Loading...
White Glove-CS 940628HENNESSEY ENGINEERIf'G, INC. 1409 THIRD AVENUE · CARROLLTON, TEXAS 75OO6-6912 (214) 245-9478 · FAX (214) 245-7087 June 28, 1994 Mr. Michael Martin, E.I.T. Engineering Department P.O. Box 478 City of Coppell, Texas 75019 (214) 462-0022 Re: White Glove Express Addition File #9364 Dear Mr. Martin: Per our discussion on Monday, June 6, 1994, the drainage areas north of the White Glove site have been increased to accommodate the storm flows shown on sheet 36 on the "Denton Tap Road Improvements". Lone Star Gas Company has been notified regarding the temporary easement for construction of the sanitary sewer. The owner requests that the sanitary sewer be terminated in a clean out instead of a manhole since the car wash will be the only user of this line. To facilitate construction, the owner would like to install 8" of concrete in the left turn lane on 8" flex base. Several clarifications have been documented on the drawings, and we request approval of this set of construction documents so the owner may initiate construction of the facility. Yours sine , Pete Hennessey, P.E. President c: ~works~let95 b:~works~9364.WPS d604 ~ PETER HENNESSEY ~(~f~% ~ 33295 STRUCTURAL CIVIL PLANNING SURVEYING