Loading...
White Glove-CS 970618The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 June 18, 1997 Dayton Macatee, P.E. Macatee Engineering, Inc. 6440 N. Central Expy., Suite 414 Dallas, TX 75225 RE: White Glove Express Addition Lot 1R, Block A First Construction Review Comments Dear Mr. Macatee: The City of Coppell has received and reviewed the referenced plans and has the following comments to offer: 1. Provide a paving plan with the next set of plans. 2. Show the brick paver band at all approaches on all sheets. 3. Provide an erosion control plan and show the location of the stabilized construction entrance. 4. Show the 100-year hydraulic grade line on the profile of storm line "A". 5. The utility plan is showing catch basins on the south end of the property, the site plan is showing another inlet on the north side of the property and the drainage plan is showing something else. Please clarify what the correct drainage plan is. 6. On the utility plan, install a waste water access device and grease trap at the location shown on the plans. Also, a manhole or cleanout is needed at the location where the sewer line turns 90 degrees at the 6" sewer tap. 7. Remove the landscape and irrigation plans from the civil plans. Building Inspection Dept. will approve the landscape and irrigation plans. There are various other minor comments throughout the plans. Once these comments have been addressed, the marked up plans along with two revised sets of plans should be resubmitted to the City for review. If you should have any questions concerning these comments, please contact me at 304-3682. Sincerely . Atul I. Patel, Graduate Eng