Loading...
ST1501A-CS180716 1723 - Freeport Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendar20182019 DurationDuration rMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDec 349286009-Apr-18 14-Oct-191723 - Freeport 1723 1723 - Freeport- A A1000Project Start0009-Apr-187 Dayroject Start A1320Duration530455009-Apr-1814-Oct-197 Day A1530Bridge ROW Issue0009-Apr-1825-Apr-18 7 Day A1600Project Time Charges523455009-Apr-1814-Oct-197 Day A1330Milestone 1190123526-Apr-1815-Nov-187 Day A1670Start Time Charges0026-Apr-187 DayStart Time Charges A1340Milestone 212412416016-Nov-1820-Mar-197 Day A1350Milestone 31461461522-Mar-1915-Aug-197 Day A1020Project Finish00014-Oct-197 DayProject Finish 69131709-Apr-1816-Jul-185 DayStage 1 StagStage 1e 9009-Apr-1827-Apr-18 5 DayWater WaterWater A165Sawcut for Removals - Water Line & Detour3009-Apr-1811-Apr-18 5 Day A155Water Line 45+80 to 48+256012-Apr-1817-Apr-18 5 Day A138Crossing @ 44+703018-Apr-1818-Apr-18 5 Day A137Crossing @36+164019-Apr-1825-Apr-18 5 Day A136Crossing @ 28+263026-Apr-1827-Apr-18 5 Day 69131712-Apr-1816-Jul-185 DayTCP Setup Stage 2 TCP TCP Setup Stage 2S A166Sawcut for Removals - Bridge Sidewalk1012-Apr-1820-Apr-18 5 Day A105Remove Sidewalk SB5023-Apr-1815-May-185 Day A260Railroad Crossing Arm Delay15026-Apr-1825-Jun-18 5 Day A107Remove Bridge Median1015-May-1815-May-185 Day A109Removals - Detours1016-May-1816-May-185 Day A110Install Stage Detours3016-May-1818-May-185 Day A108Set & Pin PCTB - Demo Edge2021-May-1821-May-185 Day A161Railroad Install Temp Crossing Arms0027-Jun-18 5 DayRailroad Install Temp Crossing Arms A106Set PCTB - Center Stripe11116-Jul-1816-Jul-185 DaySet PCTB - Center Stripe 00216-Jul-1816-Jul-185 DayStorm Drain StorStorm Drainm A139Storm Drain Rehab @ 17+2300216-Jul-1816-Jul-185 DayStorm Drain Rehab @ 17+23 1168120617-May-1815-Nov-18Stage 2 - NB Dividend to Bethel StagStage 2 - NB Dividend to Bethele A1620Switch Traffic to Stage 21021-May-1821-May-185 Day A1630Remove Concrete Pavement & Sidewalk - South of RR8025-May-1813-Jun-18 5 Day A2420Complete Pavement Removal North of RR3026-Jun-1813-Jul-18 A5 Day 2017-May-1818-May-185 DaySanitary Sewer SanitSanitary Sewera A149Install SS @ 26+56 w/ Temp Connection2017-May-1818-May-185 Day 5757317-Jul-1804-Oct-185 DayStorm Drain StorStorm Drainm A150Storm Drain Impovements NB334917-Jul-1820-Jul-185 DayStorm Drain Impovements NB A186Complete Inlet Tops after Paving88325-Sep-1804-Oct-185 DayComplete Inlet Tops after Paving 713428422-May-1830-Aug-185 DayWater Line WateWater Liner A140Steel Casing 23+81 to 26+1616022-May-1823-May-185 Day A144Install 16" Main in Bore3024-May-1824-May-185 Day Remaining Level of EffortActual WorkCritical Remaining Work Page 1 of 7 Run Date 16-Jul-18 Actual Level of EffortRemaining WorkMilestone Data Date 16-Jul-18 Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendar20182019 DurationDuration rMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDec A143Install 16" Main 27+13 to 36+168025-May-1806-Jun-18 5 Day A164Install 16" Main 36+16 to 45+807007-Jun-1822-Jun-18 5 Day A142Install 16" Main 19+00 to 23+104026-Jun-1810-Jul-18 A5 Day A303Test Line A52111-Jul-18 A17-Jul-185 DayTest Line A A169Install 20" Waterline on Southwestern111128416-Jul-18 A27-Aug-185 DayInstall 20" Waterline on Southwestern A145Install Hydrants, Crossings, etc 19+00 to45+8044118-Jul-1823-Jul-185 DayInstall Hydrants, Crossings, etc 19+00 to45+80 A141Install Hydrants, Crossing, etc Dividend to 19+006630624-Jul-1831-Jul-185 DayInstall Hydrants, Crossing, etc Dividend to 19+00 A146Connect to Existing @ 19+0811124-Jul-1824-Jul-185 DayConnect to Existing @ 19+08 A147Finish Connecting Services22125-Jul-1827-Jul-185 DayFinish Connecting Services A148Grout Existing Water Line1010127-Jul-1810-Aug-185 DayGrout Existing Water Line A170Replace Pavement on Southwestern3328427-Aug-1830-Aug-185 DayReplace Pavement on Southwestern 94622024-May-1819-Oct-18Bridge BridgeBridge A103Demo Existing Bridge5024-May-1815-Jun-18 5 Day A261Drill Sub Mobilization10019-Jun-1820-Jun-18 5 Day A111Drill Shafts4021-Jun-1822-Jun-18 5 Day A156Drill Shaft Utility Conflict1143323-Jun-1831-Jul-187 DayDrill Shaft Utility Conflict A104Grading Proposed Bridge112317-Jul-1817-Jul-185 DayGrading Proposed Bridge A296Complete Drill Shafts552301-Aug-1807-Aug-185Complete Drill Shafts Wki A112Bent 2 Columns222208-Aug-1809-Aug-185 DayBent 2 Columns A118Drill Shaft Cure333308-Aug-1811-Aug-187 DayDrill Shaft Cure A113Bent 3 Columns222209-Aug-1813-Aug-185 DayBent 3 Columns A119Bent 2 Column Cure333909-Aug-1812-Aug-187 DayBent 2 Column Cure A114Abut 1 Cap222213-Aug-1815-Aug-185 DayAbut 1 Cap A120Bent 3 Column Cure333913-Aug-1816-Aug-187 DayBent 3 Column Cure A115Abut 4 Cap222215-Aug-1817-Aug-185 DayAbut 4 Cap A121Abut 1 Cap Cure334515-Aug-1818-Aug-187 DayAbut 1 Cap Cure A122Abut 4 Cap Cure334218-Aug-1821-Aug-187 DayAbut 4 Cap Cure A116Bent 2 Cap222220-Aug-1822-Aug-185 DayBent 2 Cap A168Install CTB @ Abutments334520-Aug-1823-Aug-185 DayInstall CTB @ Abutments A117Bent 3 Cap222222-Aug-1824-Aug-185 DayBent 3 Cap A123Bent 2 Cap Cure333822-Aug-1825-Aug-187 DayBent 2 Cap Cure A124Bent 3 Cap Cure333524-Aug-1827-Aug-187 DayBent 3 Cap Cure A151Install Riprap Under New Bridge332224-Aug-1829-Aug-185 DayInstall Riprap Under New Bridge A125Set Beams112230-Aug-1830-Aug-185 DaySet Beams A126Set Overhang11112203-Sep-1818-Sep-185 DaySet Overhang A127Install Precast Panels & PMD442218-Sep-1824-Sep-185 DayInstall Precast Panels & PMD A128Tie Deck Steel222224-Sep-1825-Sep-185 DayTie Deck Steel A129Pour Deck112225-Sep-1826-Sep-185 DayPour Deck A130Cure Deck883226-Sep-1804-Oct-187 DayCure Deck A131Install Ped Rail on Deck w/ Conduit10102204-Oct-1819-Oct-185 DayInstall Ped Rail on Deck w/ Conduit 8181316-Jul-18 A15-Nov-18Roadway RoadRoadway A171Balance Subgrade 1+55 to 36+0099116-Jul-18 A27-Jul-185 DayBalance Subgrade 1+55 to 36+00 A196Retaining Wall 45+51 to 48+2411114716-Jul-1831-Jul-185 DayRetaining Wall 45+51 to 48+24 A239Balance Subgrade 36+00 to 67+6899130-Jul-1809-Aug-185 DayBalance Subgrade 36+00 to 67+68 A197Retaining Wall 63+82 to 65+15664731-Jul-1807-Aug-185 DayRetaining Wall 63+82 to 65+15 A172Fine Grade Subgrade66110-Aug-1817-Aug-185 DayFine Grade Subgrade A1734" HMAC Ty B88120-Aug-1829-Aug-185 Day4" HMAC Ty B A174Tie Steel - Paving Pass 155130-Aug-1806-Sep-185 DayTie Steel - Paving Pass 1 Remaining Level of EffortActual WorkCritical Remaining Work Page 2 of 7 Run Date 16-Jul-18 Actual Level of EffortRemaining WorkMilestone Data Date 16-Jul-18 Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendar20182019 DurationDuration rMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDec A180Paving - Pass 133106-Sep-1811-Sep-185 DayPaving - Pass 1 A175Tie Steel - Paving Pass 255111-Sep-1818-Sep-185 DayTie Steel - Paving Pass 2 A187Cure Paving - Pass 133511-Sep-1814-Sep-187 DayCure Paving - Pass 1 A178Tie Steel - 2nd Half Cross Streets223117-Sep-1819-Sep-185 DayTie Steel - 2nd Half Cross Streets A176Tie Steel - Turn Lanes (13 turn lanes)22918-Sep-1821-Sep-185 DayTie Steel - Turn Lanes (13 turn lanes) A181Paving - Pass 233118-Sep-1821-Sep-185 DayPaving - Pass 2 A182Pave - Turn Lanes22921-Sep-1825-Sep-185 DayPave - Turn Lanes A188Cure Paving - Pass 233321-Sep-1824-Sep-187 DayCure Paving - Pass 2 A189Cure - Turn Lanes331125-Sep-1828-Sep-187 DayCure - Turn Lanes A177Tie Steel - 1st Half Cross Streets221628-Sep-1802-Oct-185 DayTie Steel - 1st Half Cross Streets A183Pave - 1st Half Cross Streets221603-Oct-1805-Oct-185 DayPave - 1st Half Cross Streets A195Backfill Pavement33305-Oct-1809-Oct-185 DayBackfill Pavement A190Cure - 1st Half Intersections332405-Oct-1808-Oct-187 DayCure - 1st Half Intersections A184Pave - 2nd Half Cross Streets221808-Oct-1810-Oct-185 DayPave - 2nd Half Cross Streets A198Grade for Sidewalk1212310-Oct-1825-Oct-185 DayGrade for Sidewalk A191Cure 2nd Half Intersections332611-Oct-1814-Oct-187 DayCure 2nd Half Intersections A193Install Colored Stamped Concrete552211-Oct-1817-Oct-185 DayInstall Colored Stamped Concrete A179Tie Steel - Driveways221915-Oct-1817-Oct-185 DayTie Steel - Driveways A185Pave - Driveways331917-Oct-1822-Oct-185 DayPave - Driveways A194Cure Stamped Concrete333117-Oct-1820-Oct-187 DayCure Stamped Concrete A192Cure - Driveways332622-Oct-1825-Oct-187 DayCure - Driveways A199Pave Sidewalk & Trail88326-Oct-1806-Nov-185 DayPave Sidewalk & Trail A200Backfill Sidewalk & Trail22307-Nov-1808-Nov-185 DayBackfill Sidewalk & Trail A201Grass & Landscape Outside55308-Nov-1815-Nov-185 DayGrass & Landscape Outside 8383816-Jul-1808-Nov-185 DayRailroad RailrRailroado A157Railroad Installed Ped Crossing Arms NB118816-Jul-1816-Jul-185 DayRailroad Installed Ped Crossing Arms NB A158Connect Pavement NB223725-Sep-1827-Sep-185 DayConnect Pavement NB A159Build Sidewalk at RR Crossing NB22807-Nov-1808-Nov-185 DayBuild Sidewalk at RR Crossing NB 441025-Sep-1828-Sep-185 DayTraffic Signals TraffiTraffic Signals A152Signal Drill Shafts at Southwestern NB221025-Sep-1826-Sep-185 DaySignal Drill Shafts at Southwestern NB A154Install Conduit from NB Corners w/ Pull Boxes221026-Sep-1828-Sep-185 DayInstall Conduit from NB Corners w/ Pull Boxes 60601315-Nov-1824-Feb-19Stage 3A - SB Dividend to Fritz StagStage 3A - SB Dividend to Fritze A3840Switch Traffic to Stage 3A11315-Nov-1816-Nov-185 DaySwitch Traffic to Stage 3A A3890Remove Concrete Pavement22816-Nov-1820-Nov-185 DayRemove Concrete Pavement 994621-Nov-1805-Dec-185 DayWater WaterWater A228Remove & Replace Existing Hydrants334621-Nov-1823-Nov-185 DayRemove & Replace Existing Hydrants A229Complete Crossing @ 13+60224626-Nov-1827-Nov-185 DayComplete Crossing @ 13+60 A230Complete Crossing @ 16+05224628-Nov-1803-Dec-185 DayComplete Crossing @ 16+05 A231Complete Crossing @ 22+68224604-Dec-1805-Dec-185 DayComplete Crossing @ 22+68 36361306-Dec-1829-Jan-195 DayStorm Drain StorStorm Drainm A240Storm Drain Impovements SB224606-Dec-1807-Dec-185 DayStorm Drain Impovements SB A241Complete Inlet Tops after Paving221325-Jan-1929-Jan-195 DayComplete Inlet Tops after Paving 2626321-Nov-1802-Jan-195 DaySanitary Sewer SanitSanitary Sewera A236Install SS 32+33 to 23+8988821-Nov-1804-Dec-185 DayInstall SS 32+33 to 23+89 A232Drill Shafts for Aerial SS Crossing33323-Nov-1828-Nov-185 DayDrill Shafts for Aerial SS Crossing A233Columns for Aerial SS Crossing33328-Nov-1805-Dec-185 DayColumns for Aerial SS Crossing A234Caps for Aerial SS Crossing22305-Dec-1807-Dec-185 DayCaps for Aerial SS Crossing Remaining Level of EffortActual WorkCritical Remaining Work Page 3 of 7 Run Date 16-Jul-18 Actual Level of EffortRemaining WorkMilestone Data Date 16-Jul-18 Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendar20182019 DurationDuration rMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDec A235Casing for Aerial SS Crossing33307-Dec-1812-Dec-185 DayCasing for Aerial SS Crossing A237Install SS 23+89 to 17+3988312-Dec-1824-Dec-185 DayInstall SS 23+89 to 17+39 A238Rehab Existing SS Manholes55324-Dec-1802-Jan-195 DayRehab Existing SS Manholes 55551816-Nov-1818-Feb-19Bridge BridgeBridge A203Demo Existing Bridge55316-Nov-1823-Nov-185 DayDemo Existing Bridge A204Grading Proposed Bridge112123-Nov-1826-Nov-185 DayGrading Proposed Bridge A205Drill Shafts552126-Nov-1805-Dec-185 DayDrill Shafts A206Bent 2 Columns222105-Dec-1806-Dec-185 DayBent 2 Columns A220Drill Shaft Cure333305-Dec-1808-Dec-187 DayDrill Shaft Cure A207Bent 3 Columns222107-Dec-1810-Dec-185 DayBent 3 Columns A221Bent 2 Column Cure333807-Dec-1810-Dec-187 DayBent 2 Column Cure A208Abut 1 Cap222110-Dec-1812-Dec-185 DayAbut 1 Cap A222Bent 3 Column Cure333910-Dec-1813-Dec-187 DayBent 3 Column Cure A209Abut 4 Cap222113-Dec-1817-Dec-185 DayAbut 4 Cap A223Abut 1 Cap Cure334513-Dec-1816-Dec-187 DayAbut 1 Cap Cure A210Bent 2 Cap222117-Dec-1819-Dec-185 DayBent 2 Cap A224Abut 4 Cap Cure334017-Dec-1820-Dec-187 DayAbut 4 Cap Cure A219Install CTB @ Abutments333917-Dec-1820-Dec-185 DayInstall CTB @ Abutments A211Bent 3 Cap222119-Dec-1824-Dec-185 DayBent 3 Cap A225Bent 2 Cap Cure333819-Dec-1822-Dec-187 DayBent 2 Cap Cure A226Bent 3 Cap Cure333324-Dec-1827-Dec-187 DayBent 3 Cap Cure A218Install Riprap Under New Bridge442124-Dec-1831-Dec-185 DayInstall Riprap Under New Bridge A212Set Beams112131-Dec-1802-Jan-195 DaySet Beams A213Set Overhang662102-Jan-1909-Jan-195 DaySet Overhang A214Install Precast Panels & PMD552109-Jan-1916-Jan-195 DayInstall Precast Panels & PMD A215Tie Deck Steel222116-Jan-1918-Jan-195 DayTie Deck Steel A216Pour Deck112118-Jan-1921-Jan-195 DayPour Deck A227Cure Deck882921-Jan-1929-Jan-197 DayCure Deck A217Install Ped Rail on Deck w/ Conduit10102129-Jan-1912-Feb-195 DayInstall Ped Rail on Deck w/ Conduit A202Form & Pour West Sidewalk & Median442112-Feb-1918-Feb-195 DayForm & Pour West Sidewalk & Median 5757321-Nov-1824-Feb-19Roadway RoadRoadway A243Balance Subgrade662421-Nov-1803-Dec-185 DayBalance Subgrade A244Fine Grade Subgrade22402-Jan-1903-Jan-195 DayFine Grade Subgrade A2454" HMAC Ty B33304-Jan-1909-Jan-195 Day4" HMAC Ty B A246Tie Steel - Paving Pass 122309-Jan-1911-Jan-195 DayTie Steel - Paving Pass 1 A252Paving - Pass 122311-Jan-1915-Jan-195 DayPaving - Pass 1 A247Tie Steel - Paving Pass 222315-Jan-1916-Jan-195 DayTie Steel - Paving Pass 2 A266Cure Paving - Pass 133415-Jan-1918-Jan-197 DayCure Paving - Pass 1 A248Tie Steel - Turn Lanes22317-Jan-1921-Jan-195 DayTie Steel - Turn Lanes A253Paving - Pass 222218-Jan-1922-Jan-195 DayPaving - Pass 2 A254Pave - Turn Lanes22222-Jan-1924-Jan-195 DayPave - Turn Lanes A267Cure Paving - Pass 2331922-Jan-1925-Jan-197 DayCure Paving - Pass 2 A268Cure - Turn Lanes33324-Jan-1927-Jan-197 DayCure - Turn Lanes A259Backfill Pavement221524-Jan-1925-Jan-195 DayBackfill Pavement A249Tie Steel - 1st Half Cross Streets11228-Jan-1928-Jan-195 DayTie Steel - 1st Half Cross Streets A255Pave - 1st Half Cross Streets22229-Jan-1930-Jan-195 DayPave - 1st Half Cross Streets A262Grade for Sidewalk441329-Jan-1904-Feb-195 DayGrade for Sidewalk A269Cure - 1st Half Intersections33331-Jan-1903-Feb-197 DayCure - 1st Half Intersections Remaining Level of EffortActual WorkCritical Remaining Work Page 4 of 7 Run Date 16-Jul-18 Actual Level of EffortRemaining WorkMilestone Data Date 16-Jul-18 Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendar20182019 DurationDuration rMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDec A250Tie Steel - 2nd Half Cross Streets11204-Feb-1904-Feb-195 DayTie Steel - 2nd Half Cross Streets A263Pave Sidewalk221304-Feb-1905-Feb-195 DayPave Sidewalk A251Tie Steel - Driveways221105-Feb-1906-Feb-195 DayTie Steel - Driveways A256Pave - 2nd Half Cross Streets22205-Feb-1906-Feb-195 DayPave - 2nd Half Cross Streets A264Backfill Sidewalk111306-Feb-1906-Feb-195 DayBackfill Sidewalk A257Pave - Driveways221007-Feb-1908-Feb-195 DayPave - Driveways A270Cure 2nd Half Intersections33307-Feb-1910-Feb-197 DayCure 2nd Half Intersections A265Grass & Landscape Outside221307-Feb-1908-Feb-195 DayGrass & Landscape Outside A271Cure - Driveways331608-Feb-1911-Feb-197 DayCure - Driveways A258Install Colored Stamped Concrete88211-Feb-1920-Feb-195 DayInstall Colored Stamped Concrete A272Cure Stamped Concrete33321-Feb-1924-Feb-197 DayCure Stamped Concrete 22302-Jan-1904-Jan-195 DayLighting LightLightingi A285Install Conduit Between Medians22302-Jan-1904-Jan-195 DayInstall Conduit Between Medians 454510025-Feb-1907-May-19Stage 3B - Median Dividend to Airline StagStage 3B - Median Dividend to Airlinee A3850Switch Traffic to Stage 3B11325-Feb-1925-Feb-195 DaySwitch Traffic to Stage 3B A3900Remove Concrete Pavement11326-Feb-1926-Feb-195 DayRemove Concrete Pavement 131310327-Feb-1922-Mar-19Roadway RoadRoadway A273Balance & Fine Grade Subgrade22327-Feb-1928-Feb-195 DayBalance & Fine Grade Subgrade A2744" HMAC Ty B11328-Feb-1901-Mar-195 Day4" HMAC Ty B A275Tie Steel - Paving Pass 122301-Mar-1905-Mar-195 DayTie Steel - Paving Pass 1 A278Pave - Pass 111305-Mar-1906-Mar-195 DayPave - Pass 1 A276Tie Steel - Paving Pass 222306-Mar-1907-Mar-195 DayTie Steel - Paving Pass 2 A281Cure Pass 133306-Mar-1909-Mar-197 DayCure Pass 1 A279Pave - Pass 211111-Mar-1911-Mar-195 DayPave - Pass 2 A277Tie Steel - Paving Pass 322112-Mar-1913-Mar-195 DayTie Steel - Paving Pass 3 A282Cure Pass 23316512-Mar-1915-Mar-197 DayCure Pass 2 A280Pave - Pass 311113-Mar-1914-Mar-195 DayPave - Pass 3 A283Cure Pass 333114-Mar-1917-Mar-197 DayCure Pass 3 A284Colored Stamped Median Pavement2211220-Mar-1922-Mar-195 DayColored Stamped Median Pavement 55627-Feb-1911-Mar-19Lighting LightLightingi A286Install Illumination Drill Shafts (15 ea)22627-Feb-1901-Mar-195 DayInstall Illumination Drill Shafts (15 ea) A287Complete Conduit22801-Mar-1904-Mar-195 DayComplete Conduit A289Cure Illumination Drill Shafts66801-Mar-1906-Mar-197 DayCure Illumination Drill Shafts A288Set Illumination & Wiring22607-Mar-1911-Mar-195 DaySet Illumination & Wiring 383811214-Mar-1907-May-195 DayLandscaping LandLandscapings A290Install Irrigation System4411214-Mar-1920-Mar-195 DayInstall Irrigation System A291Install Landscape Borders2211222-Mar-1926-Mar-195 DayInstall Landscape Borders A292Install Landscaping181811226-Mar-1919-Apr-195 DayInstall Landscaping A293Install City Monument121211219-Apr-1907-May-195 DayInstall City Monument 97971118-Mar-1915-Aug-19Stage 4A - SB Fritz to Bethel StagStage 4A - SB Fritz to Bethele A3860Switch Traffic to Stage 4A11118-Mar-1918-Mar-195 DaySwitch Traffic to Stage 4A A3910Remove Concrete Pavement88119-Mar-1928-Mar-195 DayRemove Concrete Pavement 66129-Mar-1908-Apr-195 DaySanitary Sewer SanitSanitary Sewera A294Install SS @ Southwestern44129-Mar-1903-Apr-195 DayInstall SS @ Southwestern A295Complete SS Rehab Work22104-Apr-1908-Apr-195 DayComplete SS Rehab Work 58582008-Apr-1927-Jun-195 DayStorm Drain StorStorm Drainm Remaining Level of EffortActual WorkCritical Remaining Work Page 5 of 7 Run Date 16-Jul-18 Actual Level of EffortRemaining WorkMilestone Data Date 16-Jul-18 Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendar20182019 DurationDuration rMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDec A308Storm Drain Impovements SB55108-Apr-1915-Apr-195 DayStorm Drain Impovements SB A309Complete Inlet Tops after Paving332024-Jun-1927-Jun-195 DayComplete Inlet Tops after Paving 3838129-Mar-1921-May-195 DayWater Line WateWater Liner A311Bore Casing Under Railroad (102 LF)1010529-Mar-1911-Apr-195 DayBore Casing Under Railroad (102 LF) A310Complete SB Water Connections 28+26 to 45+8022115-Apr-1917-Apr-195 DayComplete SB Water Connections 28+26 to 45+80 A312Install 16" Water Main 45+80 to 67+681515117-Apr-1908-May-195 DayInstall 16" Water Main 45+80 to 67+68 A314Connect to Existing @ 67+6811108-May-1909-May-195 DayConnect to Existing @ 67+68 A313Complete Connections North of 45+8022109-May-1913-May-195 DayComplete Connections North of 45+80 A315Remove/Grout Existing Water Line66114-May-1921-May-195 DayRemove/Grout Existing Water Line 89891129-Mar-1915-Aug-19Roadway RoadRoadway A320Balance Subgrade10103029-Mar-1911-Apr-195 DayBalance Subgrade A321Fine Grade Subgrade33122-May-1927-May-195 DayFine Grade Subgrade A3224" HMAC Ty B66127-May-1905-Jun-195 Day4" HMAC Ty B A323Tie Steel - Paving Pass 133105-Jun-1910-Jun-195 DayTie Steel - Paving Pass 1 A329Paving - Pass 133110-Jun-1913-Jun-195 DayPaving - Pass 1 A324Tie Steel - Paving Pass 233113-Jun-1918-Jun-195 DayTie Steel - Paving Pass 2 A343Cure Paving - Pass 133313-Jun-1916-Jun-197 DayCure Paving - Pass 1 A325Tie Steel - Turn Lanes (6 turn lanes)22218-Jun-1920-Jun-195 DayTie Steel - Turn Lanes (6 turn lanes) A330Paving - Pass 233118-Jun-1921-Jun-195 DayPaving - Pass 2 A331Pave - Turn Lanes33121-Jun-1926-Jun-195 DayPave - Turn Lanes A344Cure Paving - Pass 2332921-Jun-1924-Jun-197 DayCure Paving - Pass 2 A345Cure - Turn Lanes33126-Jun-1929-Jun-197 DayCure - Turn Lanes A326Tie Steel - 1st Half Cross Streets22001-Jul-1903-Jul-195 DayTie Steel - 1st Half Cross Streets A336Backfill Pavement441101-Jul-1905-Jul-195 DayBackfill Pavement A332Pave - 1st Half Cross Streets33003-Jul-1909-Jul-195 DayPave - 1st Half Cross Streets A337Install Gabions @ 61+80331108-Jul-1911-Jul-195 DayInstall Gabions @ 61+80 A346Cure - 1st Half Intersections33009-Jul-1912-Jul-197 DayCure - 1st Half Intersections A339Grade for Sidewalk10101111-Jul-1924-Jul-195 DayGrade for Sidewalk A327Tie Steel - 2nd Half Cross Streets22012-Jul-1916-Jul-195 DayTie Steel - 2nd Half Cross Streets A328Tie Steel - Driveways222417-Jul-1919-Jul-195 DayTie Steel - Driveways A333Pave - 2nd Half Cross Streets33017-Jul-1919-Jul-195 DayPave - 2nd Half Cross Streets A334Pave - Driveways332419-Jul-1924-Jul-195 DayPave - Driveways A347Cure 2nd Half Intersections33020-Jul-1923-Jul-197 DayCure 2nd Half Intersections A335Install Colored Stamped Concrete1010023-Jul-1906-Aug-195 DayInstall Colored Stamped Concrete A348Cure - Driveways333424-Jul-1927-Jul-197 DayCure - Driveways A340Pave Sidewalk10101124-Jul-1907-Aug-195 DayPave Sidewalk A349Cure Stamped Concrete332106-Aug-1909-Aug-197 DayCure Stamped Concrete A341Backfill Sidewalk221107-Aug-1909-Aug-195 DayBackfill Sidewalk A342Grass & Landscape Outside441109-Aug-1915-Aug-195 DayGrass & Landscape Outside 93931629-Mar-1908-Aug-195 DayRailroad RailrRailroado A297Railroad Installed Concrete Panels SB1110729-Mar-1929-Mar-195 DayRailroad Installed Concrete Panels SB A298Railroad Installed Ped Crossing Arms SB1110729-Mar-1929-Mar-195 DayRailroad Installed Ped Crossing Arms SB A299Connect Pavement SB114526-Jun-1927-Jun-195 DayConnect Pavement SB A300Build Sidewalk at RR Crossing SB111607-Aug-1908-Aug-195 DayBuild Sidewalk at RR Crossing SB 11111423-Jul-1909-Aug-19Traffic Signals TraffiTraffic Signals A302Signal Drill Shafts at Southwestern SB221523-Jul-1924-Jul-195 DaySignal Drill Shafts at Southwestern SB A304Install Conduit from SB Corners w/ Pull Boxes221724-Jul-1929-Jul-195 DayInstall Conduit from SB Corners w/ Pull B Remaining Level of EffortActual WorkCritical Remaining Work Page 6 of 7 Run Date 16-Jul-18 Actual Level of EffortRemaining WorkMilestone Data Date 16-Jul-18 Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendar20182019 DurationDuration rMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDec A305Signal Drill Shaft Cure662124-Jul-1930-Jul-197 DaySignal Drill Shaft Cure A301Install Signal Poles & Wire881530-Jul-1909-Aug-195 DayInstall Signal Poles & Wire 339286009-Apr-1814-Oct-19Stage 4B - Median StagStage 4B - Median Airline to Bethele A3870Switch Traffic to Stage 4B111115-Aug-1916-Aug-195 DaySwitch Traffic to Stage 4B A3920Remove Concrete Pavement221116-Aug-1920-Aug-195 DayRemove Concrete Pavement 16162016-Aug-1910-Sep-19Bridge BridgeBridge A316Form & Pour NB Sidewalk222416-Aug-1919-Aug-195 DayForm & Pour NB Sidewalk A317Cure NB Sidewalk333320-Aug-1923-Aug-197 DayCure NB Sidewalk A318Form & Pour NB Traffic Rail10102323-Aug-1906-Sep-195 DayForm & Pour NB Traffic Rail A338Illumination and Banner Poles on Bridge222306-Sep-1910-Sep-195 DayIllumination and Banner Pole 3434020-Aug-1914-Oct-19Roadway RoadRoadway A363Balance & Fine Grade Subgrade221120-Aug-1921-Aug-195 DayBalance & Fine Grade Subgrade A3644" HMAC Ty B221122-Aug-1923-Aug-195 Day4" HMAC Ty B A365Tie Steel - Paving Pass 1111123-Aug-1926-Aug-195 DayTie Steel - Paving Pass 1 A368Pave - Pass 1111126-Aug-1927-Aug-195 DayPave - Pass 1 A366Tie Steel - Paving Pass 2111127-Aug-1928-Aug-195 DayTie Steel - Paving Pass 2 A372Cure Pass 1332627-Aug-1930-Aug-197 DayCure Pass 1 A373Cure Pass 2331528-Aug-1931-Aug-197 DayCure Pass 2 A369Pave - Pass 2111830-Aug-1902-Sep-195 DayPave - Pass 2 A367Tie Steel - Paving Pass 3111802-Sep-1903-Sep-195 DayTie Steel - Paving Pass 3 A370Pave - Pass 3111903-Sep-1904-Sep-195 DayPave - Pass 3 A374Cure Pass 3332603-Sep-1906-Sep-197 DayCure Pass 3 A350Tie Steel - Pass 4111904-Sep-1905-Sep-195 DayTie Steel - Pass 4 A351Pave Pass 4111809-Sep-1909-Sep-195 DayPave Pass 4 A352Cure Pass 4332410-Sep-1913-Sep-197 DayCure Pass 4 A383Colored Stamped Cross Walk221613-Sep-1917-Sep-195 DayColored Stamped Cross W A371Colored Stamped Median Pavement221617-Sep-1919-Sep-195 DayColored Stamped Median A382Permanent Striping55007-Oct-1914-Oct-195 DayPermanent Striping 1717802-Sep-1927-Sep-19Lighting LightLightingi A375Install Illumination Drill Shafts (27 ea)881002-Sep-1911-Sep-195 DayInstall Illumination Drill Shafts A376Complete Conduit441012-Sep-1917-Sep-195 DayComplete Conduit A378Cure Illumination Drill Shafts661512-Sep-1917-Sep-197 DayCure Illumination Drill Shaf A377Set Illumination & Wiring881018-Sep-1927-Sep-195 DaySet Illumination & Wiring 336286009-Apr-1814-Oct-19Landscaping LandLandscapings A388Duration530455009-Apr-1814-Oct-197 Day A379Install Irrigation System1212006-Aug-1922-Aug-195 DayInstall Irrigation System A380Install Landscape Borders88022-Aug-1903-Sep-195 DayInstall Landscape Borders A381Install Landscaping2424003-Sep-1907-Oct-195 DayInstall Landscaping Remaining Level of EffortActual WorkCritical Remaining Work Page 7 of 7 Run Date 16-Jul-18 Actual Level of EffortRemaining WorkMilestone Data Date 16-Jul-18