RFQ for Starleaf Pump StationRFQ for Starleaf Pump Station
PHASE 1-
Evaluate existing master plan
Make recommendations on – storage capacity, type/size of pumps, pump station/tanks layout, RFC size and layout, GSR Size/layout, and overall operational scheme(s) incorporating both
pump stations
Station should be sized to accommodate at least 25 MGD and 6 MG ground storage.
PHASE 2-
Pump Station, RFC and GSR design
SCADA system design incorporating two stations
Phase 3-
Pump Station, RFC and GSR construction
Phase 4-
Pump Station Operation- Pump station must work in tandem with V.P. Consultant will need to make recommendations on system operations and provide any necessary training to operators.