Petterson (Encore)-CS180918RIGHT-OF-WAY USE PERMIT APPLICATION
Permit valid for 90 calendar days from date of approval
¾
¾
Rev. 06/2012
A copy of the approved permit must be on the job site at all times.
9/14/2018
9/17/2018 10/17/2018
Install HDPE Poly Gas for Petterson Addition
Petterson Addition.
PCI Utilities 972-562-2762
hunter@pciutilities.com
Brandon.Ball@atmos energy.com
972-360-4428
Brandon Ball
¾
¾
¾
Locates for existing franchise utilities must be done 48 hours prior to beginning work.
For City utility locates, call 972-462-5155 to schedule 48 hours prior to beginning work.
¾
9/14/2018Hunter Herriage
9/14/2018Brandon Ball
18 September 2018
Submit traffic control plan if lane closures will be necessary.
UTILITY RELOCATION CHECKLIST FOR WORK WITHIN
CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS
Listed below are minimum requirements for utility relocation projects:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
coppelltx.gov/utility-operations-division
940/ 321-7800 x 7624
972/360-4428 (Gary Dickinson)
972/ 318-5277