ST1501A-CS180824 (2)
Priscilla Martinez
From:Marcus Marion
Sent:Monday, August 27, 2018 5:04 PM
To:Priscilla Martinez
Subject:Freeport - Fire Hydrant Move
This is correspondence for the fire hydrant at Wrangler
From: Jamie Brierton
Sent: Friday, August 24, 2018 3:56 PM
To: Eric Giebelhaus <Eric.Giebelhaus@strlco.com>; Darryl Zbranek <dzbranek@coppelltx.gov>
Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>; Joe Soto <Joe.Soto@strlco.com>; Jimmy Reed
<Jimmy.Reed@strlco.com>
Subject: RE: Freeport - Fire Hydrant Move
Eric-
Please bill this cost to line item X-1 for water contingency.
Thanks
Jamie
From: Eric Giebelhaus \[mailto:Eric.Giebelhaus@strlco.com\]
Sent: Thursday, August 23, 2018 9:54 AM
To: Darryl Zbranek <dzbranek@coppelltx.gov>
Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>; Jamie Brierton <JBrierton@coppelltx.gov>; Joe Soto
<Joe.Soto@strlco.com>; Jimmy Reed <Jimmy.Reed@strlco.com>
Subject: RE: Freeport - Fire Hydrant Move
Darryl,
Jimmy pointed out that we still needed the 6” gate valve. I have attached a corrected cost sheet.
Thanks,
Eric Giebelhaus
Project Manager– North Texas Division
Texas Sterling Construction Co.
| 1441 Airport Freeway Suite 350, Euless, Texas 76040 |
| 469.346.8085 Cell |
1
From: Darryl Zbranek <dzbranek@coppelltx.gov>
Sent: Wednesday, August 22, 2018 9:16 AM
To: Eric Giebelhaus <Eric.Giebelhaus@strlco.com>
Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>; Jamie Brierton <JBrierton@coppelltx.gov>; Joe Soto
<Joe.Soto@strlco.com>; Jimmy Reed <Jimmy.Reed@strlco.com>
Subject: RE: Freeport - Fire Hydrant Move
Eric, we will be adding a 8” gate valve and a 8” x 6” TEE for this change, this will increase the quantities for these items.
Please add them to the pricing so we can include them in the change order. If you have any questions please let me
know.
Thanks,
Darryl Zbranek
Chief Construction Inspector
City of Coppell, TX
(972)304-7090
www.coppelltx.gov
From: Eric Giebelhaus <Eric.Giebelhaus@strlco.com>
Sent: Wednesday, August 22, 2018 7:53 AM
To: Darryl Zbranek <dzbranek@coppelltx.gov>
Cc: FreeportProjectST1501 <freeportprojectst1501@coppelltx.gov>; Jamie Brierton <JBrierton@coppelltx.gov>; Joe Soto
<Joe.Soto@strlco.com>; Jimmy Reed <Jimmy.Reed@strlco.com>
Subject: Freeport - Fire Hydrant Move
Darryl,
Attached is pricing for moving the fire hydrant that was supposed to be replaced at station 8+08. This is to cover the cost
of excavating and exposing the lines in the plans to install the hydrant and backfilling that excavation. The actual hydrant
installation at the newly proposed location can be done using existing bid items.
Please create a change order to add this extra cost to the project.
Thanks,
Eric Giebelhaus
Project Manager– North Texas Division
Texas Sterling Construction Co.
| 1441 Airport Freeway Suite 350, Euless, Texas 76040 |
| 469.346.8085 Cell |
To stop receiving messages from FreeportProjectST1501 group, stop following it.
2