Loading...
ST1501A-CS180615 Priscilla Martinez From:Marcus Marion Sent:Friday, June 15, 2018 1:34 PM To:Priscilla Martinez Subject:Freeport Reconstruction - Subgrade Inspection This is a correspondence about the subgrade on Freeport PKWY From: Kent Collins Sent: Friday, June 15, 2018 7:53 AM To: Jay Volk <jay@jvolkconsulting.com>; Joel Peters <JDPeters@kleinfelder.com>; FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>; Claudio Segovia <claudio@jvolkconsulting.com> Subject: FW: Freeport Reconstruction Subgrade Inspection Jay, to echo Eric’s sentiment, in my mind the questions are: how do we control the subgrade moisture after Texas Sterling is complete with the project so the roadway does not fail prematurely. And, do we need to consider an alternate pavement section to stabilize the subgrade knowing that the moisture content of the subgrade may be an issue. I still like the benefits of the asphalt base, but do we need to consider some depth of subgrade stabilization (for example, do we go to lime treated subgrade with a 1”-2” asphalt cap)? Please review and let us know. This is obviously a critical issue. Thanks, Kent From: Eric Giebelhaus \[mailto:Eric.Giebelhaus@strlco.com\] Sent: Thursday, June 14, 2018 11:11 AM To: Joel Peters <JDPeters@kleinfelder.com>; Darryl Zbranek <dzbranek@coppelltx.gov>; Jay Volk <jay@jvolkconsulting.com>; Kent Collins <KCollins@coppelltx.gov>; FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov> Cc: Jimmy Reed <Jimmy.Reed@strlco.com>; Joe Soto <Joe.Soto@strlco.com>; Marcus Marion <MMarion@coppelltx.gov>; Jamie Brierton <JBrierton@coppelltx.gov>; Rick Hammerberg <rhammerberg@kleinfelder.com> Subject: RE: Freeport Reconstruction Subgrade Inspection This is not about compaction but the long term viability of building a road on this kind of material. We can get compaction, what we can’t do is control the moisture content after the road is built. The high moisture content under the existing roadway will become the condition of the subgrade under the new pavement after the project is completed. This subgrade isn’t solid and will continue to pump causing damage to the pavement. Thanks, Eric Giebelhaus Project Manager– North Texas Division Texas Sterling Construction Co. | 1441 Airport Freeway Suite 350, Euless, Texas 76040 | | 469.346.8085 Cell | 1 From: Joel Peters <JDPeters@kleinfelder.com> Sent: Thursday, June 14, 2018 11:07 AM To: Darryl Zbranek <dzbranek@coppelltx.gov>; Jay Volk <jay@jvolkconsulting.com>; Kent Collins <KCollins@coppelltx.gov>; FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov> Cc: Jimmy Reed <Jimmy.Reed@strlco.com>; Eric Giebelhaus <Eric.Giebelhaus@strlco.com>; Joe Soto <Joe.Soto@strlco.com>; Marcus Marion <MMarion@coppelltx.gov>; Jamie Brierton <JBrierton@coppelltx.gov>; Rick Hammerberg <rhammerberg@kleinfelder.com> Subject: RE: Freeport Reconstruction Subgrade Inspection Thank you, Darryl…you beat me to it. Yes, the moistures are about 7%-14% above optimum moisture for the proctor samples we have. Recent density tests that we have taken on waterline backfill to depths of -3 ft have varied in the 0%-4% above optimum range, and able to achieve 95% compaction or better. For this type of clay, placement and compaction in this moisture range is ideal, whereas, higher moisture contents elevated up to +5 to 6% or more over optimum moisture may make it more difficult to attain proper compaction and/or present possible constructability issues. Please let us know if there any questions regarding this information, at this time. Thank you. Joel Peters, PE Project Manager 7805 Mesquite Bend Dr, Suite 100 Irving, TX 75063 o| 972.868.5900 d| 972.868.5916 m| 214.876.5559 f| 972.409.0008 2 From: Darryl Zbranek \[mailto:dzbranek@coppelltx.gov\] Sent: Thursday, June 14, 2018 10:37 AM To: Jay Volk <jay@jvolkconsulting.com>; Joel Peters <JDPeters@kleinfelder.com>; Kent Collins <KCollins@coppelltx.gov>; FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov> Cc: Jimmy Reed <Jimmy.Reed@strlco.com>; Eric Giebelhaus <Eric.Giebelhaus@strlco.com>; Joe Soto <Joe.Soto@strlco.com>; Marcus Marion <MMarion@coppelltx.gov>; Jamie Brierton <JBrierton@coppelltx.gov> Subject: RE: Freeport Reconstruction Subgrade Inspection External Email. Jay, see the attached test reports. Moisture of the existing material appears to be higher than optimum. Darryl Zbranek Chief Construction Inspector City of Coppell, TX (469)507-9095 (cell) www.coppelltx.gov From: Jay Volk \[mailto:jay@jvolkconsulting.com\] Sent: Thursday, June 14, 2018 9:39 AM To: Darryl Zbranek <dzbranek@coppelltx.gov>; Joel Peters <JDPeters@kleinfelder.com>; Kent Collins <KCollins@coppelltx.gov>; FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov> Cc: Jimmy Reed <Jimmy.Reed@strlco.com>; Eric Giebelhaus <Eric.Giebelhaus@strlco.com>; Joe Soto <Joe.Soto@strlco.com>; Marcus Marion <MMarion@coppelltx.gov>; Jamie Brierton <JBrierton@coppelltx.gov> Subject: RE: Freeport Reconstruction Subgrade Inspection Darryl, do we know how these figures compare with the optimum moisture content for the soils? Jay Volk | President 830 Central Parkway East | Suite 300 | Plano | TX 75074 972-201-3101 (office) 972-201-3101 (direct) 972-965-2864 (mobile) 972-201-3099 (fax) www.jvolkconsulting.com From: Darryl Zbranek <dzbranek@coppelltx.gov> Sent: Wednesday, June 13, 2018 9:46 AM To: Joel Peters <JDPeters@kleinfelder.com>; Jay Volk <jay@jvolkconsulting.com>; Kent Collins <KCollins@coppelltx.gov>; FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov> Cc: Jimmy Reed <Jimmy.Reed@strlco.com>; Eric Giebelhaus <Eric.Giebelhaus@strlco.com>; Joe Soto <Joe.Soto@strlco.com>; Marcus Marion <MMarion@coppelltx.gov>; Jamie Brierton <JBrierton@coppelltx.gov> Subject: RE: Freeport Reconstruction Subgrade Inspection 3 All, I received a hard copy of the subgrade moisture test results from Kleinfelder taken on 6/7/2018 after our site meeting held on 6/6/2018. Please review and respond with any comments, concerns, or questions. Thanks, Darryl Zbranek Chief Construction Inspector City of Coppell, TX (469)507-9095 (cell) www.coppelltx.gov -----Original Appointment----- From: Darryl Zbranek Sent: Friday, June 1, 2018 2:48 PM To: Jimmy Reed; Eric Giebelhaus; Joe Soto; Joel Peters; Jamie Brierton; Jay Volk; Marcus Marion; Kent Collins; FreeportProjectST1501 Subject: Freeport Reconstruction Subgrade Inspection When: Monday, June 4, 2018 2:00 PM-4:00 PM (UTC-06:00) Central Time (US & Canada). Where: Intersection of Freport and Fritz Texas Sterling has concerns of the moisture content of the subgrade in the Northbound lanes of Freeport. Meeting on site to discuss the issue. To stop receiving messages from FreeportProjectST1501 group, stop following it. To stop receiving messages from FreeportProjectST1501 group, stop following it. 4