Loading...
ST1501A-CS180824 Priscilla Martinez From:Marcus Marion Sent:Monday, August 27, 2018 5:01 PM To:Priscilla Martinez Subject:Freeport Reconstruction Bridge Conflicts Zayo This is a correspondence for Freeport about the utility conflict. From: Darryl Zbranek Sent: Friday, August 24, 2018 3:28 PM To: rocky.crockett@zayo.com; Eric Giebelhaus <Eric.Giebelhaus@strlco.com>; Jimmy Reed <Jimmy.Reed@strlco.com>; Joe Soto <Joe.Soto@strlco.com>; FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov> Subject: RE: Freeport Reconstruction Bridge Conflicts Zayo Rocky, During our meeting this morning we had discussions about Zayo having a contractor excavate and locate the Zayo/Level 3/Century Link utilities in three areas that our drill shafts conflict with. The first area is on the South end of the bridge where a wing wall drill shaft is to be located. The second is where a drill shaft on abutment 1 is to be located. The third conflict is the drill shaft on bent 2. We also discussed Zayo hiring a contractor move the Zayo/ Level 3/Century Link utility in the area at abutment 4, on the North end of the bridge. This line needs to be relocated to avoid the drill shaft. Zayo requested that the City of Coppell assist with the excavations in these locations by paying Texas Sterling Contractors approximately $5,000.00 for this work. The actual amount will be determined after the work is complete based on Time & Materials. The City of Coppell is willing to help with the excavation of the three areas under the condition that Zayo can have a contractor on site to begin the work by Wednesday August 29, 2018 at 9AM. If Zayo can meet this schedule, the City will direct Texas Sterling to begin the excavations in the three areas early next week. We will need written approval from Zayo for Texas Sterling to excavate over the utilities and request that a Zayo representative be on site during the excavation as a precaution and acceptance of the liability of work directed on behalf of Zayo. Please let me know if Zayo is agreeable. Thank you, Darryl Zbranek Chief Construction Inspector City of Coppell, TX (972)304-7090 www.coppelltx.gov To stop receiving messages from FreeportProjectST1501 group, stop following it. 1 2