Petterson (Encore)-CS180918RIGHT-OF-WAY USE PERMIT APPLICATION Permit valid for 90 calendar days from date of approval ¾ ¾ Rev. 06/2012 A copy of the approved permit must be on the job site at all times. 9/14/2018 9/17/2018 10/17/2018 Install HDPE Poly Gas for Petterson Addition Petterson Addition. PCI Utilities 972-562-2762 hunter@pciutilities.com Brandon.Ball@atmos energy.com 972-360-4428 Brandon Ball ¾ ¾ ¾ Locates for existing franchise utilities must be done 48 hours prior to beginning work. For City utility locates, call 972-462-5155 to schedule 48 hours prior to beginning work. ¾ 9/14/2018Hunter Herriage 9/14/2018Brandon Ball 18 September 2018 Submit traffic control plan if lane closures will be necessary. UTILITY RELOCATION CHECKLIST FOR WORK WITHIN CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS Listed below are minimum requirements for utility relocation projects: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. coppelltx.gov/utility-operations-division 940/ 321-7800 x 7624 972/360-4428 (Gary Dickinson) 972/ 318-5277