Loading...
White Glove-CS 951027COPPELL UTILITIES DATE: TO: FROM: RE: MEMORANDUM October 27, 1995 Garreth Cambe11, Construction Inspector Howard L. Pafford, Utilities Superintenden Water and Sewer Walk-Through for White Glove Utilities staff has completed a walk-thru for the above referenced project this morning and the following items were found to be deficient. *Needs new valve lid in roadway *Uncover all fittings in meter boxes,covered with water *Uncover both double checks and expose all fittings *Fire hydrant valve needs a concrete pad *New manhole needs rainpan Please ensure that each of these items are corrected prior to acceptance of this project. HLP/hp