2018 3rd QuarterT M E C 1 T Y - O F
CrOlIFFTE"LL
IN -Weekly Report `� Date: % S Z cfk
Ct.:r..nwr�tnr r....ct..:Ots An Citp IAcnprnnn Report
255 TAnitWAY * P.O.SO% 9470 * COPPELL Tx 75019 * TEL 972/462 0022 * FAX 972/304 3G73
General information
Project Name
MoOkadon To Nortidake Dams
NPDESTmddngmo,
Date of Inspectionstart/Emd
TXT
I.ocatian DaftsTX
rwne
Inspector's Name:
is ms "owe
inspector"sTitie.
Dam bapector
Inspecto►" s Contact lnformmdort:
-607-Sil66
Inspector'stions:
.
Desa i6e present ohase of
constnKtIon
Onplag Man denam
Type of -
Regtdas
Pnr3torrre event
During -W- event Past -storm event
Mfarynation
""Owe been a stormevmtt siaoe thelast lttsoection_ Yes No LJ'
HYes,Pmvidm StormstartDat Grime
ration this.) Aoprmataate oaf Pr,r+ tj
attbneettldsic on?
cloudy LE] ��
�Mrands other
rHav_
s>eetgF
Tempy
di9darges acumed shore the last InsPecNon? Ye4-=r
ityes, desrnbe-
AreVweaaj/ dsduwgm at the Vine ofhWCGEi'on? • , w ie� No
SMP
SMP installed ?
Corrective action Needed and Notes
1 slagPlle
Yes:_Ayes
:� _No !.,_
2
Yes
3
Yes i..-..No_.•1 Vei
4
Yes -�No �.� Yes
S
r _-aro _ --- I res
Ye: If
-
_Aft, C-__.
6
Yes g� — Yom
7
Yes .,NoN- ,Yes
--
._faro
8
Yes E.�_ No E _._ Y�
i. sto f -, _.j
9
es - -_No _,... Yes
�^_?No_
10
Yes-- J_.Js ---__ Yes
y000 -J
11
Yes L _INo
12
Yes ~ No ,. Yes
No -
13
Yes �. .. No
No
14
Yes #No % Yes
JNo
i5
Yes _ esU.
aro
16
Yes No .. Yes
L J No � .-
17
Yes _ No �._ Yes
.. r_ No
18
Yes ;,aro Yes
rjNo --
19
Yes
20
Yes ;_#nlo
255 TAnitWAY * P.O.SO% 9470 * COPPELL Tx 75019 * TEL 972/462 0022 * FAX 972/304 3G73
BMP/ ActWdy
Ma"Kena c e
Required?
Corrective Action Needed and Notes
Area oyes an
disturbed arms not
actively being worked
stabilized?
Yes i 1No i°---
Yes _ NO
Are natural resource
areas (e.g., streams, .
2
wedanaf% mature trees,
:.
etc) protected with
barriers or similar BMPs?
Yes � �No ��_':
r- e�
Yes t_ ----r No ---
Are perimeter controls
-
and sediment barriers
3
adequately installed
(keyed into substrate and
r
mairttaix?
Yes =No :Yes
1 F No
Are discharge points and
4
receiving waters free of
any sediment deposits?
i
Yes !' No
Yes 140
5
Are Starr drain inlets
/J►/
�__
�%%
properly protected?
✓UU
Yes-r_-9No `;
Yes — No
Is the construction exit
6
preventing sediment
being tracked into the
street?Yes
No .
Yes• Alo
Is trash / litter from work
/�
V'
..
7
arms colected and placed
"'
In covered dumpsters?
Year t: ,iNo '`
Yes No tom_
Are washout facilities
(e.g., paint, stucco,
8
concrete) available
dearly marked, and
maintained?
Yes :.:iNo
Yes__, No --
Arevehicleand
equipment fueling,
cleaning, and
g
maintenance areas free
of spills, leaks, or any
adrerddeterious
materials?
- r __ :
Yes `�rNo
Yes _- No
Are materials ttrat are
(�
10
potentialstormwrater
jV
I
contaminates stored
Inside or under cover?
Yes l _ i NO i5 `i
Yes € NO
Arenon-swrmwater
11
discharges (e g_, wash
water, dewatering)
properly controlled?
Yes)Yes
— �.�✓
`tel No 3
�>
yes. No�_
rite any inciderd of rwtrM
CBRriF "TWN srATSW n -
y of taw brat this d,,... and au atWdaments
wfth a systern m �wre that °� W*Pared -Wermy m ectioa or
Based on my in4 del oPthe
petsonno P°1D+1e iY>;adrered and eual supervision in
g�edng the infp fire uated the information
per
orpersonsvdtp �� Zhesyst�em, orthose Pe.sons
am aware tftat thane are signifi� �� to the best of my 8e and befie� day n'sponsible for
penalties forsubmitting false true, accurate, and complete. i
wWm'b""' mdudingthePasslbilityoffineand imiuisoment
!n* -k,g,!.!.tions.
Print Name and Title:
LAMES HOWE _DAM INSPECTOR
Signature:
Date:^ J
T H E • C 1 T Y - 0 F
COPPERLL
Ri Weakly Report "'' ,�' r
- t"mwater Cm -d -v Site Itisneetioa Report
-7,-
251 Pnn11WAY * P.0.13OX 9478 * COPPELL TX 75019 * TEL 9721462 0022 * FAX 972130.1 3673
General Information
Project Name
Mod-dicadon To Northlaloe Darts
WPOESTractdngNo.
_
location
Dallas
Date ofhispec-don
7-21- 0
Endrlme
_ �
hmpeccoes 1Yarrre:
James nowe
InspeauesTitim
Dam inspector
-
Inspednes Contact tMormatiom
q72—m-5466
Inspettorls Onions
Describepewn Prof
Construction
Ongdag Maintenance
Type of 1
Regular
P --w— event
-
During
storrn event Postitorm event
Weatherlolonnation
Has there been a storm agent since theiMt inspection: Yes No
If yes, provide: Storm Start (Fate & Tune
Storm Duration (hm) ApprnWmWe amwat of Preofpitatiorr (hrs.)
Weatherattih eofthisirupectim?
Clear cloudy Rain
Snowing High WindsF Other '
Sleet irog
Temperature
Have awdisclomesoccurredsincethe last innpection7 Yes-
ifVes, describe:
No
Aretherearwdisdummat the time of on? ,, , w Iles "
_
Nowwwwoultenance
Bpap' 7'
I
Corrective Action Needed and Notes
.
1 Slag Pile
_
Yes : € _ , Ato (_ ... Yes -
, No�
JO
_ 1'
2
Yes . ___ .,Ido _ Yes
No
3
_
Yes 1 Yes
jwl
;r
4
S
Yes _ HOT-73 Yes
Yes No _ __k Yes
-Jno
_-^}No•
- _-
6
Yeses Yes
f_.JNo
=
7
es . �lnto :., Yes
t ;Wo
.
8
Yes (..... No ( Y�
No
(-.-
9
Yes__�No Yes
(`_5Wo
€ . y.•
10
Yes-- (_.�.fNo Yes
In
ti;No�_�
11
Yes L _No Yes,�,�No=-
i12
Yes —. NoYes
„No
- --
13
Yes �_ ,No-- �__ Yes
t No
14
Yes {No i r _ , Yes
15
Yes �_. N0 ,.� Yes
Wo
16
Yes _.. - Ido J . Yes
_ - No
L'J
17
Yes - No --., Yes
No
18
Y� _,ido - Yes
jWo
-11
19 Ives
No Yes
No
20
Yes ,_(No Yes
ti No
251 Pnn11WAY * P.0.13OX 9478 * COPPELL TX 75019 * TEL 9721462 0022 * FAX 972130.1 3673
Implemented
aiarrm netme
Corrective Action Needed and Motes
SMP/ Actnvrty
Required?
Are All sWp-es and
disturbed areas not
1
being worked
activelyc
stabilized?
Yes �No ��
,��
Y. 3 No c�—._.
Are natural resource
areas (e g., streams.
Z
wetlands, mature
-
etc) protected with
barriers or similar SMPs?
Yes No -
Yes [=No ) �_
Are perimeter controls
_
and sediment barriers
3
adequately installed
(keyed into substrate and
�"
-
maintained)?
Yeses �a
-
Yes { No
4
Are discharge points and
receiving waters free of
i
any sediment deposits?
Yes No� Y
Yes t_) No _
Are storm drain inlets
�T
IV,4
5
properly protected?
Yes%i%i No
Yes j No
Is the construction exit
preventing sediment
6
being tracked into the
street?
Yes L. _-,,':No
lye$ k 04o
Is trash / litter from work
7
areas colected and placed
in covered dumpsters?
-• `— �.--
Yp�r L�=No
�� . A^.- :_
Yes % No
Arewastuouut#acil{ties
(e.g., paint, stucco,
� ^
-
g
concrete) available
dearly marked, and
maintained?
Yes No
Yes -__j No <---
Arevehicleand
equipmentfueling,
1j ,/)
a /� 14
cleaning, and
/►v/
/
9
maintenance areas free
(�!
of spills, leaks, or any
otherdefeterious
_-.
�- --,
materiats?
Yes i =.;
Yes
Are materials that are
J( J
potential stormwater
/I V
10
contaminates stored
inside or under cover?
_ _
Yes (- y, No i� i
Yes `x No p
Are non-stormwater
discharges (eg., wash
11
water, dewatering)
properlvcontroiled?
Yes ' R —.—,Yes=
_, o ' _A
12 (O�
Yes.. -..No Ye. .r_j Alor.�
ribe any ink of not described abow&
--------------------
CBMICATKM SFATOWEW
" t under peogtty of lawthat this dDCwmentand all attactunentsWjeM prePared wary direction orUwervision in
accar+dancevokhasgstem Wasmrethatw-Wiiedp—nnelPAY&meredandevaluatedtheudminabon
Based on my 11+9�Y011`UePe7saeorperionswho o>arna$ethesy3tem, orthose
c
gam tbe;nkrmatlon, the � usbi ted K to the best of Pi s dirett� n�espo=W for
am aware that there are rnY � and be".ef, frog acwrate, arai vmptMe, t
significant peoples farsu mitt8lgFalse � the Po lilbWty affee and imprisonment
for ianowing violations.
Print Name and Tjtt MES HOWE- DAM IN5PEMR
gnature: trate: 3� 1�
T H E - C I T V - O F
COFFF"E""LL
Bi WeeWy Report`: Date:
Nt
R � •. Q
Sta nwater 0nns4.4ti-An Sits- iA."nn Rennrt
7 t -3-i
25s PAnKWAy h P.O.60X 9470 * COPPCLL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
Genera{ information
Project Name
R &HuC3tionTo Worthia&e Dams
NPMST—WngNo.
t�om"On
_
jDaUasTX
Date of inspection
- "1 -•
-0 1,7
Inspector's Name:
Janes Bowe
InT!E rn! sTitkc
Daae Inspector
InspecWes Contact Information:
972-607-5466
inspectors QuaGfimtion=
Qesalbe present phase of
construction
Ongoing Maintenance
Type of hlspediom
Regular
Pre3torm event
Y During
storm event Post -storm evert
Weather mon
Hastherebeen astormevent*mtheiasti Mmaton: Yes 111u
If yes, provide: Storm Start Date & Time
StormDmationmm) sppro easnoupt�Ptedfp Orn jos.)
Weatherat tine of this a>sperxion?
Clear Cloudy
Saovr7ngF iGgh Winds
RainSleet
Othe;
Fog
Temperature
Have auv oaurred since thelast inspection? Yes -
ifyes, describe:
no I ---
- ---.if
/iretheremv disdrwMat thetlme atkbpeCdon? Yes
Afo
Sltllll� hid ?
.� -
Corrective Action Needed and Notes
1 Slag Pile
Yes Rio { _ Yes
Rio
Z-_
2
Yes _ _ ._Rio es
- _ jii-
3
4
Yes s no
Yes
No..�.3
�
5
Yes _ No --i yes
Ab
U_
6
Yes iL_ jmo _--i Yes
es L, INo -_ -- .. Yes:
t 31No
8
No € - j Yes
m
_ }
9
Yes jNp lz Yes
1. _ tNo
€� :�•
10
Yes - _. j_4No
11
Yes -- €Rio Yes
12
yes —. No Yes
roc,
13
Yes Yes
R�
14
Yes #Rio rem ., , Yes
_No
15
Yes Rio
es
- No
-
16
Yes rRb
Yes
No
17
Yes _. No Yes
_ , No
f ..,
18
Yes �,No _ Yes
~Yes
' iNo
19
Yes No -
> Rio
j
20
Yes _ No qyes
No
C -_
25s PAnKWAy h P.O.60X 9470 * COPPCLL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
ampf activity
Wpl
a Coffectfue Action Need and Notes
are an slopes and
1 disturbed areas not
actively being worked
P"WerlystabiRme
Yes LAZNO
Yes t=—� No - --i
Are natural resource
areas (eg., streams,
2 u eftWs, mature orras�
"
etc) protected with
barriers or similar emps?
=-
Yes _ _ ' No J'
Yes--_ No
Are perimalero�ttrok
-
_ -
mW gent barriers
-
3 adequately installed
(keyed into substrate and
_
_ - - �
mttr
A
Yes No F� '
�s No
Are discharge points and
4 reteivingwatersfreeof
any sediment ?
Yes ; No
Yes � � No
are storm drain inlets
N
5
properly protected?
Yes t----JNo = =
Yes _9 NO y--�
Is the construction exit
6 presediment
being trodeedInto the
_
street?
Yes `_—j {
Yes•'L.. No,
la trash / litter from work
7 areas eolected and placed
In covered dtmhpsters?
Yes t._ _ - No _
YesNo.
ArewashontfacM im
(e.g., Dint. stucco,-
8 concrete) available
}/
✓ / i
dearly market% asM
(—�'
—
maintained?
Yes''
�-�,Np ��
Yes _—_4 No
are vehicle and
etphi{unentfueiing,
cieanklg, and
/V 14
9 nu atemaeceareasfree
ofsp8is, leaks, orany
other deletedous
ntaterlalsT
Yes r.._ No
Yes _No
Are his lho are
potential stornmater
^ 4
/ V D
1U
centanirates shed
/
inskte or urnder t�hrer?
Yes C D Nom
Yes 4 No
Are Aon stgrutwater
disdarges 11 (e's'hvash
Ovate, dewatarieg)
paopery►coa►troeed? _.
y
Yes t: nim, �
Yes ' _D No d
wxlw any Incident of not
J'jaj e
C0ffmciA Oils STAT
n,of and
aloowd3noe�an't+oallpepfmYdkectionorsuFervrswnitr
�t Based on my inquGyof t P"Dmf/gWtlremd and evaluated the imf,,.Uoa
aln�,tfieinfona���d�tothebestof ���d�yef+or
there are s)gnilkant penaltJeS fipr fakr'r' ttre Pa�Rrrllty of �i ere. I
� o�Orrs.
Print Name and Title: JAMES NOWF _ nnnn ..,-
Signature;
T H E C 1 T Y O F
COFFELL
RAIN EVENT DATE: J l JF a RAINFALL: ► t/
s —r
Stormwater Construction Site Inspection Report
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
General Information
Project Name
Modification To Northlake Dams
NPDES Tracking No.
TXR15002100
Location Dallas TX
Date of Inspection
— r , :D ' —
Start/End Time
Inspector's Name:
James Howe
Inspector's Title:
Dam Inspector
Inspector's Contact Information:
972-607-5466
Inspector's Qualifications:
Describe present phase of
construction
Ongoing Maintenance
Type of Inspection:
Regular
Pre -storm event
During storm event L=Post-storm event
Weather Information
Has there been a storm event since the last inspection:
If yes, provide: Storm Start Date & Time
Storm Duration (hrs.)
Yes No
Approximate amount of Precifpitation (ins.)
Weather at time of this- inspection?
Clear P= Cloudy Rain
Snowing I High WindsF=� Other
Sleet Fog
Temperature(
Have any discharges occurred since the last inspection?
If yes, describe:
Yes
No
Are there any discharges at the time of inspection?
Yes
No
BMP
BMP)nstalled ?
ESIVIF maintenance
Required? Corrective Action Needed and Notes
1 Slag Pile
Yes No
Yes
o J 0 C't
2
Yes No
Yes UNo
3
Yes No
Yes
No
4
YesNo
Yes
No `
5
Yes No
, Yes LJ
No
6
Yes No
Yes
No
7
Yes LjNo
. Yes
No
8
Yes No
Yes
No
9
Yes LLJ No
f Yes UNo
10
Yes No MYes
UNci
11
Yes No
Yes
No
12
Yes No
Yes I
No
13
Yes No
Yes
No
14
Yes No
Yes UNo
15
Yes =No
Yes UNo
16
Yes No
p Yes
No
17
Yes No
Yes
No
18
Yes =No
Yes UNo
19
Yes No
Yes
No
20
Yes I INo
Yes LjNo
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
BMP/ Activity
Implemented
maintenanceRe Required?
q
Corrective Action Needed and Notes
Are all slopes and
1
disturbed areas not
actively being worked
No
properly stabilized?
Yes
Yes r ' No
Are natural resource
areas (e.g., streams,
2
wetlands, mature trees,
etc) protected with
barriers or similar BMPs?
Yeso )-
Yes = No
Are perimeter controls
and sediment barriers
3
adequately installed
(keyed into substrate and
maintained)?
YesNo
Yes._. WS No
q
Are discharge points and
receiving waters free of
/N
any sediment deposits?
Yes ''
_
a
No
Yes �_
Are storm drain inlets
5
Ilii
properly protected?
$
No
Yes No
t t
Yes
Is the construction exit
6being
preventing sediment
tracked into the
street?
Yes o
Yes No
Is trash / litter from work
N
7
areas colected and placed
in covered dumpsters?
No
Yes ! ) No
Yes
Are washout facilities
(e.g., paint, stucco,
g
concrete) available
clearly marked, and
maintained?
Yes No ._ ;
Yes No __7
Are vehicle and
equipment fueling,
cleaning, and
9
maintenance areas free
of spills, leaks, or any
other deleterious
materials?
Yes No
Yes _ No
Are materials that are
/�
10
potential stormwater
contaminates stored
inside or under cover?
Yes L_J No
j Yes No
Are non-stormwater
11
discharges (e.g., wash
water, dewatering)
properly controlled?
Yes � No
Yes 0 No
12
(Other)
Yes = No.,
Yes ® No
any incident of non-compliance not described above?
CERTIFICATION STATEMENT
" I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information
submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and
imprisonment for knowing violations.
Print Name and Title: JAMES HOWE - DAM INSPECTOR
2�
Signature: Date: ( Sr
T H E C I T Y v F
COPFELL
0- --
CZ�+� � \moi: �," :L-- ✓T
RAIN EVENT DATE: 5{✓ s n
RAINFALL:
Stonnwater Construction Site Inspection Report
255 PARKWAY .Y P"0.60X 9470 :t COPPELL TX 75019 * TEL 972/462 0022 :• FAX 972/304 3673
General fiiformation
Project Name
Modification To Northlake Dans
NPDES Tracking No.
TXR15002100
ILocation
Dallas TX
Date of Inspection
' - a L' —
Start/End Time
c? o -el- - 3 eo jr'!
Inspector's Name:
lames Howe
Inspectors Title:
Dam Inspector
Inspector's Contact Information:
972-607-5466
Inspector's Qualifications:
Describe present phase of
construction
Ongoing Maintenance
Type of Inspection:
Regular
Pre -storm event
During storm event Post storm event
Weather information
Has there been a storm event since the last inspection: Yes No
If yes, provide: Storm Start Date & Time
Storm Duration (hrs.) Approximate amount of PredWdation (ins.)
Weather at time of this inspection?
Clear Cloudy Rain
SnowingF:::� High Winds Other
.
Sleet Fog
Temperature
Have any discharges occurred since the last inspection? Yes No
If yes, describe:
Are there any discharges at the time of inspection? Yes No
BMP
Givir
BMP Installed?
marmenanim
Required? Corrective Action Needed and Notes
1 Slag Pile
Yes l__�sNo Yes
- •'.No ti.IQ )C=
2 _
Yes L,,� No `i Yes
NO Q L .� c
3
Yes � No %, Yes
C'No--
4
Yes _._._No )_ y Yes
No!
__No5 Yes L—
s- '
��;
`I Yes6 o
_No^-
7
Yes.tNo _ i Yes
z' No
8
Yes t �JNO i Yes
-� No _ii
9
Yes (No z ++ Yes
sNo
10
Yes—__iNo $Yes
$No t�'t
11
Yes _ l No Yes
J 111o.�"�
12
Yes a r3 No Yes
U No r _
13
Yes ' No Yes
No i
14
Yes [___.)No Yes
i=1 No -
L4
Yes ,__ No Yes
N0
26
Yes_ No,i Yes
17
Yes = u No Yes
No
18
Yes l_ No f 1 Yes
`_ No L
19
Yes_ INo € -t Yes
20
Yes_y No _ __.__ Yes
�,No
255 PARKWAY .Y P"0.60X 9470 :t COPPELL TX 75019 * TEL 972/462 0022 :• FAX 972/304 3673
BMP/ Activity
implemented
m enance
Required?
Corrective Action Needed and Notes
Are all slopes and
1
disturbed areas not
actively being worked
._ 1
P
properly stabilized?
Yes No
Yes No
Are natural resource
areas (e g., streams,
2
wetlands, mature trees,
etc) protected with
barriers or similar BMPs?
—t��
Yes No =
= , -
Yes s No
Are perimeter controls
and sediment barriers
3
adequately installed
(keyed into substrate and
maintained)?
Yes No a�
Yes No [0 -
Are discharge points and
4
receiving waters free of
any sediment deposits?
Yes No
Yes �— " No
5
Are storm drain inlets%�/
/14
properly protected?
/
_
Yes i,J No (
Yes No
Is the construction exit
6
preventing sediment
being tracked into the
street?
"
Yes No
Yes No
Is trash / litter from work
7
areas colected and placed
in covered dumpsters?
Yes t No
r®;
Yes Via' No
Are washout facilities
(e.g., paint, stucco,!!
8
concrete) available
clearly marked, and
maintained?
Yes No
Yes No
Are vehicle and
equipment fueling,
cleaning, and
r
9
maintenance areas free
of spills, leaks, or any
other deleterious
materials?
YesL-jNo
Yes No
Are materials that are
10
potential stormwater
contaminates stored
Inside or under cover?
Yes No
Yes " ) No (— j
Are non-stormwater
11
discharges (e.g., wash
water, dewatering)
properly controlled?
Yes No IYes
` No
12
(Other)
®11
YYCJ
141
Yes No 0
Yes 0 No
any incident of non-tompriartce not described above?
CEKlWlCATMSfATEWlENT
" I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information
submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. i am aware that there are significant penalties for submitting false information, including the possibility of fine and
imprisonment for knowing violations.
Print Name and Title: JAMES HOWE - DAM INSPECTOR
Signature: ��,(, V y Date: j (/
T H E C I T `; . O F
J 1. � ;� ✓_ _�y.
RAIN EVENT DATE: amu'-��r`.�'
ti S s RAINFALL: , ,J
Stormwater Construction Site Inspection Report
Name Modification To Northlake Dams
racking No. TXRlSO02100 Location
PDate
Dallas TX
nspection J Start/End Timer's
Name: lames Howe
InspectoesTitie: Dam inspector
Inspector's Contact information: 972-607-5466
Inspector's qualmscations:
Describe present phase of Ongoing Maintenance
construction
Type of Inspection:
Regular Pre -Storm event During storm event
✓/ poyrt-storm event
Weather Information
Has there been a storm event since the last inspection: Yes No
If yes, provide: Stone Start Date & Time
Storm Duration (hrs.) Appraidmate amount of Precifpitation (ins.)
Weather attune of this inspection? t:
ClearP� Cloudy Rain Sleet
Fog
Snowing High WindsPE� Qther Temperature
Have any discharges occurred since the last inspection? Yes No
If yes, describe:
Are there any discharges at the time of inspection? Yes No
BMP SNIP installed ?
enance
Required? Corrective
Action Needed and Notes
1 Slag Pile Yes. ANOi Yes o
2 - ;T
Yes t�Yes
No vi ��$No a j
.) _) C
3 Yes ��INo p_ t Yes g_ No
¢ Yes .. kNo i Yes i No !
S--
253 PARKWAY .} P.O.BOX 9470 * COPPELL TX 75019 * TEL 972/4G2 0022 - FAX 972(301 3673
maintenance
BMP/ Activity
Implemented
Required?
Corrective Action Needed and Notes
Are all slopes and
disturbed areas not
1
actively being worked
--
properly stabilized?
Yes '7z' o :_=
Yes _ No —
Are natural resource
areas (e.g., streams,
Z
wetlands, mature trees,
etc) protected with
barriers or similar BMPs?
Yes No `�
Yes ) No
Are perimeter controls
and sediment barriers
3
adequately installed
(keyed into substrate and
_
maintained)?
Yes —/No
Yes 7 No
Are discharge points and
4
receiving waters free of
any sediment deposits?
Yes No `
Yes v_ ' No '
5
Are storm drain inlets
properly protected?
r
Yes r. i No
Yes No
Is the construction exit
6
preventing sediment
being tracked into the
street?!,
Yes = No L_-
-
Yes ` No
Is trash /litter from work
��
7
areas colected and placed
r
in covered dumpsters?
Yes No ^_
Yes No —
Are washout facilities
(e.g., paint, stucco,
g
concrete) available
clearly marked, and
maintained?
Yes No
Yes No
Are vehicle and
equipment fueling,
%
cleaning, and
�1
/�
9
maintenance areas free
1
of spills, leaks, or any
other deleterious
materials?
Yes _ No :_'
Yes No
Are materials that are
10
potential stormwater
,�i/�
%� / I
contaminates stored
1 "
Inside or under cover?
Yes 5 No —
Yes No —,
_�
Are non-stormwater
discharges (e.g., wash
11
water, dewatering)
properly controlled?
Yes No `__
Yes No _ '
12
Mier)
A14 4
Xes ®roo
Yes roo
any incident of non-compliance not described above?
CERTWICATIOl. STATEMENT
" 1 ceMfv under penalty of law that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information
submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. 1 am aware that there are significant penalties for submitting false information, including the possibility of fine and
imprisonment for knowing violations.
Print Name and Title: JAMES HOWE - DAM INSPECTOR
Signature: Date:
Inspector's Title: Dam Inspector
T H C I T y Q r_
Inspector's Contact Information: 972-607-5466
....'—1-LUnei[CI
Inspector's Qualifications:
Describe present phase of Ongoing Maintenance
construction
RAIN EVENT(✓XJ
111
DATE:>.
i. No
RAINFALLS, Z
During storm event
Stormwater Construction Site Inspection Report
Project Name
General lriformation
NPOES Tracking No.
Modification To Northlake Dams
Date of Inspection
TXR15002100 Location Dallas TX
Inspector's Name:
Start/End Time
James Howe � • 3 : _3v lcic l
Inspector's Title: Dam Inspector
BMP
Inspector's Contact Information: 972-607-5466
....'—1-LUnei[CI
Inspector's Qualifications:
Describe present phase of Ongoing Maintenance
construction
Type of Inspection:
i. No
Regular Pre -storm event
During storm event
Weather Information
Has there been a storm event since the last inspection:
If yes, provide: Storm Start Date & Time
Yes
— No
Storm Duration (hrs,)Z`�/
t
Weather at time of this inspection?
Approximate amount of Preafpftation (ins.)
Clear Cloudy � Rain
Snowin High Winds
g
Sleet Fog
Other
Have any discharges occurred since the last inspection?
Temperature
r
If yes, describe:
Yes No l _�
Yes
No
Are there any discharges at the time of inspection?
yes
No
No
event
Corrective Action Needed and Notes
a P_.
255 PARKWAY .} P - 0.60X 9a7G
:Y Capp ELL TX 75019'--_-
ir TEL 972/462 0022 ;• FAX 972/30.1 3673
BMP
BMP Installed ?
....'—1-LUnei[CI
1
Required?
Slag Pile Yes
i. No
Yes
2
o
3
Yes
- _ No
Yes
_
No
4
Yes
- NO
_
Yes
No
Yes
No
Yes
0 N -
Yes
No
- Yes
No
6
7
Yes
No
Yes
_.
4No
$
Yes
No L_
Yes
g
Yes-
NO -- :-
-
`Yes—
10
Yes
No ---
t
- Yes
No -_
Yes
No
Yes
I No
11
12
_
Yes
, No
13
Yes
� .� _ No
-Yes
_
�s No 4 _
14
Yes
. No =
f -rNo
Yes
L�
Yes
k
Yes
No -
16
Yes
No _---
-
Yes
No
17
Yes
No -
-: Yes
No
18
Yes
No -
—
Yes
- No
19
Yes
_
__-_=- No_
Yes
No
20
Yes
- No
Yes
No
Yes
(-- __ No
vow
me_ t
event
Corrective Action Needed and Notes
a P_.
255 PARKWAY .} P - 0.60X 9a7G
:Y Capp ELL TX 75019'--_-
ir TEL 972/462 0022 ;• FAX 972/30.1 3673
Implemented maintenance---
BMP/ Activity Required? Corrective Action Needed and Notes
Are all slopes and
1 disturbed areas not
actively being worked
properly stabilized? Yes o Yes ( No
Are natural resource
areas (e.g., streams,
2 wetlands, mature trees,
etc) protected with
barriers or similar BMPs? _
Yes No Yes No
Are perimeter controls
and sediment barriers
3 adequately installed
(keyed into substrate and
maintained)? Yes s i No Yes Ei No
Are discharge points and
4 receiving waters free of
any sediment deposits?
Yes No Yes No
5 Are storm drain inlets / A
properly protected? J "�
Yes { 1 No Yes :` No
Is the construction exit
6 preventing sediment `
being tracked into the
street? r--, e _�
Yes No i� Yes ?No
Is trash /litter from work /V� ^ ,i�
7 areas colected and placed 1
in covered dumpsters?
Yes ) No r Yes No
Are washout facilities A
(e.g., paint, stucco,/
8 concrete) available 1f
clearly marked, and
maintained? Yes No YesNo
Are vehicle and
equipment fueling,
cleaning, and
9 maintenance areas free
of spills, leaks, or any V
other deleterious
materials?Yes NO y £
1'
_ YesNo L -
Are materials that are
10 potential stormwater
contaminates stored /
Inside or under cover?
Yes ) w No Yes _ No t
Are non-stormwater
11 discharges (e.g., wash
water, dewatering)
properly controlled?
Yes ti_ No Yes No
12
(Other)
Yes No
Yes 0 No
Describe any incident of non-compliance not described above?
CERTIFICATION.STATEMENT
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel property gathered and evaluated the information
submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and
imprisonment for knowing violations.
Print Name and Title: JAMES HOWE - DAM INSPECTOR
Signature: cz Date: /�
T I-7 L- - C I T Y. O F
COFFELL
-t4:
RAIN EVENT DATE:
A s
RAINFALL: r /
Sfnrmwater Chnetrn ar4l^n Cho P— —.+
255 PARKWAY } P.O.BOX 947( :Y COPPELL TX 75019 * T[L 972/4G2 0022 ;, FAX 972/304 3673
Generatf'riformation
Project Name
Modification To Northlake Dans
NPDES Tracking No.
TXR15002100
Location
Dallas TX
Date of Inspection
Ci- i - 2 c
Start/End Time
Z ,•
- 7 ; v
Inspector's Name:
James Howe
Inspector's Title:
Dam Inspector
Inspector's Contact Information:
972-607-5466
Inspector's Qualifications -
Describe present phase of
construction
Ongoing Maintenance
Type of inspection:
Regular ---Ire-storm
event
During storm event
Post -storm event
Weather Information
Has there been a storm event since the last inspection: Yes l/ No
if yes, provide: Storm Start Date & Time /- 7 - %
Storm Duration (hrs.) I I �? + Approximate amount of Precifpitation (ins.)
-;;Z
Weather at time of this inspection.
Clear Cloudy Rain
Snowing High Winds �fl Other
Sleet Fog
Temperature
Have any discharges occurred since the last inspection? Yes No
If yes, describe:
Are there any discharges at the time of inspection? Yes No
BMP
BMP installed ?
maintenance
Required? Corrective Action Needed and Notes
1 Slag Pile
Yes �; No Yes
2
Yes `_�No i Yes
LjNo ___t
3
Yes Yes
No
4
Yes_ -.--No_ YesNo
_
5
Yes No ? _; Yes
j � No _
6
Yes `_ No I Yes
t 3 No 7_
7
Yes (No i� I Yes
'- No �t
8
Yes ` No Yes
r No
9
Yes ''_,___JNo = Yes
f
10
Yes HNo ; Yes
No
11
Yes I I No
12
Yes -qNoi Yes
'tjNo 2
13
Yes ��No Yes
No
14
Yes ^2 No t' Yes
�No
15
Yes f—+ Yom
No ,
16
Yes No Yes
'!Nom
17
Yes No �; Yes
U No L
18
Yes No ui Yes
x No
19
Yes �y No ,I Yes
No
20
W7=1
255 PARKWAY } P.O.BOX 947( :Y COPPELL TX 75019 * T[L 972/4G2 0022 ;, FAX 972/304 3673
BMP/ Activity
Implemented
nance
Required?
CorrectiveAction Needed and Notes
Are all slopes and
1
disturbed areas not
actively being worked
Properly stabilized?
Yes No
Yes No ,
Are natural resource
areas (&&, streams,
2
wetlands, mature trees,
etc) protected with
barriers or similar BMPs?
YesN
Yes No
Are perimeter controls
and sediment barriers
3
adequately installed
(keyed into substrattand
sti and
maintained)?
Yes � No
Yes 1 No
Are discharge points and
4
receiving waters free of
any sediment deposits?
Yes No 9=—
Yes No � s
5
Are storm drain inlets
Properly protected?
✓
✓ ..
Yes L-4 No
Yex =_ c No
Is the construction exit
6
preventing sediment
..
being tracked into the
street?
=�
Yes No L===j
Yes No '
Is trash / litter from work
/I}'
7
areas colected and placed
in covered dumpsters?
Yes 6) No
Yes No
Are washm tfadlWes
8
(erg-, paint, stucco,
concrete) available
/ �q
/j / "f'
/
jy/ 14
dearly marked, and
� V���
k
maintained?
Yes No " y
Yes No
Are vehicle and
equipment fueling,
cleaning, and
J
/V /
9
maintenance areas free
of spilK leaks, or any
other deleterious
materials?
Yes No///���
Yes O dNo
Are materials that are
10
potential stormwater
contaminates stored
Inside or under cover?
Yes No L=j
f �'
Yes No
Are non-Aorrnwater
it
discharges (e 8•, wash
water, dewatering)
Properly controlled? Yes
y No Yes
No
Jf /AL
�12 (Other)
Yes t) No C) Yes No
arty incident of non-rnmpGanm rot desa%,d above?
COMFICATION. STATEMENT
" I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information
submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, induding the possibility of fine and
imprisonment for knowing violations.
Print Name and Title: JAMES HOWE - DAM INSPECTOR
Signature:
/ Date-
i
T I-7 8 • C I T y - o F
COFFELL
u
�-
RAIN EVENT DATE: �j' '. Z 4 F x• � � a� ': � s A RAINFALL: + 7�
255 PARKWAY * P•O.BOX Od7o * COPPELL TX '75o I9 n TCL 9721462 0022 x FAX 9721304 3673
Generatfriformation
Project Name
Modification To Nortttlake Dams
NPDESTradcing No.
TXRlSDDZIW
ocation
DaliasTX
Date of Inspection
C,,Z -
Start/End Time
Inspector's Name:
Jahtes Howe
Inspector's Title:
Dam Spector
Inspector's Contact Information:
972-607-5466
Inspector's Qualifications:
Describe present phase of
construction
Ongoing Maintenance
Type of Inspection:
Regular
Pre -storm event
Duringstorm event
Past -storm event
Weather Information
Has there been a storm event since the last inspection: Yes No
D Yes, provide: Storm Start Date & Time
Storm Duration (hrs.) Apprrnumate amount of Pretifpitation (ins.)
Weatherattime of this inspection?
Clear Cloudy Rain
Snowing High Winds F��_ Other
Sleet
Temperature
Fog
Have any charges occurred since the last inspection? Yes No
If yes, describe.
Are there MY dkdtarges at the time of inspection? Yes No
BMP
OW
BI1AP I ?
roe
Requi ? Corrective
Action Needed and Notes
1 Stag Pile
Yes V € No ; Yes
�--
z No �.v
4.
2
Yes No Yes
_ENO ---'
,
3
Yes No i Yes
5,J No
4kNo
No
5No
—� Yes
allo ==
6s'
-c
Yes Ey_sNo �lyp�
7
Yes { _ (No_i
8
Yes ?=N0 - =1 Yes
_ No i
9
Yes L No 1 Yes
f�y No
10
Yes No Yes
Lj No
11
Yes? Yes
. JINo 4�
12
Yes �;_:No i Yes
LJNo
13
YesNo 1I
No $ i
14
Yes �& No_�
J
?_ g No1.5
Yes (;-_ :No ` .tt Yes
16
Yes r__—tNo 'No
f-
17
Yes — No Yes
l~
Yes ;Yes
UNo19 i
20
Yes_ No Yes
Yes j No Yes
No
r_ -No
255 PARKWAY * P•O.BOX Od7o * COPPELL TX '75o I9 n TCL 9721462 0022 x FAX 9721304 3673
LIMnc Correa Ammon needed and Notes
Implemented -Required?
BMP/ A,ttivity
Are all slopes and
disturbed areas not
1 adivdy beingworked
€ V No Yes d I No ,
k�
perly stabilized? YYes"
Are nautral resource
-
areas (e.&, steams,
2 wedands, mature treesp
etc) protemd with
barriers or mfAtwa BMPs? Yes
�a
No Yew l No
Are perimntu controls
and sediment barriers
3 adequately installed
(keyed into substrate and
Yes
NoYes No
ti�
maintained)?
Are dischmBe points and
4 receiving waters free of
any segment depot?
Yes No
Yes
No
�� :._--'
.E �-�
Are storm drain inlets
5 propeft Prot
No Yes: No
Yes
is the mon exit
preventing sediment
...
6 beft tracked into the
street?plo
Yes No
Yes
istsaslt / iitterfrom work
n
`4 /�,-
7 areas aolected and placed
in covered dumpsters?Yes No Yes No
Are washoutfadlitiC5
stacco,
(�
(e.g., paint,
8 concrete) available
dearly marked, and
No Yes No
mairntamed?
Yes
Are vehide and
1
eqWpmentfuanS.
cleaning, and
9 Wince areas free
of splits, teaks, or any
outer deleterious
Yes No Yes No l�
materials?
Arenaaterialsdnatare
n ♦ Ln
/ V V� -1
I
pOumtW stormwater
fV
30 contaminates stored
inside or under cover?
Yg No Yes 0 No
Are non-stmmwater
discharges (e g•, wash
11 water, g)
ecomroued? No No
Yes
u rpmay A'r4a
Yes yes n No
s -be any incident of non-c-up1ianoe not d ate?
rut 4
CETWXATIOMSTATEMENT
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that quardled personnel properly gathered and evaluated the inf6r n don
submitted. Based on Mrj inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the ikon, the information udxnitted is, to the best of my knowledge and belief, true, accurate, and
cOmPlete• 1'unaware that thele are significant penalties for submitting false information, including the possibility of fine and
imprisonment for knowing violations.
Print Name and Title: 1ARAES HOWE - DAfA INSPECTOR
Signature:
Date:
RAIN EVENT DATE:
T 7-1 E C 1 T
Y - o F
C JPFELLL
� _ �'.. ;icy .... • moo/ ' •.�--r'> T
Stofmwmt,cw. -_-- ---
RAINFALL: y
-
FAX 972/304 3673
BMP/ Activity
Implemented
iviauitenance
Requited
CareNve Action Needed and Notes
Are all slopes and
1
disturbed areas not
actively being worked
edy stabilized?
Yes C21 No
Yes I=f No
Are natural resource
areas (e.&, streams,
2
wetlands, mature trees,
etc) protected with
barrtutrs or AffAlar amps?
Yes No
Yes No
Are perkneber controls
- --
.and
and moment barriers
3
adequately installed
{keyed into substrate and
maintained)?
Yes No
Yes = No
Are discharge points and
4
receiving waters free of
any sediment deposits?
_
Yes No
Yes
Are storm drain inlets
%No
5
property Pte?
Yes t a No CD
Yes: No CD
Is the construction exit
-
6
preventing sed-anent
.�
being tracked into the
street?�
--
No)
Yes' NoYes
is trash / litterfrom work
��
//�:� jq—
7
areas colected and placed
in covered dumpsters?
=1
No
Yes No
Yes
Are washoutfadHties
(e.g.. palM stucco,
jf f (/� --
g
concrete) available/A-)/4-
l (/ VV
dearly marked, and
.
rrwhtrained?
Yes No
Yes No
Are vehide and
eWgimentfuetim
deaning, and
/I
Al /y{
9
rrraoit areas free
ov
of Wigs. leaks, or any
otter deleterious
materials?
Yes No
g �
Yes § � (No
Are materials that are
11'
i sbormwater
P mwater
L�
/V
contaminates stored
Inside or under cover?
Yes ® No
Yes 0 No
Are non-stormwat er
it
discliaBes (eg', wash
water, dewatering)
properly controlled?
Yes =V"' No
Yes rD No
12 (t)ther} �ft
Yes � No � Yes � Plo
-be any incident of non aarrpGaaoe riot described above?
1/<
c nONSTAWMf+rr
„ 1 certify under Penalty of law that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel proped1t gathered and evaluated the information
subri"itted. Based on my inquiry of the person or persons who manage the system, or those persons direly responsible for
gathering the infonnatian, the inf-Mation submitted is, to the best of my knowledge and belief, hue, accurate, and
complete- 1 am aware that there are significant penalties for submitting false wformation, including the possibility of fine and
imprisonment for knowing violations.
Print Name and Title: JAMES 140VVE- DAM IINSPECrOR
Signature:
Date:
T H L- • C i T y- o F
CO"ELL
RAIN EVENT DATE• " iF '�v may' j`5 o C46,
• "I x' 4 RAINFALL: -5
StormwatPr Cnncn..r+:.,., CH— 0e..,..6
255 PARKWAY $ p_O_BOX 9470 ;7 COPPELL TX 75019 * T[L 972l4G2 0022 ;; FAX 972(304 3G73
Generalfriformation
Protect Name
Modification To Northlake Dams
NPMTradaing No.
TXRIM22W
�
Date of Inspection
7 ~/
start/End Trane _ 2'? -I� or.,uc
Inspector's Name:
lames Howe
Inspectors Title:
Dam Impector
Inspector's Contact Information:
972-607-5466
Inspector's Qualifications:
Describe present phase of
construction
Ongoing Maintenance
Type of hispettion:
Regular
Pre storm event
During storm event Poststorm event
Weather Information
Has there been a storm event since the Fast imspection: Yes No
If yes, wevide: Storm Start Date & Tune C ...2 L -1 V-
Storn Duration (hrs.) AppiuWak- a amount of PreciWtation (iris-) 3' -/--
'-,i,.Weather
Weather at time of this inspection?
Clear Cloudy Rain
Snowing Nigh Winds FOther
Sleet Fog
Temperature
Have acq+Frarges owared since the last inspection? Yes No
If yes, describe:
Are there any discfrargaes at the time of inspection? No
gMP
BMP Installed ?
Requi Cwnective Action Needed and Notes
1 Slag Pile
Yes €NO Yes
2
Yes X440 4—^I Yes
LjN0
3
4_i
Yes L� No 1 Yes
.. Yes
—
LNo t '
5
Yes `�Np Yes
Yes Yes
7
Yes _No Yes
_ SNo
8
Yes_—_No Yes
9
Yes 'r'. _ �jNo Yes
i 'No a!
10
Yes k-,3No ' Yes
UNo ). i
11
Yes _-'No -16s,
12
Yes k_ ---- Ylo 1 Yes
Et_jNo
13
Yes z, NO f Yes
No a i
14
Yes_, No Yes15
sNo
Yes { —.No a—; Yes
`S No
16
Yes -__,No L_! Yes
_ fNo
17
Yes 4 ._4No Yes
Yes r_ 'NO F` Yes
No _
19
Yes No; Yes
-
20-
Yes �_yNo _ 1 Yes
vNo
255 PARKWAY $ p_O_BOX 9470 ;7 COPPELL TX 75019 * T[L 972l4G2 0022 ;; FAX 972(304 3G73
BMP/ Activity
Implemented
Reqoneds
Coffective Action Needed and Notes
Are all slopes and
1 disturbed areas not
actively being wort mt
Y stabilized?
Yes I v e No ED
Yes =1 No �
Are natural resource
--
areas (e g., streams,
2 wetlands, mature trees,
etc) protected with
barriers or sirrow amps?
/
Yes NO 3
Yes a No
a
Are Perimeteroontrok
and sediment bartiers
3 adequately installed
(keyed into substrate and
maintained)?
Yes CZ No
Yes = No
Are discharge points and
4 receiving +eaters free of
any sediment deposits?
YesI N^^o
Yes � No .
Are storm drain inlets
^ P�
5
PMP" protected?
Yes No
Yes=O--) No
Is the construction exit
6 ping sediment
.,
being tracked into the
=
Yes No
Yes Li 140
Is trash /liter from work
7 areas cnlected and placed
In covered dnmpsters?
Yes Igo 0
Yes 0No
Are wagtontfadfities
(e -g-. paint, sww,
8 concrete) available
/
dearly marked, and
maintained?
Yes No
; _-
Yes 0 No
Are vehicle and
equipment fueling,
deaninzand
9 maintenance areas free
Of spills„ leaks, or any
other deleterious
materials?
Yes No C1
Yes ONO LO
Are materials that are
10 Pel stormwater
►'7
I
contaminates stored
Inside or under toyer?
Yes No 1=)
Yes ' No
Li
Are non-skwanapater
11 discharges (e -g•, wash
water, dewatering)
Properly cantrotted?
Yes
> No Yes
i 3 No C
12 /V
Yes ON,_O Yes pia
Qibe any incident of root domed above?
COMWATIONMATEMENT
" i certify ander Pwaft of law that this document and all attachments were prepared under my direction or supervision in
accordance with a system des Med to assure that qualms personnel poly glad and evaluated the information
submitted. Based On my inquiry of the person Or persons who manage the system, or those persons d1recay responsible for
ga"g the information. the information sWunitted is, to the best of my knowledge and belief, true, accurate, and
complete. 1 am aware that there are significant penaltiO, for suba",g fad information, including the possibi ty of fine and
imprisonment for knowing violations.
Print Name and Title_ JAMES HOWE - DAM INSPECTOR
Signature: