Loading...
ST1501A-CS180824 (2) Priscilla Martinez From:Marcus Marion Sent:Monday, August 27, 2018 5:04 PM To:Priscilla Martinez Subject:Freeport - Fire Hydrant Move This is correspondence for the fire hydrant at Wrangler From: Jamie Brierton Sent: Friday, August 24, 2018 3:56 PM To: Eric Giebelhaus <Eric.Giebelhaus@strlco.com>; Darryl Zbranek <dzbranek@coppelltx.gov> Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>; Joe Soto <Joe.Soto@strlco.com>; Jimmy Reed <Jimmy.Reed@strlco.com> Subject: RE: Freeport - Fire Hydrant Move Eric- Please bill this cost to line item X-1 for water contingency. Thanks Jamie From: Eric Giebelhaus \[mailto:Eric.Giebelhaus@strlco.com\] Sent: Thursday, August 23, 2018 9:54 AM To: Darryl Zbranek <dzbranek@coppelltx.gov> Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>; Jamie Brierton <JBrierton@coppelltx.gov>; Joe Soto <Joe.Soto@strlco.com>; Jimmy Reed <Jimmy.Reed@strlco.com> Subject: RE: Freeport - Fire Hydrant Move Darryl, Jimmy pointed out that we still needed the 6” gate valve. I have attached a corrected cost sheet. Thanks, Eric Giebelhaus Project Manager– North Texas Division Texas Sterling Construction Co. | 1441 Airport Freeway Suite 350, Euless, Texas 76040 | | 469.346.8085 Cell | 1 From: Darryl Zbranek <dzbranek@coppelltx.gov> Sent: Wednesday, August 22, 2018 9:16 AM To: Eric Giebelhaus <Eric.Giebelhaus@strlco.com> Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>; Jamie Brierton <JBrierton@coppelltx.gov>; Joe Soto <Joe.Soto@strlco.com>; Jimmy Reed <Jimmy.Reed@strlco.com> Subject: RE: Freeport - Fire Hydrant Move Eric, we will be adding a 8” gate valve and a 8” x 6” TEE for this change, this will increase the quantities for these items. Please add them to the pricing so we can include them in the change order. If you have any questions please let me know. Thanks, Darryl Zbranek Chief Construction Inspector City of Coppell, TX (972)304-7090 www.coppelltx.gov From: Eric Giebelhaus <Eric.Giebelhaus@strlco.com> Sent: Wednesday, August 22, 2018 7:53 AM To: Darryl Zbranek <dzbranek@coppelltx.gov> Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>; Jamie Brierton <JBrierton@coppelltx.gov>; Joe Soto <Joe.Soto@strlco.com>; Jimmy Reed <Jimmy.Reed@strlco.com> Subject: Freeport - Fire Hydrant Move Darryl, Attached is pricing for moving the fire hydrant that was supposed to be replaced at station 8+08. This is to cover the cost of excavating and exposing the lines in the plans to install the hydrant and backfilling that excavation. The actual hydrant installation at the newly proposed location can be done using existing bid items. Please create a change order to add this extra cost to the project. Thanks, Eric Giebelhaus Project Manager– North Texas Division Texas Sterling Construction Co. | 1441 Airport Freeway Suite 350, Euless, Texas 76040 | | 469.346.8085 Cell | To stop receiving messages from FreeportProjectST1501 group, stop following it. 2 3