White Glove-CS000111 MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To:
From:
Date:
RE:
Garreth Campbell, Construction Inspector
Larry Davis, Construction Inspector
Debi Ingram, Engineering Secretary
January 11, 2000
Expiring Maintenance Bond(s)
The following Maintenance Bond(s) will expire as follows.
Q-Lube (White Glove Express, Phase II 3/9/00 (Garreth Campbell)
Please re-inspect the above mentioned project(s) to see that the public improvements
for this project are in satisfactory condition.
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"