 28-day results CONCRETE COMPRESSIVE STRENGTH TEST REPORT Project Project Number: 94171346 Specified Strength:28 days Mix ID: Supplier: Batch Time: Truck No.: R3136027 Martin Marietta Material Information 0522 5005 Plant: Ticket No.: 131 4643970 Field Test Data Test Air Content (%): Result Specification 5 3 - 5 4.5 3 - 6 61 56 147.3 3,600 Slump (in): psi @ Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Sample Information Sample Date: Sampled By: Weather Conditions: Sample Time:04/19/18 0635 Chris Jacobson Clear 210 / 310 10 15 See Placement LocationSample Location: Placement Method:Pump Water Added Before (gal): Water Added After (gal): Accumulative Yards:Batch Size (cy): Pavement, see attached sketchPlacement Location: Laboratory Test Data Set Avg Diam.Area DateDate Test Age at Load Maximum Strength Compressive Fracture No.ID Specimen Received Tested (days)Type(in)(sq in)(lbs)(psi) Tested By 3 1 4.00 12.57 04/26/18 7 53,865 2 4,290 ZHG 3 2 4.00 12.57 05/17/18 28 68,540 1 5,450 ZHG 3 3 4.00 12.57 05/17/18 28 74,055 2 5,890 ZHG 3 4 4.00 12.57 05/17/18 28 65,905 1 5,240 ZHG Average (28 days) 5,530 3 5 4.00 12.57 06/14/18 56 Initial Cure:Final Cure:Outside Plastic Lids Moist Room Comments:Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Services: Reported To: Contractor: Report Distribution: (1) Haverty Furniture Co Inc, Glenn Boone (1) City of Coppell TX, Marcus Marion (1) Kajima Building & Design Group Inc., Craig Farwick (1) Kajima Building & Design Group Inc., Juan Hernandez (1) Kent Companies, George Sellers (1) Macgregor Assoc Architects, Muhammed Dikko ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231Test Methods: Terracon Rep.: Chris Jacobson The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 3 of 4CR0001, 11-16-12, Rev.6 Report Number: Service Date: Report Date: Task: Client Coppell, TX 75019 770 Gateway Blvd Haverty's Warehouse ExpansionHaverty Furniture Co Inc Attn: Glenn Boone 780 Johnson Ferry Rd NE Ste 800 Atlanta, GA 30342 214-630-1010 Reg No: F-3272 Dallas, TX 75247-4547 8901 Carpenter Fwy, Ste 100 94171346.0199 04/19/18 05/21/18 Revision 1 - 28-day results CONCRETE COMPRESSIVE STRENGTH TEST REPORT Project Project Number: 94171346 Specified Strength:28 days Mix ID: Supplier: Batch Time: Truck No.: R3136027 Martin Marietta Material Information 0723 7871 Plant: Ticket No.: 131 4644545 Field Test Data Test Air Content (%): Result Specification 5 3 - 5 4.4 3 - 6 66 59 147.0 3,600 Slump (in): psi @ Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Sample Information Sample Date: Sampled By: Weather Conditions: Sample Time:04/19/18 0815 Chris Jacobson Clear 310 / 310 10 20 See Placement LocationSample Location: Placement Method:Pump Water Added Before (gal): Water Added After (gal): Accumulative Yards:Batch Size (cy): Pavement, see attached sketchPlacement Location: Laboratory Test Data Set Avg Diam.Area DateDate Test Age at Load Maximum Strength Compressive Fracture No.ID Specimen Received Tested (days)Type(in)(sq in)(lbs)(psi) Tested By 4 1 4.00 12.57 04/26/18 7 49,320 1 3,920 ZHG 4 2 4.00 12.57 05/17/18 28 65,250 1 5,190 ZHG 4 3 4.00 12.57 05/17/18 28 56,120 2 4,470 ZHG 4 4 4.00 12.57 05/17/18 28 61,440 5 4,890 ZHG Average (28 days) 4,850 4 5 4.00 12.57 06/14/18 56 Initial Cure:Final Cure:Outside Plastic Lids Moist Room Comments:Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Services: Reported To: Contractor: Report Distribution: (1) Haverty Furniture Co Inc, Glenn Boone (1) City of Coppell TX, Marcus Marion (1) Kajima Building & Design Group Inc., Craig Farwick (1) Kajima Building & Design Group Inc., Juan Hernandez (1) Kent Companies, George Sellers (1) Macgregor Assoc Architects, Muhammed Dikko Joel Warriner, P.E. Senior Project Manager Reviewed By: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231Test Methods: Terracon Rep.: Chris Jacobson The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 4 of 4CR0001, 11-16-12, Rev.6