RFQ for Starleaf Pump StationRFQ for Starleaf Pump Station PHASE 1- Evaluate existing master plan Make recommendations on – storage capacity, type/size of pumps, pump station/tanks layout, RFC size and layout, GSR Size/layout, and overall operational scheme(s) incorporating both pump stations Station should be sized to accommodate at least 25 MGD and 6 MG ground storage. PHASE 2- Pump Station, RFC and GSR design SCADA system design incorporating two stations Phase 3- Pump Station, RFC and GSR construction Phase 4- Pump Station Operation- Pump station must work in tandem with V.P. Consultant will need to make recommendations on system operations and provide any necessary training to operators.