ST1501A-CS180625 (4) City of Coppell Project No. ST15-01A Freeport Parkway Baseline Primavera P6 Schedule Narrative As of Data Date: June 25, 2018 Checkdatadate. ShouldbeJune. Belownotes activitiesadded. Notethe10daydelay Thiswasacriticalitemto becompleted. Alsonotedinweekly constructionmeeting 1723 - Freeport Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendar20182019 DurationDuration rMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOct 350299009-Apr-18 18-Oct-1917 1723 1723 - Freeport- A A1000Project Start0009-Apr-187 Dayroject Start A1320Duration530478009-Apr-1818-Oct-197 Day A1530Bridge ROW Issue0009-Apr-1825-Apr-18 7 Day A1600Project Time Charges523478009-Apr-1818-Oct-197 Day A1330Milestone 1190148626-Apr-1821-Nov-187 Day A1670Start Time Charges0026-Apr-187 DayStart Time Charges A1340Milestone 212512515922-Nov-1827-Mar-197 Day A1350Milestone 31451451329-Mar-1921-Aug-197 Day A1020Project Finish00018-Oct-197 DayP 57133309-Apr-1827-Jun-185 DayStage 1 StagStage 1e 9009-Apr-1827-Apr-18 5 DayWater WaterWater A165Sawcut for Removals - Water Line & Detour3009-Apr-1811-Apr-18 5 Day Notethenewfinish A155Water Line 45+80 to 48+256012-Apr-1817-Apr-18 5 Day datewithdelay A138Crossing @ 44+703018-Apr-1818-Apr-18 5 Day A137Crossing @36+164019-Apr-1825-Apr-18 5 Day A136Crossing @ 28+263026-Apr-1827-Apr-18 5 Day 57133312-Apr-1827-Jun-185 DayTCP Setup Stage 2 TCP TCP Setup Stage 2S A166Sawcut for Removals - Bridge Sidewalk1012-Apr-1820-Apr-18 5 Day A105Remove Sidewalk SB5023-Apr-1815-May-185 Day A260Railroad Crossing Arm Delay15026-Apr-1825-Jun-18 5 Day A107Remove Bridge Median1015-May-1815-May-185 Day A109Removals - Detours1016-May-1816-May-185 Day A110Install Stage Detours3016-May-1818-May-185 Day Durationshavechangedherethat A108Set & Pin PCTB - Demo Edge2021-May-1821-May-185 Day isimpactingthelongest/critical A106Set PCTB - Center Stripe111827-Jun-1827-Jun-185 DaySet PCTB - Center Stripe path.Whatistheissue? A161Railroad Install Temp Crossing Arms00327-Jun-185 DayRailroad Install Temp Crossing Arms 001927-Jun-1827-Jun-185 DayStorm Drain StorStorm Drainm A139Storm Drain Rehab @ 17+23001927-Jun-1827-Jun-185 DayStorm Drain Rehab @ 17+23 1189420617-May-1821-Nov-18Stage 2 - NB Dividend to Bethel StagStage 2 - NB Dividend to Bethele A1620Switch Traffic to Stage 21021-May-1821-May-185 Day A1630Remove Concrete Pavement & Sidewalk - South of RR8025-May-1813-Jun-18 5 Day A2420Complete Pavement Removal North of RR316326-Jun-1819-Jul-185 DayComplete Pavement Removal North of RR 2017-May-1818-May-185 DaySanitary Sewer SanitSanitary Sewera A149Install SS @ 26+56 w/ Temp Connection2017-May-1818-May-185 Day 7373428-Jun-1810-Oct-185 DayStorm Drain StorStorm Drainm A150Storm Drain Impovements NB333328-Jun-1803-Jul-185 DayStorm Drain Impovements NB A186Complete Inlet Tops after Paving88401-Oct-1810-Oct-185 DayComplete Inlet Tops after Paving 734828622-May-1804-Sep-185 DayWater Line WateWater Liner A140Steel Casing 23+81 to 26+1616022-May-1823-May-185 Day A144Install 16" Main in Bore3024-May-1824-May-185 Day Remaining Level of EffortActual WorkCritical Remaining Work Page 1 of 7 Run Date 27-Jun-18 Actual Level of EffortRemaining WorkMilestone Data Date 27-Jun-18 FYI-bridgeworkinStage2has floatbeforetheutilityconflict Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendar20182019 DurationDuration becomescritical;seeboxbelow rMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOct A143Install 16" Main 27+13 to 36+168025-May-1806-Jun-18 5 Day A164Install 16" Main 36+16 to 45+807007-Jun-1822-Jun-18 5 Day WaterlineAno A142Install 16" Main 19+00 to 23+10411426-Jun-1812-Jul-185 DayInstall 16" Main 19+00 to 23+10 longerappearsto A145Install Hydrants, Crossings, etc 19+00 to45+8044413-Jul-1818-Jul-185 DayInstall Hydrants, Crossings, etc 19+00 to45+80 A141Install Hydrants, Crossing, etc Dividend to 19+0066419-Jul-1826-Jul-185 DayInstall Hydrants, Crossing, etc Dividend to 19+00 becriticalaswas A146Connect to Existing @ 19+0811919-Jul-1819-Jul-185 DayConnect to Existing @ 19+08 lastmonth A147Finish Connecting Services22427-Jul-1831-Jul-185 DayFinish Connecting Services A148Grout Existing Water Line1010431-Jul-1814-Aug-185 DayGrout Existing Water Line A169Install 20" Waterline on Southwestern111128614-Aug-1829-Aug-185 DayInstall 20" Waterline on Southwestern A170Replace Pavement on Southwestern3328629-Aug-1804-Sep-185 DayReplace Pavement on Southwestern 82623424-May-1803-Oct-18Bridge BridgeBridge A103Demo Existing Bridge5024-May-1815-Jun-18 5 Day Newactivitytonote A261Drill Sub Mobilization10019-Jun-1820-Jun-18 5 Day theconflictwithFO A111Drill Shafts4021-Jun-1822-Jun-18 5 Day lines(Zayo) A156Drill Shaft Utility Conflict1145523-Jun-1812-Jul-187 DayDrill Shaft Utility Conflict A104Grading Proposed Bridge113828-Jun-1828-Jun-185 DayGrading Proposed Bridge A296Complete Drill Shafts553513-Jul-1820-Jul-185Complete Drill Shafts Wki A118Drill Shaft Cure335821-Jul-1824-Jul-187 DayDrill Shaft Cure A112Bent 2 Columns223923-Jul-1824-Jul-185 DayBent 2 Columns A113Bent 3 Columns223924-Jul-1826-Jul-185 DayBent 3 Columns Newactivity A119Bent 2 Column Cure336224-Jul-1827-Jul-187 DayBent 2 Column Cure A114Abut 1 Cap223926-Jul-1830-Jul-185 DayAbut 1 Cap A120Bent 3 Column Cure336426-Jul-1829-Jul-187 DayBent 3 Column Cure Floatforbridge A115Abut 4 Cap223930-Jul-1801-Aug-185 DayAbut 4 Cap activities A121Abut 1 Cap Cure336830-Jul-1802-Aug-187 DayAbut 1 Cap Cure A116Bent 2 Cap223902-Aug-1806-Aug-185 DayBent 2 Cap A122Abut 4 Cap Cure336502-Aug-1805-Aug-187 DayAbut 4 Cap Cure A168Install CTB @ Abutments336202-Aug-1807-Aug-185 DayInstall CTB @ Abutments A117Bent 3 Cap223906-Aug-1808-Aug-185 DayBent 3 Cap A123Bent 2 Cap Cure336106-Aug-1809-Aug-187 DayBent 2 Cap Cure A124Bent 3 Cap Cure335808-Aug-1811-Aug-187 DayBent 3 Cap Cure A151Install Riprap Under New Bridge333908-Aug-1813-Aug-185 DayInstall Riprap Under New Bridge A125Set Beams113914-Aug-1814-Aug-185 DaySet Beams A126Set Overhang11113915-Aug-1830-Aug-185 DaySet Overhang A127Install Precast Panels & PMD443930-Aug-1806-Sep-185 DayInstall Precast Panels & PMD A128Tie Deck Steel223906-Sep-1807-Sep-185 DayTie Deck Steel A129Pour Deck113907-Sep-1810-Sep-185 DayPour Deck A130Cure Deck885510-Sep-1818-Sep-187 DayCure Deck A131Install Ped Rail on Deck w/ Conduit10103918-Sep-1803-Oct-185 DayInstall Ped Rail on Deck w/ Conduit 7979420-Jul-1821-Nov-18Roadway RoadRoadway A171Balance Subgrade 1+55 to 36+0099320-Jul-1801-Aug-185 DayBalance Subgrade 1+55 to 36+00 A196Retaining Wall 45+51 to 48+2411114820-Jul-1806-Aug-185 DayRetaining Wall 45+51 to 48+24 A239Balance Subgrade 36+00 to 67+6899302-Aug-1814-Aug-185 DayBalance Subgrade 36+00 to 67+68 A197Retaining Wall 63+82 to 65+15664806-Aug-1813-Aug-185 DayRetaining Wall 63+82 to 65+15 A172Fine Grade Subgrade66315-Aug-1822-Aug-185 DayFine Grade Subgrade A1734" HMAC Ty B88322-Aug-1804-Sep-185 Day4" HMAC Ty B A174Tie Steel - Paving Pass 155304-Sep-1811-Sep-185 DayTie Steel - Paving Pass 1 A180Paving - Pass 133311-Sep-1814-Sep-185 DayPaving - Pass 1 Remaining Level of EffortActual WorkCritical Remaining Work Page 2 of 7 Run Date 27-Jun-18 Actual Level of EffortRemaining WorkMilestone Data Date 27-Jun-18 Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendar20182019 DurationDuration rMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOct A175Tie Steel - Paving Pass 255314-Sep-1821-Sep-185 DayTie Steel - Paving Pass 2 A187Cure Paving - Pass 133914-Sep-1817-Sep-187 DayCure Paving - Pass 1 A178Tie Steel - 2nd Half Cross Streets223617-Sep-1819-Sep-185 DayTie Steel - 2nd Half Cross Streets A176Tie Steel - Turn Lanes (13 turn lanes)221221-Sep-1825-Sep-185 DayTie Steel - Turn Lanes (13 turn lanes) A181Paving - Pass 233321-Sep-1826-Sep-185 DayPaving - Pass 2 A182Pave - Turn Lanes221126-Sep-1827-Sep-185 DayPave - Turn Lanes A188Cure Paving - Pass 233526-Sep-1829-Sep-187 DayCure Paving - Pass 2 A189Cure - Turn Lanes331628-Sep-1801-Oct-187 DayCure - Turn Lanes A177Tie Steel - 1st Half Cross Streets222101-Oct-1803-Oct-185 DayTie Steel - 1st Half Cross Streets A183Pave - 1st Half Cross Streets222103-Oct-1805-Oct-185 DayPave - 1st Half Cross Streets A190Cure - 1st Half Intersections333106-Oct-1809-Oct-187 DayCure - 1st Half Intersections A184Pave - 2nd Half Cross Streets222309-Oct-1811-Oct-185 DayPave - 2nd Half Cross Streets A195Backfill Pavement33411-Oct-1815-Oct-185 DayBackfill Pavement A191Cure 2nd Half Intersections333311-Oct-1814-Oct-187 DayCure 2nd Half Intersections A193Install Colored Stamped Concrete552711-Oct-1818-Oct-185 DayInstall Colored Stamped Concrete A179Tie Steel - Driveways222415-Oct-1817-Oct-185 DayTie Steel - Driveways A198Grade for Sidewalk1212416-Oct-1831-Oct-185 DayGrade for Sidewalk A185Pave - Driveways332417-Oct-1822-Oct-185 DayPave - Driveways A194Cure Stamped Concrete333718-Oct-1821-Oct-187 DayCure Stamped Concrete A192Cure - Driveways333322-Oct-1825-Oct-187 DayCure - Driveways A199Pave Sidewalk & Trail88401-Nov-1812-Nov-185 DayPave Sidewalk & Trail A200Backfill Sidewalk & Trail22413-Nov-1814-Nov-185 DayBackfill Sidewalk & Trail A201Grass & Landscape Outside55414-Nov-1821-Nov-185 DayGrass & Landscape Outside 9999927-Jun-1814-Nov-185 DayRailroad RailrRailroado A157Railroad Installed Ped Crossing Arms NB1110527-Jun-1827-Jun-185 DayRailroad Installed Ped Crossing Arms NB A158Connect Pavement NB223801-Oct-1803-Oct-185 DayConnect Pavement NB A159Build Sidewalk at RR Crossing NB22913-Nov-1814-Nov-185 DayBuild Sidewalk at RR Crossing NB 441101-Oct-1804-Oct-185 DayTraffic Signals TraffiTraffic Signals A152Signal Drill Shafts at Southwestern NB221101-Oct-1802-Oct-185 DaySignal Drill Shafts at Southwestern NB A154Install Conduit from NB Corners w/ Pull Boxes221102-Oct-1804-Oct-185 DayInstall Conduit from NB Corners w/ Pull Boxes 60601221-Nov-1803-Mar-19Stage 3A - SB Dividend to Fritz StagStage 3A - SB Dividend to Fritze A3840Switch Traffic to Stage 3A11421-Nov-1822-Nov-185 DaySwitch Traffic to Stage 3A A3890Remove Concrete Pavement22922-Nov-1826-Nov-185 DayRemove Concrete Pavement 994627-Nov-1811-Dec-185 DayWater WaterWater A228Remove & Replace Existing Hydrants334627-Nov-1803-Dec-185 DayRemove & Replace Existing Hydrants A229Complete Crossing @ 13+60224604-Dec-1805-Dec-185 DayComplete Crossing @ 13+60 A230Complete Crossing @ 16+05224606-Dec-1807-Dec-185 DayComplete Crossing @ 16+05 A231Complete Crossing @ 22+68224610-Dec-1811-Dec-185 DayComplete Crossing @ 22+68 36361312-Dec-1804-Feb-195 DayStorm Drain StorStorm Drainm A240Storm Drain Impovements SB224612-Dec-1813-Dec-185 DayStorm Drain Impovements SB A241Complete Inlet Tops after Paving221331-Jan-1904-Feb-195 DayComplete Inlet Tops after Paving 2626427-Nov-1808-Jan-195 DaySanitary Sewer SanitSanitary Sewera A236Install SS 32+33 to 23+8988927-Nov-1810-Dec-185 DayInstall SS 32+33 to 23+89 A232Drill Shafts for Aerial SS Crossing33403-Dec-1806-Dec-185 DayDrill Shafts for Aerial SS Crossing A233Columns for Aerial SS Crossing33406-Dec-1811-Dec-185 DayColumns for Aerial SS Crossing A234Caps for Aerial SS Crossing22411-Dec-1813-Dec-185 DayCaps for Aerial SS Crossing A235Casing for Aerial SS Crossing33413-Dec-1818-Dec-185 DayCasing for Aerial SS Crossing Remaining Level of EffortActual WorkCritical Remaining Work Page 3 of 7 Run Date 27-Jun-18 Actual Level of EffortRemaining WorkMilestone Data Date 27-Jun-18 Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendar20182019 DurationDuration rMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOct A237Install SS 23+89 to 17+3988418-Dec-1831-Dec-185 DayInstall SS 23+89 to 17+39 A238Rehab Existing SS Manholes55431-Dec-1808-Jan-195 DayRehab Existing SS Manholes 55551722-Nov-1822-Feb-19Bridge BridgeBridge A203Demo Existing Bridge55422-Nov-1803-Dec-185 DayDemo Existing Bridge A204Grading Proposed Bridge112103-Dec-1804-Dec-185 DayGrading Proposed Bridge A205Drill Shafts552104-Dec-1811-Dec-185 DayDrill Shafts A206Bent 2 Columns222111-Dec-1812-Dec-185 DayBent 2 Columns A220Drill Shaft Cure333311-Dec-1814-Dec-187 DayDrill Shaft Cure A207Bent 3 Columns222113-Dec-1814-Dec-185 DayBent 3 Columns A221Bent 2 Column Cure333813-Dec-1816-Dec-187 DayBent 2 Column Cure A208Abut 1 Cap222114-Dec-1818-Dec-185 DayAbut 1 Cap A222Bent 3 Column Cure333914-Dec-1817-Dec-187 DayBent 3 Column Cure A209Abut 4 Cap222119-Dec-1821-Dec-185 DayAbut 4 Cap A223Abut 1 Cap Cure334519-Dec-1822-Dec-187 DayAbut 1 Cap Cure A210Bent 2 Cap222121-Dec-1826-Dec-185 DayBent 2 Cap A224Abut 4 Cap Cure334221-Dec-1824-Dec-187 DayAbut 4 Cap Cure A219Install CTB @ Abutments333921-Dec-1827-Dec-185 DayInstall CTB @ Abutments A211Bent 3 Cap222126-Dec-1831-Dec-185 DayBent 3 Cap A225Bent 2 Cap Cure333726-Dec-1829-Dec-187 DayBent 2 Cap Cure A226Bent 3 Cap Cure333331-Dec-1803-Jan-197 DayBent 3 Cap Cure A218Install Riprap Under New Bridge442131-Dec-1807-Jan-195 DayInstall Riprap Under New Bridge A212Set Beams112107-Jan-1908-Jan-195 DaySet Beams A213Set Overhang662108-Jan-1915-Jan-195 DaySet Overhang A214Install Precast Panels & PMD552115-Jan-1922-Jan-195 DayInstall Precast Panels & PMD A215Tie Deck Steel222122-Jan-1924-Jan-195 DayTie Deck Steel A216Pour Deck112124-Jan-1925-Jan-195 DayPour Deck A227Cure Deck883125-Jan-1902-Feb-197 DayCure Deck A217Install Ped Rail on Deck w/ Conduit10102104-Feb-1918-Feb-195 DayInstall Ped Rail on Deck w/ Conduit A202Form & Pour West Sidewalk & Median442118-Feb-1922-Feb-195 DayForm & Pour West Sidewalk & Median 5757127-Nov-1803-Mar-19Roadway RoadRoadway A243Balance Subgrade662527-Nov-1807-Dec-185 DayBalance Subgrade A244Fine Grade Subgrade22508-Jan-1909-Jan-195 DayFine Grade Subgrade A2454" HMAC Ty B33410-Jan-1915-Jan-195 Day4" HMAC Ty B A246Tie Steel - Paving Pass 122415-Jan-1917-Jan-195 DayTie Steel - Paving Pass 1 A252Paving - Pass 122417-Jan-1921-Jan-195 DayPaving - Pass 1 A247Tie Steel - Paving Pass 222421-Jan-1922-Jan-195 DayTie Steel - Paving Pass 2 A266Cure Paving - Pass 133521-Jan-1924-Jan-197 DayCure Paving - Pass 1 A248Tie Steel - Turn Lanes22423-Jan-1925-Jan-195 DayTie Steel - Turn Lanes A253Paving - Pass 222324-Jan-1928-Jan-195 DayPaving - Pass 2 A254Pave - Turn Lanes22328-Jan-1930-Jan-195 DayPave - Turn Lanes A267Cure Paving - Pass 2331928-Jan-1931-Jan-197 DayCure Paving - Pass 2 A268Cure - Turn Lanes33430-Jan-1902-Feb-197 DayCure - Turn Lanes A259Backfill Pavement221530-Jan-1931-Jan-195 DayBackfill Pavement A249Tie Steel - 1st Half Cross Streets11204-Feb-1904-Feb-195 DayTie Steel - 1st Half Cross Streets A262Grade for Sidewalk441304-Feb-1908-Feb-195 DayGrade for Sidewalk A255Pave - 1st Half Cross Streets22205-Feb-1906-Feb-195 DayPave - 1st Half Cross Streets A269Cure - 1st Half Intersections33307-Feb-1910-Feb-197 DayCure - 1st Half Intersections A263Pave Sidewalk221308-Feb-1911-Feb-195 DayPave Sidewalk Remaining Level of EffortActual WorkCritical Remaining Work Page 4 of 7 Run Date 27-Jun-18 Actual Level of EffortRemaining WorkMilestone Data Date 27-Jun-18 Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendar20182019 DurationDuration rMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOct A250Tie Steel - 2nd Half Cross Streets11211-Feb-1911-Feb-195 DayTie Steel - 2nd Half Cross Streets A251Tie Steel - Driveways221112-Feb-1913-Feb-195 DayTie Steel - Driveways A256Pave - 2nd Half Cross Streets22212-Feb-1913-Feb-195 DayPave - 2nd Half Cross Streets A264Backfill Sidewalk111312-Feb-1912-Feb-195 DayBackfill Sidewalk A265Grass & Landscape Outside221313-Feb-1914-Feb-195 DayGrass & Landscape Outside A257Pave - Driveways221014-Feb-1915-Feb-195 DayPave - Driveways A270Cure 2nd Half Intersections33314-Feb-1917-Feb-197 DayCure 2nd Half Intersections A271Cure - Driveways331515-Feb-1918-Feb-197 DayCure - Driveways A258Install Colored Stamped Concrete88218-Feb-1927-Feb-195 DayInstall Colored Stamped Concrete A272Cure Stamped Concrete33328-Feb-1903-Mar-197 DayCure Stamped Concrete 22408-Jan-1910-Jan-195 DayLighting LightLightingi A285Install Conduit Between Medians22408-Jan-1910-Jan-195 DayInstall Conduit Between Medians 46469904-Mar-1914-May-19Stage 3B - Median Dividend to Airline StagStage 3B - Median Dividend to Airlinee A3850Switch Traffic to Stage 3B11204-Mar-1904-Mar-195 DaySwitch Traffic to Stage 3B A3900Remove Concrete Pavement11205-Mar-1905-Mar-195 DayRemove Concrete Pavement 151510106-Mar-1929-Mar-19Roadway RoadRoadway A273Balance & Fine Grade Subgrade22206-Mar-1907-Mar-195 DayBalance & Fine Grade Subgrade A2744" HMAC Ty B11207-Mar-1908-Mar-195 Day4" HMAC Ty B A275Tie Steel - Paving Pass 122208-Mar-1912-Mar-195 DayTie Steel - Paving Pass 1 A278Pave - Pass 111212-Mar-1913-Mar-195 DayPave - Pass 1 A276Tie Steel - Paving Pass 222213-Mar-1914-Mar-195 DayTie Steel - Paving Pass 2 A281Cure Pass 133213-Mar-1916-Mar-197 DayCure Pass 1 A279Pave - Pass 211118-Mar-1918-Mar-195 DayPave - Pass 2 A277Tie Steel - Paving Pass 322119-Mar-1920-Mar-195 DayTie Steel - Paving Pass 3 A282Cure Pass 23316419-Mar-1922-Mar-197 DayCure Pass 2 A280Pave - Pass 311120-Mar-1921-Mar-195 DayPave - Pass 3 A283Cure Pass 333121-Mar-1924-Mar-197 DayCure Pass 3 A284Colored Stamped Median Pavement2211127-Mar-1929-Mar-195 DayColored Stamped Median Pavement 77406-Mar-1918-Mar-19Lighting LightLightingi A286Install Illumination Drill Shafts (15 ea)22506-Mar-1908-Mar-195 DayInstall Illumination Drill Shafts (15 ea) A287Complete Conduit22708-Mar-1911-Mar-195 DayComplete Conduit A289Cure Illumination Drill Shafts66708-Mar-1913-Mar-197 DayCure Illumination Drill Shafts A288Set Illumination & Wiring22514-Mar-1918-Mar-195 DaySet Illumination & Wiring 383811121-Mar-1914-May-195 DayLandscaping LandLandscapings A290Install Irrigation System4411121-Mar-1927-Mar-195 DayInstall Irrigation System A291Install Landscape Borders2211129-Mar-1902-Apr-195 DayInstall Landscape Borders A292Install Landscaping181811102-Apr-1926-Apr-195 DayInstall Landscaping A293Install City Monument121211126-Apr-1914-May-195 DayInstall City Monument 9696825-Mar-1921-Aug-19Stage 4A - SB Fritz StagStage 4A - SB Fritz to Bethele A3860Switch Traffic to Stage 4A11025-Mar-1925-Mar-195 DaySwitch Traffic to Stage 4A A3910Remove Concrete Pavement88026-Mar-1904-Apr-195 DayRemove Concrete Pavement 66005-Apr-1915-Apr-195 DaySanitary Sewer SanitSanitary Sewera A294Install SS @ Southwestern44005-Apr-1910-Apr-195 DayInstall SS @ Southwestern A295Complete SS Rehab Work22011-Apr-1915-Apr-195 DayComplete SS Rehab Work 58581715-Apr-1905-Jul-195 DayStorm Drain StorStorm Drainm A308Storm Drain Impovements SB55015-Apr-1922-Apr-195 DayStorm Drain Impovements SB A309Complete Inlet Tops after Paving331701-Jul-1905-Jul-195 DayComplete Inlet Tops after Paving Remaining Level of EffortActual WorkCritical Remaining Work Page 5 of 7 Run Date 27-Jun-18 Actual Level of EffortRemaining WorkMilestone Data Date 27-Jun-18 Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendar20182019 DurationDuration rMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOct 3838005-Apr-1928-May-195 DayWater Line WateWater Liner A311Bore Casing Under Railroad (102 LF)1010405-Apr-1918-Apr-195 DayBore Casing Under Railroad (102 LF) A310Complete SB Water Connections 28+26 to 45+8022022-Apr-1924-Apr-195 DayComplete SB Water Connections 28+26 to 45+80 A312Install 16" Water Main 45+80 to 67+681515024-Apr-1915-May-195 DayInstall 16" Water Main 45+80 to 67+68 A314Connect to Existing @ 67+6811015-May-1916-May-195 DayConnect to Existing @ 67+68 A313Complete Connections North of 45+8022016-May-1920-May-195 DayComplete Connections North of 45+80 A315Remove/Grout Existing Water Line66021-May-1928-May-195 DayRemove/Grout Existing Water Line 8787805-Apr-1921-Aug-19Roadway RoadRoadway A320Balance Subgrade10102905-Apr-1918-Apr-195 DayBalance Subgrade A321Fine Grade Subgrade33029-May-1904-Jun-195 DayFine Grade Subgrade A3224" HMAC Ty B66004-Jun-1912-Jun-195 Day4" HMAC Ty B A323Tie Steel - Paving Pass 133012-Jun-1917-Jun-195 DayTie Steel - Paving Pass 1 A329Paving - Pass 133017-Jun-1920-Jun-195 DayPaving - Pass 1 A324Tie Steel - Paving Pass 233020-Jun-1925-Jun-195 DayTie Steel - Paving Pass 2 A343Cure Paving - Pass 133220-Jun-1923-Jun-197 DayCure Paving - Pass 1 A325Tie Steel - Turn Lanes (6 turn lanes)22125-Jun-1927-Jun-195 DayTie Steel - Turn Lanes (6 turn lanes) A330Paving - Pass 233025-Jun-1928-Jun-195 DayPaving - Pass 2 A331Pave - Turn Lanes33028-Jun-1903-Jul-195 DayPave - Turn Lanes A344Cure Paving - Pass 2332428-Jun-1901-Jul-197 DayCure Paving - Pass 2 A345Cure - Turn Lanes33103-Jul-1906-Jul-197 DayCure - Turn Lanes A326Tie Steel - 1st Half Cross Streets22008-Jul-1910-Jul-195 DayTie Steel - 1st Half Cross Streets A336Backfill Pavement44908-Jul-1911-Jul-195 DayBackfill Pavement A332Pave - 1st Half Cross Streets33010-Jul-1915-Jul-195 DayPave - 1st Half Cross Streets A337Install Gabions @ 61+8033912-Jul-1917-Jul-195 DayInstall Gabions @ 61+80 A346Cure - 1st Half Intersections33015-Jul-1918-Jul-197 DayCure - 1st Half Intersections A339Grade for Sidewalk1010917-Jul-1930-Jul-195 DayGrade for Sidewalk A327Tie Steel - 2nd Half Cross Streets22018-Jul-1922-Jul-195 DayTie Steel - 2nd Half Cross Str A328Tie Steel - Driveways222423-Jul-1925-Jul-195 DayTie Steel - Driveways A333Pave - 2nd Half Cross Streets33023-Jul-1925-Jul-195 DayPave - 2nd Half Cross Stree A334Pave - Driveways332425-Jul-1930-Jul-195 DayPave - Driveways A347Cure 2nd Half Intersections33026-Jul-1929-Jul-197 DayCure 2nd Half Intersections A335Install Colored Stamped Concrete1010029-Jul-1912-Aug-195 DayInstall Colored Stampe A348Cure - Driveways333230-Jul-1902-Aug-197 DayCure - Driveways A340Pave Sidewalk1010930-Jul-1913-Aug-195 DayPave Sidewalk A349Cure Stamped Concrete331912-Aug-1915-Aug-197 DayCure Stamped Concr A341Backfill Sidewalk22913-Aug-1915-Aug-195 DayBackfill Sidewalk A342Grass & Landscape Outside44915-Aug-1921-Aug-195 DayGrass & Landscape 92921405-Apr-1914-Aug-195 DayRailroad RailrRailroado A297Railroad Installed Concrete Panels SB1110405-Apr-1905-Apr-195 DayRailroad Installed Concrete Panels SB A298Railroad Installed Ped Crossing Arms SB1110405-Apr-1905-Apr-195 DayRailroad Installed Ped Crossing Arms SB A299Connect Pavement SB114203-Jul-1905-Jul-195 DayConnect Pavement SB A300Build Sidewalk at RR Crossing SB111413-Aug-1914-Aug-195 DayBuild Sidewalk at RR C 12121229-Jul-1915-Aug-19Traffic Signals TraffiTraffic Signals A302Signal Drill Shafts at Southwestern SB221329-Jul-1930-Jul-195 DaySignal Drill Shafts at South A304Install Conduit from SB Corners w/ Pull Boxes221530-Jul-1902-Aug-195 DayInstall Conduit from SB Co A305Signal Drill Shaft Cure661730-Jul-1905-Aug-197 DaySignal Drill Shaft Cure A301Install Signal Poles & Wire881305-Aug-1915-Aug-195 DayInstall Signal Poles & W 340299009-Apr-1818-Oct-19S StagStage 4B - Median Airline to Bethele Remaining Level of EffortActual WorkCritical Remaining Work Page 6 of 7 Run Date 27-Jun-18 Actual Level of EffortRemaining WorkMilestone Data Date 27-Jun-18 Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendar20182019 DurationDuration rMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOct A3870Switch Traffic to Stage 4B11921-Aug-1922-Aug-195 DaySwitch Traffic to Sta A3920Remove Concrete Pavement22922-Aug-1926-Aug-195 DayRemove Concrete 13132322-Aug-1912-Sep-19Bridge BridgeBridge A316Form & Pour NB Sidewalk222522-Aug-1923-Aug-195 DayForm & Pour NB S A317Cure NB Sidewalk333524-Aug-1927-Aug-197 DayCure NB Sidewalk A318Form & Pour NB Traffic Rail10102527-Aug-1910-Sep-195 DayForm & Pour A338Illumination and Banner Poles on Bridge222510-Sep-1912-Sep-195 DayIllumination a 3434026-Aug-1918-Oct-19R RoadRoadway A363Balance & Fine Grade Subgrade22926-Aug-1927-Aug-195 DayBalance & Fine Gr A3644" HMAC Ty B22928-Aug-1929-Aug-195 Day4" HMAC Ty B A365Tie Steel - Paving Pass 111929-Aug-1930-Aug-195 DayTie Steel - Paving A368Pave - Pass 111930-Aug-1902-Sep-195 DayPave - Pass 1 A366Tie Steel - Paving Pass 211902-Sep-1903-Sep-195 DayTie Steel - Pavin A372Cure Pass 1332502-Sep-1905-Sep-197 DayCure Pass 1 A373Cure Pass 2331303-Sep-1906-Sep-197 DayCure Pass 2 A369Pave - Pass 2111705-Sep-1906-Sep-195 DayPave - Pass 2 A367Tie Steel - Paving Pass 3111706-Sep-1909-Sep-195 DayTie Steel - Pa A370Pave - Pass 3111709-Sep-1910-Sep-195 DayPave - Pass 3 A374Cure Pass 3332409-Sep-1912-Sep-197 DayCure Pass 3 A350Tie Steel - Pass 4111710-Sep-1911-Sep-195 DayTie Steel - Pa A351Pave Pass 4111613-Sep-1913-Sep-195 DayPave Pass 4 A352Cure Pass 4332414-Sep-1917-Sep-197 DayCure Pass A383Colored Stamped Cross Walk221817-Sep-1919-Sep-195 DayColored St A371Colored Stamped Median Pavement221819-Sep-1923-Sep-195 DayColored S A382Permanent Striping55011-Oct-1918-Oct-195 DayP 1919706-Sep-1904-Oct-19Lightin LightLightingi A375Install Illumination Drill Shafts (27 ea)88906-Sep-1918-Sep-195 DayInstall Illum A376Complete Conduit44918-Sep-1924-Sep-195 DayComplete A378Cure Illumination Drill Shafts661418-Sep-1924-Sep-197 DayCure Illum A377Set Illumination & Wiring88924-Sep-1904-Oct-195 DaySet Illu 335299009-Apr-1818-Oct-19La LandLandscapings A388Duration530478009-Apr-1818-Oct-197 Day A379Install Irrigation System1212012-Aug-1928-Aug-195 DayInstall Irrigation Sy A380Install Landscape Borders88028-Aug-1909-Sep-195 DayInstall Landsca A381Install Landscaping2424009-Sep-1911-Oct-195 DayInst Remaining Level of EffortActual WorkCritical Remaining Work Page 7 of 7 Run Date 27-Jun-18 Actual Level of EffortRemaining WorkMilestone Data Date 27-Jun-18 Activitieswith associatedstart/ finishdatestobe progressedthis month