Loading...
ST1501A-CS180703 Priscilla Martinez From:Marcus Marion Sent:Tuesday, July 03, 2018 8:38 AM To:Priscilla Martinez Subject:Freeport PKWY - Utility Conflict with Bridge Response Letter 062918.pdf This is a correspondence about the utility conflict at the bridge crossing From: Eric Giebelhaus \[mailto:Eric.Giebelhaus@strlco.com\] Sent: Monday, July 2, 2018 10:33 AM To: Jamie Brierton <JBrierton@coppelltx.gov>; Jimmy Reed <Jimmy.Reed@strlco.com>; Joe Soto <Joe.Soto@strlco.com> Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>; Michael Duffy <Michael.Duffy@strlco.com> Subject: RE: Freeport Utility Conflict with Bridge Response Letter 062918.pdf Jamie, That is great. From the offset to the old bridge the Zayo located marked the Frontier line as his own. The conflicts from their current marks are at all 4 bent locations. The Differences from these pictures to what we are building at a glance are:  Picture 3 shows the south end of the bridge. His line is marked 12’ to 15’ east of the existing structure. At this location our outside drill shaft is 1’ east of the existing wingwall.  Picture 2 shows through the middle of the creek area. The proposed bent 2 outside drill shaft at this location is 1’ east of the existing bridge rail. Bent 3 is around 10’ east of the existing bridge but their current marks show they should be clear of us a couple of feet. Again the photos show evidence that what they originally marked and what they are marking now are not the same th location. Their May 15 marks are the location Frontier now has their facilities marked. Thanks, Eric Giebelhaus Project Manager– North Texas Division Texas Sterling Construction Co. | 1441 Airport Freeway Suite 350, Euless, Texas 76040 | | 469.346.8085 Cell | From: Jamie Brierton <JBrierton@coppelltx.gov> Sent: Monday, July 02, 2018 10:15 AM To: Eric Giebelhaus <Eric.Giebelhaus@strlco.com>; Jimmy Reed <Jimmy.Reed@strlco.com>; Joe Soto <Joe.Soto@strlco.com> 1 Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>; Michael Duffy <Michael.Duffy@strlco.com> Subject: RE: Freeport Utility Conflict with Bridge Response Letter 062918.pdf Eric- Thanks. Just to clarify the images were from the locater who locates Level 3 / Zayo. These are his pictures of when he th located the respective lines. Pictures 2 and 3 were taken May 15 and are the ones that are relevant. Jamie From: Eric Giebelhaus \[mailto:Eric.Giebelhaus@strlco.com\] Sent: Monday, July 02, 2018 8:45 AM To: Jamie Brierton <JBrierton@coppelltx.gov>; Jimmy Reed <Jimmy.Reed@strlco.com>; Joe Soto <Joe.Soto@strlco.com> Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>; Michael Duffy <Michael.Duffy@strlco.com> Subject: RE: Freeport Utility Conflict with Bridge Response Letter 062918.pdf Jamie, We will be sending a formal response but until then some comments on the pictures: Picture 1 – West side of bridge Picture 2 – Frontier – We can get around this Picture 3 – Frontier Picture 4 – Nothing is marked down towards the creek, we found these at the marked locations Pictures 5 and 6 – Zayo conflict, not marked until we started work on drill shafts According to NTCOG 107.23.3 Conditions for Increases to Work or Payment, we could not determine utility locations prior to the time of bid and these are in direct conflict with the work requiring a change in the work to be constructed. Our notice is timely due to the fact that the utility had never previously located their facility. In addition to this 107.23.4 Utility Coordination and Protection states “ It is the intention of the Owner that all known conflicts between utility-owned facilities and the proposed construction will be cleared prior to the issuance of the work order.” What we are now finding is that these were known conflicts. Thanks, Eric Giebelhaus Project Manager– North Texas Division Texas Sterling Construction Co. | 1441 Airport Freeway Suite 350, Euless, Texas 76040 | | 469.346.8085 Cell | From: Jamie Brierton <JBrierton@coppelltx.gov> Sent: Monday, July 02, 2018 8:27 AM To: Eric Giebelhaus <Eric.Giebelhaus@strlco.com>; Jimmy Reed <Jimmy.Reed@strlco.com>; Joe Soto 2 <Joe.Soto@strlco.com> Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov> Subject: Freeport Utility Conflict with Bridge Response Letter 062918.pdf Eric- Please see attached response. If you have any questions or concerns, we can discuss during the next meeting. Thanks Jamie Brierton Project Manager Engineering & Public Works City of Coppell, TX 972-462-5151 (office) www.coppelltx.gov To stop receiving messages from FreeportProjectST1501 group, stop following it. 3