Loading...
ST1501A-CS180615 (3) Priscilla Martinez From:Marcus Marion Sent:Monday, June 18, 2018 7:26 AM To:Priscilla Martinez Subject:Freeport - Underdrain This is a correspondence for Freeport PKWY From: Eric Giebelhaus \[mailto:Eric.Giebelhaus@strlco.com\] Sent: Friday, June 15, 2018 1:40 PM To: Darryl Zbranek <dzbranek@coppelltx.gov> Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov> Subject: RE: Freeport - Underdrain I have the vendor working on pricing for the drain material. From: Darryl Zbranek <dzbranek@coppelltx.gov> Sent: Friday, June 15, 2018 1:29 PM To: Eric Giebelhaus <Eric.Giebelhaus@strlco.com> Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov> Subject: FW: Freeport - Underdrain Eric, please see the attachments. Please provide pricing using the ADS Advanedge 12” piping and the 18” piping in lieu of the 4” perforated piping and gravel bedding. If you have any questions please call. Thanks, Darryl Zbranek Chief Construction Inspector City of Coppell, TX (469)507-9095 (cell) www.coppelltx.gov From: Kent Collins Sent: Friday, June 15, 2018 11:51 AM To: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov> Subject: FW: Freeport - Underdrain Please review and weigh in. Seems like a pretty clean solution. Thanks, Kent From: Jay Volk \[mailto:jay@jvolkconsulting.com\] Sent: Friday, June 15, 2018 11:34 AM 1 To: Kent Collins <KCollins@coppelltx.gov>; Claudio Segovia <claudio@jvolkconsulting.com> Subject: RE: Freeport - Underdrain Kent, Please see the attached. I think this is worth considering. The drainage capacity is greater than 4” perforated pipe and the vertical profile would do a better job of intercepting lateral movement of water. It comes in 12” and 18” sizes. We could ask TSC to price it both ways. Jay Volk | President 830 Central Parkway East | Suite 300 | Plano | TX 75074 972-201-3101 (office) 972-201-3101 (direct) 972-965-2864 (mobile) 972-201-3099 (fax) www.jvolkconsulting.com From: Kent Collins <KCollins@coppelltx.gov> Sent: Friday, June 15, 2018 10:28 AM To: Jay Volk <jay@jvolkconsulting.com>; Claudio Segovia <claudio@jvolkconsulting.com> Subject: FW: Freeport - Underdrain Thanks, Kent From: Eric Giebelhaus \[mailto:Eric.Giebelhaus@strlco.com\] Sent: Thursday, June 14, 2018 12:19 PM To: Darryl Zbranek <dzbranek@coppelltx.gov> Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>; Marcus Marion <MMarion@coppelltx.gov>; Jamie Brierton <JBrierton@coppelltx.gov>; Jimmy Reed <Jimmy.Reed@strlco.com>; Joe Soto <Joe.Soto@strlco.com> Subject: Freeport - Underdrain Darryl, Attached is a pricing proposal to add 4” underdrain at the edge of the HMAC underlay. This is similar to the Alternate B typical in the proposal. The main difference is that we propose to use pre-wrapped underdrain pipe instead of wrapping the entire rock backfill zone. Please take a look and let me know if you are interested in this. Thanks, Eric Giebelhaus Project Manager– North Texas Division Texas Sterling Construction Co. 2 | 1441 Airport Freeway Suite 350, Euless, Texas 76040 | | 469.346.8085 Cell | To stop receiving messages from FreeportProjectST1501 group, stop following it. 3