ST1501A-CS180806 (2)
1723 - Freeport 020 Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendar20182019 DurationDuration Jan MayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDec 362292009-Apr-18 01-Nov-191723 - Freeport 1723 1723 - Freeport- A A1000Project Start0009-Apr-187 Dayroject Start A1320Duration530464009-Apr-1801-Nov-197 Day A1530Bridge ROW Issue0009-Apr-1825-Apr-18 7 Day A1600Project Time Charges523464009-Apr-1801-Nov-197 Day A1330Milestone 1190136626-Apr-1807-Dec-187 Day A1670Start Time Charges0026-Apr-187 DayStart Time Charges A1340Milestone 212112115910-Dec-1810-Apr-197 Day A1350Milestone 31451451312-Apr-1904-Sep-197 Day A1020Project Finish00001-Nov-197 DayProject Finish 76132409-Apr-1825-Jul-185 DayStage 1 StagStage 1e 9009-Apr-1827-Apr-18 5 DayWater WaterWater A165Sawcut for Removals - Water Line & Detour3009-Apr-1811-Apr-18 5 Day A155Water Line 45+80 to 48+256012-Apr-1817-Apr-18 5 Day A138Crossing @ 44+703018-Apr-1818-Apr-18 5 Day A137Crossing @36+164019-Apr-1825-Apr-18 5 Day A136Crossing @ 28+263026-Apr-1827-Apr-18 5 Day 76132412-Apr-1825-Jul-185 DayTCP Setup Stage 2 TCP TCP Setup Stage 2S A166Sawcut for Removals - Bridge Sidewalk1012-Apr-1820-Apr-18 5 Day A105Remove Sidewalk SB5023-Apr-1815-May-185 Day A260Railroad Crossing Arm Delay15026-Apr-1825-Jun-18 5 Day A107Remove Bridge Median1015-May-1815-May-185 Day A109Removals - Detours1016-May-1816-May-185 Day A110Install Stage Detours3016-May-1818-May-185 Day A108Set & Pin PCTB - Demo Edge2021-May-1821-May-185 Day A161Railroad Install Temp Crossing Arms0027-Jun-18 5 DayRailroad Install Temp Crossing Arms A106Set PCTB - Center Stripe11425-Jul-1825-Jul-185 DaySet PCTB - Center Stripe 00525-Jul-1825-Jul-185 DayStorm Drain StorStorm Drainm A139Storm Drain Rehab @ 17+2300525-Jul-1825-Jul-185 DayStorm Drain Rehab @ 17+23 1318820417-May-1807-Dec-18Stage 2 - NB Dividend to Bethel StagStage 2 - NB Dividend to Bethele A1620Switch Traffic to Stage 21021-May-1821-May-185 Day A1630Remove Concrete Pavement & Sidewalk - South of RR8025-May-1813-Jun-18 5 Day A2420Complete Pavement Removal North of RR3026-Jun-1813-Jul-18 A5 Day 2017-May-1818-May-185 DaySanitary Sewer SanitSanitary Sewera A149Install SS @ 26+56 w/ Temp Connection2017-May-1818-May-185 Day 4242427-Aug-1824-Oct-185 DayStorm Drain StorStorm Drainm A150Storm Drain Impovements NB333527-Aug-1830-Aug-185 DayStorm Drain Impovements NB A186Complete Inlet Tops after Paving88415-Oct-1824-Oct-185 DayComplete Inlet Tops after Paving 813728822-May-1814-Sep-185 DayWater Line WateWater Liner A140Steel Casing 23+81 to 26+1616022-May-1823-May-185 Day A144Install 16" Main in Bore3024-May-1824-May-185 Day Remaining Level of EffortActual WorkCritical Remaining Work Page 1 of 7 Run Date 06-Aug-18 Actual Level of EffortRemaining WorkMilestone Data Date 25-Jul-18 020 Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendar20182019 DurationDuration Jan MayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDec A143Install 16" Main 27+13 to 36+168025-May-1806-Jun-18 5 Day A164Install 16" Main 36+16 to 45+807007-Jun-1822-Jun-18 5 Day A142Install 16" Main 19+00 to 23+104026-Jun-1810-Jul-18 A5 Day A303Test Line A5011-Jul-18 A24-Jul-18 A5 Day A169Install 20" Waterline on Southwestern111128816-Jul-18 A11-Sep-185 DayInstall 20" Waterline on Southwestern A145Install Hydrants, Crossings, etc 19+00 to45+8049624-Jul-18 A06-Aug-185 DayInstall Hydrants, Crossings, etc 19+00 to45+80 A141Install Hydrants, Crossing, etc Dividend to 19+006631007-Aug-1814-Aug-185 DayInstall Hydrants, Crossing, etc Dividend to 19+00 A146Connect to Existing @ 19+0811607-Aug-1807-Aug-185 DayConnect to Existing @ 19+08 A147Finish Connecting Services22608-Aug-1810-Aug-185 DayFinish Connecting Services A148Grout Existing Water Line1010610-Aug-1824-Aug-185 DayGrout Existing Water Line A170Replace Pavement on Southwestern3328811-Sep-1814-Sep-185 DayReplace Pavement on Southwestern 109702024-May-1812-Nov-18Bridge BridgeBridge A103Demo Existing Bridge5024-May-1815-Jun-18 5 Day A104Grading Proposed Bridge1016-Jun-1818-Jun-18 5 Day A261Drill Sub Mobilization10019-Jun-1820-Jun-18 5 Day A111Drill Shafts4021-Jun-1822-Jun-18 5 Day A156Drill Shaft Utility Conflict1303023-Jun-1824-Aug-187 DayDrill Shaft Utility Conflict A296Complete Drill Shafts551827-Aug-1831-Aug-185Complete Drill Shafts Wki A118Drill Shaft Cure333001-Sep-1804-Sep-187 DayDrill Shaft Cure A112Bent 2 Columns222003-Sep-1804-Sep-185 DayBent 2 Columns A113Bent 3 Columns222004-Sep-1806-Sep-185 DayBent 3 Columns A119Bent 2 Column Cure333404-Sep-1807-Sep-187 DayBent 2 Column Cure A114Abut 1 Cap222006-Sep-1810-Sep-185 DayAbut 1 Cap A120Bent 3 Column Cure333606-Sep-1809-Sep-187 DayBent 3 Column Cure A115Abut 4 Cap222010-Sep-1812-Sep-185 DayAbut 4 Cap A121Abut 1 Cap Cure334010-Sep-1813-Sep-187 DayAbut 1 Cap Cure A116Bent 2 Cap222013-Sep-1817-Sep-185 DayBent 2 Cap A122Abut 4 Cap Cure333713-Sep-1816-Sep-187 DayAbut 4 Cap Cure A168Install CTB @ Abutments334313-Sep-1818-Sep-185 DayInstall CTB @ Abutments A117Bent 3 Cap222017-Sep-1819-Sep-185 DayBent 3 Cap A123Bent 2 Cap Cure333317-Sep-1820-Sep-187 DayBent 2 Cap Cure A124Bent 3 Cap Cure333019-Sep-1822-Sep-187 DayBent 3 Cap Cure A151Install Riprap Under New Bridge332019-Sep-1824-Sep-185 DayInstall Riprap Under New Bridge A125Set Beams112025-Sep-1825-Sep-185 DaySet Beams A126Set Overhang11112026-Sep-1811-Oct-185 DaySet Overhang A127Install Precast Panels & PMD442011-Oct-1817-Oct-185 DayInstall Precast Panels & PMD A128Tie Deck Steel222017-Oct-1818-Oct-185 DayTie Deck Steel A129Pour Deck112018-Oct-1819-Oct-185 DayPour Deck A130Cure Deck883019-Oct-1827-Oct-187 DayCure Deck A131Install Ped Rail on Deck w/ Conduit10102129-Oct-1812-Nov-185 DayInstall Ped Rail on Deck w/ Conduit 9588316-Jul-18 A07-Dec-18Roadway RoadRoadway A171Balance Subgrade 1+55 to 36+009016-Jul-18 A25-Jul-18 A5 Day A196Retaining Wall 45+51 to 48+2411115525-Jul-1809-Aug-185 DayRetaining Wall 45+51 to 48+24 A239Balance Subgrade 36+00 to 67+689026-Jul-18 A06-Aug-185 Day A306Spectrum Conflict at 65+00731606-Aug-1825-Aug-187 DaySpectrum Conflict at 65+00 A307Frontier Conflict 45+00 to 67+68731606-Aug-1825-Aug-187 DayFrontier Conflict 45+00 to 67+68 A319Century Link Conflict at 9+13731606-Aug-1825-Aug-187 DayCentury Link Conflict at 9+13 A197Retaining Wall 63+82 to 65+15665509-Aug-1816-Aug-185 DayRetaining Wall 63+82 to 65+15 Remaining Level of EffortActual WorkCritical Remaining Work Page 2 of 7 Run Date 06-Aug-18 Actual Level of EffortRemaining WorkMilestone Data Date 25-Jul-18 020 Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendar20182019 DurationDuration Jan MayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDec A353Finish Balance Subgrade after Conflict33626-Aug-1828-Aug-187 DayFinish Balance Subgrade after Conflict A172Fine Grade Subgrade66329-Aug-1806-Sep-185 DayFine Grade Subgrade A1734" HMAC Ty B88306-Sep-1818-Sep-185 Day4" HMAC Ty B A174Tie Steel - Paving Pass 155318-Sep-1825-Sep-185 DayTie Steel - Paving Pass 1 A180Paving - Pass 133325-Sep-1828-Sep-185 DayPaving - Pass 1 A175Tie Steel - Paving Pass 255328-Sep-1805-Oct-185 DayTie Steel - Paving Pass 2 A187Cure Paving - Pass 133928-Sep-1801-Oct-187 DayCure Paving - Pass 1 A178Tie Steel - 2nd Half Cross Streets223501-Oct-1803-Oct-185 DayTie Steel - 2nd Half Cross Streets A176Tie Steel - Turn Lanes (13 turn lanes)221205-Oct-1809-Oct-185 DayTie Steel - Turn Lanes (13 turn lanes) A181Paving - Pass 233305-Oct-1810-Oct-185 DayPaving - Pass 2 A182Pave - Turn Lanes221110-Oct-1811-Oct-185 DayPave - Turn Lanes A188Cure Paving - Pass 233510-Oct-1813-Oct-187 DayCure Paving - Pass 2 A189Cure - Turn Lanes331612-Oct-1815-Oct-187 DayCure - Turn Lanes A177Tie Steel - 1st Half Cross Streets222015-Oct-1817-Oct-185 DayTie Steel - 1st Half Cross Streets A183Pave - 1st Half Cross Streets222017-Oct-1819-Oct-185 DayPave - 1st Half Cross Streets A190Cure - 1st Half Intersections332920-Oct-1823-Oct-187 DayCure - 1st Half Intersections A184Pave - 2nd Half Cross Streets222123-Oct-1825-Oct-185 DayPave - 2nd Half Cross Streets A195Backfill Pavement33425-Oct-1829-Oct-185 DayBackfill Pavement A191Cure 2nd Half Intersections333125-Oct-1828-Oct-187 DayCure 2nd Half Intersections A193Install Colored Stamped Concrete552525-Oct-1801-Nov-185 DayInstall Colored Stamped Concrete A179Tie Steel - Driveways222329-Oct-1831-Oct-185 DayTie Steel - Driveways A198Grade for Sidewalk1212430-Oct-1814-Nov-185 DayGrade for Sidewalk A185Pave - Driveways332331-Oct-1805-Nov-185 DayPave - Driveways A194Cure Stamped Concrete333901-Nov-1804-Nov-187 DayCure Stamped Concrete A192Cure - Driveways333505-Nov-1808-Nov-187 DayCure - Driveways A199Pave Sidewalk & Trail88415-Nov-1826-Nov-185 DayPave Sidewalk & Trail A200Backfill Sidewalk & Trail22427-Nov-1828-Nov-185 DayBackfill Sidewalk & Trail A201Grass & Landscape Outside55428-Nov-1807-Dec-185 DayGrass & Landscape Outside 9090925-Jul-1828-Nov-185 DayRailroad RailrRailroado A157Railroad Installed Ped Crossing Arms NB119625-Jul-1825-Jul-185 DayRailroad Installed Ped Crossing Arms NB A158Connect Pavement NB223815-Oct-1817-Oct-185 DayConnect Pavement NB A159Build Sidewalk at RR Crossing NB22927-Nov-1828-Nov-185 DayBuild Sidewalk at RR Crossing NB 441115-Oct-1818-Oct-185 DayTraffic Signals TraffiTraffic Signals A152Signal Drill Shafts at Southwestern NB221115-Oct-1816-Oct-185 DaySignal Drill Shafts at Southwestern NB A154Install Conduit from NB Corners w/ Pull Boxes221116-Oct-1818-Oct-185 DayInstall Conduit from NB Corners w/ Pull Boxes 58581407-Dec-1817-Mar-19Stage 3A - SB Dividend to Fritz StagStage 3A - SB Dividend to Fritze A3840Switch Traffic to Stage 3A11407-Dec-1810-Dec-185 DaySwitch Traffic to Stage 3A A3890Remove Concrete Pavement22910-Dec-1812-Dec-185 DayRemove Concrete Pavement 994613-Dec-1826-Dec-185 DayWater WaterWater A228Remove & Replace Existing Hydrants334613-Dec-1817-Dec-185 DayRemove & Replace Existing Hydrants A229Complete Crossing @ 13+60224618-Dec-1819-Dec-185 DayComplete Crossing @ 13+60 A230Complete Crossing @ 16+05224620-Dec-1821-Dec-185 DayComplete Crossing @ 16+05 A231Complete Crossing @ 22+68224624-Dec-1826-Dec-185 DayComplete Crossing @ 22+68 36361327-Dec-1818-Feb-195 DayStorm Drain StorStorm Drainm A240Storm Drain Impovements SB224627-Dec-1828-Dec-185 DayStorm Drain Impovements SB A241Complete Inlet Tops after Paving221314-Feb-1918-Feb-195 DayComplete Inlet Tops after Paving 2626413-Dec-1822-Jan-195 DaySanitary Sewer SanitSanitary Sewera Remaining Level of EffortActual WorkCritical Remaining Work Page 3 of 7 Run Date 06-Aug-18 Actual Level of EffortRemaining WorkMilestone Data Date 25-Jul-18 020 Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendar20182019 DurationDuration Jan MayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDec A236Install SS 32+33 to 23+8988913-Dec-1824-Dec-185 DayInstall SS 32+33 to 23+89 A232Drill Shafts for Aerial SS Crossing33417-Dec-1820-Dec-185 DayDrill Shafts for Aerial SS Crossing A233Columns for Aerial SS Crossing33420-Dec-1826-Dec-185 DayColumns for Aerial SS Crossing A234Caps for Aerial SS Crossing22426-Dec-1828-Dec-185 DayCaps for Aerial SS Crossing A235Casing for Aerial SS Crossing33428-Dec-1803-Jan-195 DayCasing for Aerial SS Crossing A237Install SS 23+89 to 17+3988403-Jan-1915-Jan-195 DayInstall SS 23+89 to 17+39 A238Rehab Existing SS Manholes55415-Jan-1922-Jan-195 DayRehab Existing SS Manholes 52522010-Dec-1808-Mar-19Bridge BridgeBridge A203Demo Existing Bridge55410-Dec-1817-Dec-185 DayDemo Existing Bridge A204Grading Proposed Bridge112117-Dec-1818-Dec-185 DayGrading Proposed Bridge A205Drill Shafts552118-Dec-1826-Dec-185 DayDrill Shafts A206Bent 2 Columns222126-Dec-1827-Dec-185 DayBent 2 Columns A220Drill Shaft Cure333226-Dec-1829-Dec-187 DayDrill Shaft Cure A207Bent 3 Columns222128-Dec-1831-Dec-185 DayBent 3 Columns A221Bent 2 Column Cure333728-Dec-1831-Dec-187 DayBent 2 Column Cure A208Abut 1 Cap222131-Dec-1803-Jan-195 DayAbut 1 Cap A222Bent 3 Column Cure333631-Dec-1803-Jan-197 DayBent 3 Column Cure A209Abut 4 Cap222104-Jan-1908-Jan-195 DayAbut 4 Cap A223Abut 1 Cap Cure334304-Jan-1907-Jan-197 DayAbut 1 Cap Cure A210Bent 2 Cap222108-Jan-1910-Jan-195 DayBent 2 Cap A224Abut 4 Cap Cure333808-Jan-1911-Jan-197 DayAbut 4 Cap Cure A219Install CTB @ Abutments333908-Jan-1911-Jan-195 DayInstall CTB @ Abutments A211Bent 3 Cap222110-Jan-1915-Jan-195 DayBent 3 Cap A225Bent 2 Cap Cure333610-Jan-1913-Jan-197 DayBent 2 Cap Cure A226Bent 3 Cap Cure333215-Jan-1918-Jan-197 DayBent 3 Cap Cure A218Install Riprap Under New Bridge442115-Jan-1921-Jan-195 DayInstall Riprap Under New Bridge A212Set Beams112121-Jan-1922-Jan-195 DaySet Beams A213Set Overhang662122-Jan-1929-Jan-195 DaySet Overhang A214Install Precast Panels & PMD552129-Jan-1905-Feb-195 DayInstall Precast Panels & PMD A215Tie Deck Steel222105-Feb-1907-Feb-195 DayTie Deck Steel A216Pour Deck112107-Feb-1908-Feb-195 DayPour Deck A227Cure Deck883108-Feb-1916-Feb-197 DayCure Deck A217Install Ped Rail on Deck w/ Conduit10102118-Feb-1904-Mar-195 DayInstall Ped Rail on Deck w/ Conduit A202Form & Pour West Sidewalk & Median442104-Mar-1908-Mar-195 DayForm & Pour West Sidewalk & Median 5555213-Dec-1817-Mar-19Roadway RoadRoadway A243Balance Subgrade662513-Dec-1821-Dec-185 DayBalance Subgrade A244Fine Grade Subgrade22522-Jan-1923-Jan-195 DayFine Grade Subgrade A2454" HMAC Ty B33424-Jan-1929-Jan-195 Day4" HMAC Ty B A246Tie Steel - Paving Pass 122429-Jan-1931-Jan-195 DayTie Steel - Paving Pass 1 A252Paving - Pass 122431-Jan-1904-Feb-195 DayPaving - Pass 1 A247Tie Steel - Paving Pass 222404-Feb-1905-Feb-195 DayTie Steel - Paving Pass 2 A266Cure Paving - Pass 133504-Feb-1907-Feb-197 DayCure Paving - Pass 1 A248Tie Steel - Turn Lanes22406-Feb-1908-Feb-195 DayTie Steel - Turn Lanes A253Paving - Pass 222307-Feb-1911-Feb-195 DayPaving - Pass 2 A254Pave - Turn Lanes22311-Feb-1913-Feb-195 DayPave - Turn Lanes A267Cure Paving - Pass 2331911-Feb-1914-Feb-197 DayCure Paving - Pass 2 A268Cure - Turn Lanes33413-Feb-1916-Feb-197 DayCure - Turn Lanes A259Backfill Pavement221513-Feb-1914-Feb-195 DayBackfill Pavement Remaining Level of EffortActual WorkCritical Remaining Work Page 4 of 7 Run Date 06-Aug-18 Actual Level of EffortRemaining WorkMilestone Data Date 25-Jul-18 020 Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendar20182019 DurationDuration Jan MayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDec A249Tie Steel - 1st Half Cross Streets11218-Feb-1918-Feb-195 DayTie Steel - 1st Half Cross Streets A262Grade for Sidewalk441318-Feb-1922-Feb-195 DayGrade for Sidewalk A255Pave - 1st Half Cross Streets22219-Feb-1920-Feb-195 DayPave - 1st Half Cross Streets A269Cure - 1st Half Intersections33321-Feb-1924-Feb-197 DayCure - 1st Half Intersections A263Pave Sidewalk221322-Feb-1925-Feb-195 DayPave Sidewalk A250Tie Steel - 2nd Half Cross Streets11225-Feb-1925-Feb-195 DayTie Steel - 2nd Half Cross Streets A251Tie Steel - Driveways221126-Feb-1927-Feb-195 DayTie Steel - Driveways A256Pave - 2nd Half Cross Streets22226-Feb-1927-Feb-195 DayPave - 2nd Half Cross Streets A264Backfill Sidewalk111326-Feb-1926-Feb-195 DayBackfill Sidewalk A265Grass & Landscape Outside221327-Feb-1928-Feb-195 DayGrass & Landscape Outside A257Pave - Driveways221028-Feb-1901-Mar-195 DayPave - Driveways A270Cure 2nd Half Intersections33328-Feb-1903-Mar-197 DayCure 2nd Half Intersections A271Cure - Driveways331501-Mar-1904-Mar-197 DayCure - Driveways A258Install Colored Stamped Concrete88204-Mar-1913-Mar-195 DayInstall Colored Stamped Concrete A272Cure Stamped Concrete33214-Mar-1917-Mar-197 DayCure Stamped Concrete 22422-Jan-1924-Jan-195 DayLighting LightLightingi A285Install Conduit Between Medians22422-Jan-1924-Jan-195 DayInstall Conduit Between Medians 464610018-Mar-1928-May-19Stage 3B - Median Dividend to Airline StagStage 3B - Median Dividend to Airlinee A3850Switch Traffic to Stage 3B11218-Mar-1918-Mar-195 DaySwitch Traffic to Stage 3B A3900Remove Concrete Pavement11219-Mar-1919-Mar-195 DayRemove Concrete Pavement 151510020-Mar-1912-Apr-19Roadway RoadRoadway A273Balance & Fine Grade Subgrade22220-Mar-1921-Mar-195 DayBalance & Fine Grade Subgrade A2744" HMAC Ty B11221-Mar-1922-Mar-195 Day4" HMAC Ty B A275Tie Steel - Paving Pass 122222-Mar-1926-Mar-195 DayTie Steel - Paving Pass 1 A278Pave - Pass 111226-Mar-1927-Mar-195 DayPave - Pass 1 A276Tie Steel - Paving Pass 222227-Mar-1928-Mar-195 DayTie Steel - Paving Pass 2 A281Cure Pass 133227-Mar-1930-Mar-197 DayCure Pass 1 A279Pave - Pass 211001-Apr-1901-Apr-195 DayPave - Pass 2 A277Tie Steel - Paving Pass 322002-Apr-1903-Apr-195 DayTie Steel - Paving Pass 3 A282Cure Pass 23316402-Apr-1905-Apr-197 DayCure Pass 2 A280Pave - Pass 311003-Apr-1904-Apr-195 DayPave - Pass 3 A283Cure Pass 333004-Apr-1907-Apr-197 DayCure Pass 3 A284Colored Stamped Median Pavement2211110-Apr-1912-Apr-195 DayColored Stamped Median Pavement 77520-Mar-1901-Apr-19Lighting LightLightingi A286Install Illumination Drill Shafts (15 ea)22520-Mar-1922-Mar-195 DayInstall Illumination Drill Shafts (15 ea) A287Complete Conduit22722-Mar-1925-Mar-195 DayComplete Conduit A289Cure Illumination Drill Shafts66722-Mar-1927-Mar-197 DayCure Illumination Drill Shafts A288Set Illumination & Wiring22528-Mar-1901-Apr-195 DaySet Illumination & Wiring 383811104-Apr-1928-May-195 DayLandscaping LandLandscapings A290Install Irrigation System4411104-Apr-1910-Apr-195 DayInstall Irrigation System A291Install Landscape Borders2211112-Apr-1916-Apr-195 DayInstall Landscape Borders A292Install Landscaping181811116-Apr-1910-May-195 DayInstall Landscaping A293Install City Monument121211110-May-1928-May-195 DayInstall City Monument 9595808-Apr-1904-Sep-19Stage 4A - SB Fritz to Bethel StagStage 4A - SB Fritz to Bethele A3860Switch Traffic to Stage 4A11008-Apr-1908-Apr-195 DaySwitch Traffic to Stage 4A A3910Remove Concrete Pavement88009-Apr-1918-Apr-195 DayRemove Concrete Pavement 66019-Apr-1929-Apr-195 DaySanitary Sewer SanitSanitary Sewera Remaining Level of EffortActual WorkCritical Remaining Work Page 5 of 7 Run Date 06-Aug-18 Actual Level of EffortRemaining WorkMilestone Data Date 25-Jul-18 020 Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendar20182019 DurationDuration Jan MayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDec A294Install SS @ Southwestern44019-Apr-1924-Apr-195 DayInstall SS @ Southwestern A295Complete SS Rehab Work22025-Apr-1929-Apr-195 DayComplete SS Rehab Work 60601529-Apr-1923-Jul-195 DayStorm Drain StorStorm Drainm A308Storm Drain Impovements SB55029-Apr-1906-May-195 DayStorm Drain Impovements SB A309Complete Inlet Tops after Paving331518-Jul-1923-Jul-195 DayComplete Inlet Tops after Paving 3838019-Apr-1912-Jun-195 DayWater Line WateWater Liner A311Bore Casing Under Railroad (102 LF)1010419-Apr-1902-May-195 DayBore Casing Under Railroad (102 LF) A310Complete SB Water Connections 28+26 to 45+8022006-May-1908-May-195 DayComplete SB Water Connections 28+26 to 45+80 A312Install 16" Water Main 45+80 to 67+681515008-May-1929-May-195 DayInstall 16" Water Main 45+80 to 67+68 A314Connect to Existing @ 67+6811029-May-1930-May-195 DayConnect to Existing @ 67+68 A313Complete Connections North of 45+8022030-May-1904-Jun-195 DayComplete Connections North of 45+80 A315Remove/Grout Existing Water Line66005-Jun-1912-Jun-195 DayRemove/Grout Existing Water Line 8888819-Apr-1904-Sep-19Roadway RoadRoadway A320Balance Subgrade10102919-Apr-1902-May-195 DayBalance Subgrade A321Fine Grade Subgrade33013-Jun-1918-Jun-195 DayFine Grade Subgrade A3224" HMAC Ty B66018-Jun-1926-Jun-195 Day4" HMAC Ty B A323Tie Steel - Paving Pass 133026-Jun-1901-Jul-195 DayTie Steel - Paving Pass 1 A329Paving - Pass 133001-Jul-1905-Jul-195 DayPaving - Pass 1 A324Tie Steel - Paving Pass 233005-Jul-1910-Jul-195 DayTie Steel - Paving Pass 2 A343Cure Paving - Pass 133205-Jul-1908-Jul-197 DayCure Paving - Pass 1 A325Tie Steel - Turn Lanes (6 turn lanes)22110-Jul-1912-Jul-195 DayTie Steel - Turn Lanes (6 turn lanes) A330Paving - Pass 233010-Jul-1915-Jul-195 DayPaving - Pass 2 A331Pave - Turn Lanes33015-Jul-1918-Jul-195 DayPave - Turn Lanes A344Cure Paving - Pass 2332115-Jul-1918-Jul-197 DayCure Paving - Pass 2 A345Cure - Turn Lanes33018-Jul-1921-Jul-197 DayCure - Turn Lanes A326Tie Steel - 1st Half Cross Streets22022-Jul-1924-Jul-195 DayTie Steel - 1st Half Cross Streets A336Backfill Pavement44922-Jul-1925-Jul-195 DayBackfill Pavement A332Pave - 1st Half Cross Streets33024-Jul-1929-Jul-195 DayPave - 1st Half Cross Streets A337Install Gabions @ 61+8033926-Jul-1931-Jul-195 DayInstall Gabions @ 61+80 A346Cure - 1st Half Intersections33029-Jul-1901-Aug-197 DayCure - 1st Half Intersections A339Grade for Sidewalk1010931-Jul-1913-Aug-195 DayGrade for Sidewalk A327Tie Steel - 2nd Half Cross Streets22001-Aug-1905-Aug-195 DayTie Steel - 2nd Half Cross Streets A328Tie Steel - Driveways222406-Aug-1908-Aug-195 DayTie Steel - Driveways A333Pave - 2nd Half Cross Streets33006-Aug-1908-Aug-195 DayPave - 2nd Half Cross Streets A334Pave - Driveways332408-Aug-1913-Aug-195 DayPave - Driveways A347Cure 2nd Half Intersections33009-Aug-1912-Aug-197 DayCure 2nd Half Intersections A335Install Colored Stamped Concrete1010012-Aug-1926-Aug-195 DayInstall Colored Stamped Concrete A348Cure - Driveways333213-Aug-1916-Aug-197 DayCure - Driveways A340Pave Sidewalk1010913-Aug-1927-Aug-195 DayPave Sidewalk A349Cure Stamped Concrete331926-Aug-1929-Aug-197 DayCure Stamped Concrete A341Backfill Sidewalk22927-Aug-1929-Aug-195 DayBackfill Sidewalk A342Grass & Landscape Outside44929-Aug-1904-Sep-195 DayGrass & Landscape Outside 92921419-Apr-1928-Aug-195 DayRailroad RailrRailroado A297Railroad Installed Concrete Panels SB1110419-Apr-1919-Apr-195 DayRailroad Installed Concrete Panels SB A298Railroad Installed Ped Crossing Arms SB1110419-Apr-1919-Apr-195 DayRailroad Installed Ped Crossing Arms SB A299Connect Pavement SB114218-Jul-1919-Jul-195 DayConnect Pavement SB A300Build Sidewalk at RR Crossing SB111427-Aug-1928-Aug-195 DayBuild Sidewalk at RR Crossing SB 12121012-Aug-1929-Aug-19Traffic Signals TraffiTraffic Signals Remaining Level of EffortActual WorkCritical Remaining Work Page 6 of 7 Run Date 06-Aug-18 Actual Level of EffortRemaining WorkMilestone Data Date 25-Jul-18 020 Activity IDActivity NameOriginalRemainingTotal FloatStartFinishCalendar20182019 DurationDuration Jan MayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDec A302Signal Drill Shafts at Southwestern SB221312-Aug-1913-Aug-195 DaySignal Drill Shafts at Southwestern SB A304Install Conduit from SB Corners w/ Pull Boxes221513-Aug-1916-Aug-195 DayInstall Conduit from SB Corners w/ Pull A305Signal Drill Shaft Cure661713-Aug-1919-Aug-197 DaySignal Drill Shaft Cure A301Install Signal Poles & Wire881319-Aug-1929-Aug-195 DayInstall Signal Poles & Wire 352292009-Apr-1801-Nov-19Stage 4B - Median StagStage 4B - Median Airline to Bethele A3870Switch Traffic to Stage 4B11904-Sep-1905-Sep-195 DaySwitch Traffic to Stage 4B A3920Remove Concrete Pavement22905-Sep-1909-Sep-195 DayRemove Concrete Pavement 15152205-Sep-1926-Sep-19Bridge BridgeBridge A316Form & Pour NB Sidewalk222505-Sep-1906-Sep-195 DayForm & Pour NB Sidewalk A317Cure NB Sidewalk333507-Sep-1910-Sep-197 DayCure NB Sidewalk A318Form & Pour NB Traffic Rail10102510-Sep-1924-Sep-195 DayForm & Pour NB Traffic Rail A338Illumination and Banner Poles on Bridge222524-Sep-1926-Sep-195 DayIllumination and Banner Pole 3535009-Sep-1901-Nov-19Roadway RoadRoadway A363Balance & Fine Grade Subgrade22909-Sep-1910-Sep-195 DayBalance & Fine Grade Subgrade A3644" HMAC Ty B22911-Sep-1912-Sep-195 Day4" HMAC Ty B A365Tie Steel - Paving Pass 111912-Sep-1913-Sep-195 DayTie Steel - Paving Pass 1 A368Pave - Pass 111913-Sep-1916-Sep-195 DayPave - Pass 1 A366Tie Steel - Paving Pass 211916-Sep-1917-Sep-195 DayTie Steel - Paving Pass 2 A372Cure Pass 1332516-Sep-1919-Sep-197 DayCure Pass 1 A373Cure Pass 2331317-Sep-1920-Sep-197 DayCure Pass 2 A369Pave - Pass 2111719-Sep-1920-Sep-195 DayPave - Pass 2 A367Tie Steel - Paving Pass 3111720-Sep-1923-Sep-195 DayTie Steel - Paving Pass 3 A370Pave - Pass 3111723-Sep-1924-Sep-195 DayPave - Pass 3 A374Cure Pass 3332423-Sep-1926-Sep-197 DayCure Pass 3 A350Tie Steel - Pass 4111724-Sep-1925-Sep-195 DayTie Steel - Pass 4 A351Pave Pass 4111627-Sep-1927-Sep-195 DayPave Pass 4 A352Cure Pass 4332428-Sep-1901-Oct-197 DayCure Pass 4 A383Colored Stamped Cross Walk221801-Oct-1903-Oct-195 DayColored Stamped Cross W A371Colored Stamped Median Pavement221803-Oct-1907-Oct-195 DayColored Stamped Median A382Permanent Striping55025-Oct-1901-Nov-195 DayPermanent Striping 1818820-Sep-1918-Oct-19Lighting LightLightingi A375Install Illumination Drill Shafts (27 ea)88920-Sep-1902-Oct-195 DayInstall Illumination Drill Sha A376Complete Conduit44902-Oct-1908-Oct-195 DayComplete Conduit A378Cure Illumination Drill Shafts661402-Oct-1908-Oct-197 DayCure Illumination Drill Sha A377Set Illumination & Wiring88908-Oct-1918-Oct-195 DaySet Illumination & Wirin 348292009-Apr-1801-Nov-19Landscaping LandLandscapings A388Duration530464009-Apr-1801-Nov-197 Day A379Install Irrigation System1212026-Aug-1911-Sep-195 DayInstall Irrigation System A380Install Landscape Borders88011-Sep-1923-Sep-195 DayInstall Landscape Borders A381Install Landscaping2424023-Sep-1925-Oct-195 DayInstall Landscaping Remaining Level of EffortActual WorkCritical Remaining Work Page 7 of 7 Run Date 06-Aug-18 Actual Level of EffortRemaining WorkMilestone Data Date 25-Jul-18