Loading...
ST1501A-CS180803 Daily Field Report - Aug 3, 2018 KLF Project #: 20183887.001A byEric M VincentCoCoppell: Freeport Pkwy Reconstruction Client:City of Coppell, TX Contractor:RPMXTime Start:03:30 PM Traveled mi. Types of Tests/Observations Performed: Sample Pickup, Soil / Density Testing Documents Referenced: Observations/Remarks: I arrived on site to perform in place soil moisture/density testing on Freeport Pkwy. I tested the prepared area from station 4+50 to 22+00. The sub grade appeared to be homogeneous for the most part but with varying degrees of rock/gravel in some areas. Many tests were showing overcompaction with low moistures. From what I observed this seemed more likely to be due to the rock content then a difference in the prepared subgrade. I called Joel Peters and explained what I found and that taking a new proctor sample at station 4+50 may give us more reliable test results. He called our contact for the City of Coppell and the city representative agreed that a new proctor sample might be the most thorough solution. I took a new sample from 4+50. The only personnel I could find on the project was an equipment operator who tried calling the foreman but could not reach him. I explained to him what was found and the solution that was in place. I then took the sample to the lab, logged it in and started the preparation for proctor testing. Acknowledged By SignatureKleinfelder Representative Signature RPMXEric M Vincent Representing Company Company NameKleinfelder Representative Print Name Reviewed by: Cody Solvin on 8/7/2018 8:29:36 AM CT Page 1 of 1 Kleinfelder Dallas 7805 Mesquite Bend Irving, TX 75063