MEMORANDUM
October 27, 1995
Garreth Cambe11, Construction Inspector
Howard L. Pafford, Utilities Superintenden
Water and Sewer Walk-Through for White Glove
Utilities staff has completed a walk-thru for the above
referenced project this morning and the following items were
found to be deficient.
*Needs new valve lid in roadway
*Uncover all fittings in meter boxes,covered with water
*Uncover both double checks and expose all fittings
*Fire hydrant valve needs a concrete pad
*New manhole needs rainpan
Please ensure that each of these items are corrected prior to
acceptance of this project.
HLP/hp