Loading...
Old Town Coppell-CS180621 _ r T H E • C I T Y • O F Kimie >>> Horn COPPELL T _ t o On-Street Bicycle Lane Design Coppell, Texas PROJECT DESIGN MEETING Meeting: Design Meeting#1 Date and Time of Meeting: 06/21/2018 11:00 AM Location: 265 Parkway Boulevard—Engineering Conference Room Coppell, Texas Attendees: John Elias City of Coppell George Marshall City of Coppell Jeff Whitacre Kimley-Horn John Fielder Kimley-Horn Paris Leavell Kimley-Horn 1. Review of Project Areas a. Moore Road: i. Andy Brown Park Entrance 1. 12' Travel Lanes/5' Median/12.5' Cycle Track ii. Andy Brown Park to Parkway Blvd 1. Section B-B a. 40' Clear(Curb-to-Curb) b. 13.5/Travel Lanes/3' Buffer/10' Cycle Track c. Question: On-Street parking along Moore Road to remain or be removed? i. Alternate: 7' On-Street Parking/10' Travel Lanes/3' Buffer/10' Cycle Track 2. Section C-C a. 41' Clear(Curb-to-Curb) b. 14/Travel Lanes/3' Buffer/10' Cycle Track c. Alternate: 8' On-Street Parking/10' Travel Lanes/3' Buffer/10' Cycle Track iii. Parkway Boulevard Intersection 1. Cycle Track/Bike Lane Transition 2. Remove existing turn-lane iv. Parkway Boulevard to Sandy Lake Road 1. Section D-D 1 a. 41' to 43' Clear(Curb-to-Curb) b. 10.5 to 11.5' Travel Lanes/3' Buffers/7' Bike Lanes v. Sandy Lake Intersection 1. Questions: a. Remove left turn lane? i. Take bike lane off-street ii. 5' Bike lane w/no buffer iii. Remove left turn lane vi. Sandy Lake Road to Briar Glen Drive 1. Section E-E a. 35' to 36' Clear(Curb-to-Curb) b. 10' to 10.5' Travel Lanes/3' Buffers/7' Bike Lanes vii. Briar Glen Drive to Carter Drive 1. Section F-F a. 33.5' to 35' Clear(Curb-to-Curb) b. 17.5' Travel Lanes/8' Side Paths c. 10' to 10.5' Travel Lanes/1.5' to 2' Buffers/5' Bike Lanes viii. Bethel School Road Intersection 1. Review Roundabout Option 2. Question: Take bike lanes off-street at Briar Glenn or at residential driveways? ix. Carter Drive to Belt Line Road 1. Section G-G a. 36' Clear(Curb-to-Curb) b. 10' Travel Lanes/2' Buffers/6' Bike Lakes c. Southbound Bike Lane — End (Bike Use Full Lane) at bridge d. Northbound Bike Lane— Start at E. Belt Line Road b. Riverchase Drive: i. Sandy Lake Intersection 1. Remove Turn Lane 2. Section A-A(Existing Median) a. 13' Travel Lanes/7' Bike Lanes/3' Buffers 3. Section B-B a. 42' to 46' Clear(Curb-to-Curb) b. 11' to 13' Travel Lanes/3' Buffers/7' Bike Lanes c. Question: Align bike lane striping w/existing joint? d. Question: Buffer along parkway at golf course? ii. Fairway Drive Intersection 1. Remove turn lanes iii. MacArthur Blvd Intersection 1. Remove right turn lane c. Fairway Drive: i. Riverchase Drive to RR Crossing 1. Section A-A 2 a. 35' Clear(Curb-to-Curb) b. 10' Travel Lanes/2' Buffers/5.5' Bike Lanes 2. RR Crossing a. 35' Clear(Curb-to-Curb) b. Transition to side path at multi-family entry drive c. Adjust curb ramp on east entry drive d. Heartz Road: i. Leave as-is ii. Provide 8' wide side path from Parkway Blvd to Sandy Lake 2. General Questions „ r, i. 4"or 6"for preferred centerline thickness?--- ii. 8"buttons for buffer or `armadillos'? .-1' e.yc Tom iii. Striping at curb inlet conflicts? 014- iv. Notes to repair damaged paving? ov- v. Carry bike lane striping through alley/driveways? 9g1e4 vi. Pylons for center of cycle track? ��` ' 'Y vii. Next Step for Presentations—Council or Public? 3. Next Steps/Remaining Schedule a. Design Review Meeting 1 —June 21, 2018 b. Presentations and Public Meetings i. Public Meeting—August/September 2018 ii. Council Presentation—August/September 2018 c. Final Design—November 7, 2018 d. Bidding/Construction—December 2018 to May 2019 N 3