Gateway BP(1.4)-CS180810 T H E G I T Y O F
COPPELL
A S , 8
Juan Hernandez August 10, 2018
Kajima Building& Design Group
1431 Greenway Dr. Ste 740
Irving, Texas 75038
RE: Final Acceptance Letter
Haverty's
Dear Mr. Hernandez:
Representatives of the City of Coppell have confirmed a final inspection of paving and
utilities for the referenced project. The two-year maintenance bonds have been received.
Maturity on the bonds will be two years from the date of this letter. Maturity on the
Erosion Control Bond LC will also be two years from the date of this letter.
You may notify MS4 (City of Coppell) at any time during the two-year maintenance
period if stabilization of the site per the SWPPP permit can be demonstrated. If so,
complete and submit a Notice of Termination (NOT) to discontinue coverage under the
SWPPP permit.
A follow up inspection of the facilities will be conducted prior to the lapse of the two-
year bond period. If any punch list items are noted at that time, you will be contacted to
make repairs.
Sincerely,
Marcus Mari
Construction Inspector II
Office Phone: (972) 304-3684
Fax: (972) 304-3570
cc:
Kent Collins, P.E., Director of Public Works
Michael Garza, P.E., Assistant Director of Public Works
Suzanne Arnold, Chief Building Official
Tim Oates, Deputy Fire Chief
Jennifer Miller, Finance Director
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673