Gateway BP(1.4)-LR180511MASONRY OBSERVATIONS REPORT
Report Number:94171346.0240
Service Date:05/11/18 8901 Carpenter Fwy, Ste 100
Report Date:05/21/18 Dallas, TX 75247-4547
214-630-1010 Reg No: F-3272
Client Project
Haverty Furniture Co Inc Haverty's Warehouse Expansion
Attn: Glenn Boone 770 Gateway Blvd
780 Johnson Ferry Rd NE Ste 800 Coppell, TX 75019
Atlanta, GA 30342
Project Number: 94171346
Services: Masonry observation.
Terracon Rep.: Scooter Day
Reported To:
Contractor:
Report Distribution:
(1) Haverty Furniture Co Inc, Glenn
Boone
(1) City of Coppell TX, Marcus Marion
(1) Kajima Building & Design Group Inc., Craig Farwick (1) Kajima Building & Design Group Inc., Juan Hernandez Reviewed By:____________________________________
(1) Kent Companies, George Sellers (1) Macgregor Assoc Architects,
Muhammed Dikko Joel Warriner, P.E.
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
AF0006, 10-16-13, Rev.3 Page 1 of 1
Services Requested By:Juan Hermandez w/ KBD Group
Masonry Contractor:C & B Masonry
Location of Observed Activity:G-F/8, Courses 25-30, G/8-10, H.9-G/8-8.2, Courses 7-12, h.9-G/8.8.2, Courses 13-15,
G.3/8-10, Courses 1-6, D-C.8/8.8 Courses 1-6, C.8/8.8-10, Courses 1-6
Masonry Type:CMU
Block Size:8-inch
Block Type:Normal
Activities Observed:Masonry, mortar, grout and reinforcing steel
Ambient Temperature:The temperature during today's masonry activities was observed to be 85 degrees
Fahrenheit. The ambient temperature over the last 24 hours ranged from 70 to 88 degrees
Fahrenheit.
Mortar:Type N mortar used in the masonry construction was observed to have been mixed in
accordance with project specifications.
Grout:Approximately 6 cubic yards of 3000-psi grout supplied by Contractor (Mix ID: Spec
Mix) was placed using low lift methods
Weather Protection:Weather protection consisted of Working inside warehouse.
Drawings Referenced:S-203/Slab Foundation, S-400/General Notes
Summary:Today's masonry activities were observed to have been completed in general accordance
with project documents. Results were reported to Juan Hernandez w/ KBD at the
completion of today's activities.
Additional Comments:Set Rebar with Hilti Hit-R-500 Epoxy on Row, G.3/8-10, D-C.8/8.8, C.8/8.8, 10,
Complies with prints on Rebar & Epoxy Application