Loading...
ST9801-CS000505Proje~t: Date: Time: CITY OF COPPELL, TEXAS PROGRESS MEETING AGENDA Coppell Road Paving, Drainage and Water Line Installation May 5, 2000 9:00 AM PROJECT ISSUES A. Utility Conflicts/Relocations (TXU ElectricfrXU Gas/Paragon Cable/GTE) B. Box Culvert Construction C. Storm Drain Construction D. Paving Issues · Temporary Patches · E-W Portion E. Communications with Property Ownera/Residents F. Detours and Traffic Control SCHEDULE ISSUES A. Revised Schedule B. Work Expected in Next Month? UPCOMING CALENDAR EVENTS A. Next Progress Meeting (Tentative): May 25, 9:00 am Sent by: FREESE & NIOHOLS 2149202565 05/08/00 3~6PM Job 607 Page 2/4 FREESE - NICHOLS Meetincj Minutes 19(R)-- 19q( ) I ,";96.. Ic.)69 Subject: Recorded by: Coppelt Road hnprovements Construction Meeting Keyin Yourig [)ate: May 5, 20(R) LotaLl o n: Coppell City Hall ~i ,,?. A!~.ndi~cs: I...arry Davis, Kent Collins, Mike Martin, Gar'y Pryor, Mike WayIs ' '" ~ :'~ ~{!ow~.ng i '::our u,,aer,,'ta,,aing of a,e subject ,nauer covered during a,e sukiect meeting. Thursday morning is the prefi~rred meeting time. Another meeting wi 11 be desired soon to discuss and resolve large issues. *The HOA has agreed to allow for the t~can tree at the channel to be rer'noved. 'l'hey desire an 8" live oak, or similar, tree for replacement. The Contractor has been asked to provide ;.l. price lilt' both a 6" and an 8" live oak guaranteed for l-year. HOA shall be responsible li.~: irrigation. *The GTE manhole lying beneath pave~ne. nt in the east/wesl portion of Coppeil Road 'must be relnoved or Irtodified. *GTE cable in conflict with inlet has still not been moved. *Channel construction ';and box progress are being held up by the tree. Need Ihis isstle resolved by Tuesday or Wednesday. *A inound of dirt is being stockpiled at the corner of Coppoll Road and Parkway. "lThc City desires this to be moved and used elsewhere, due to conflict with visibility triangle at the comer. FREESI.:, AN!.) NICHO1 ,S * 1701 N. MARKET STREET, SUH'E 500 ~, [)ALl,AS. '!"I:~XAS 752()2 2{}0 I TEI.F, PI lONE: 214-920-25(K} ® FAX: 214-920-2565 · FORM I)A rE: I I / 1 I It)9 Sent by: FREESE & NTCHOLS 2149202565 I 05/08/00 3~7PM Job 607 Page 3/4 Meeting Minutes C..oppell Road Reconstruction May 5, 2000 Page 2 The box bottom. will be constructed in a single pout'. This will require approximately 3 days minimum to cure. The walls will need approximately 7 days of curing time pdor to consm~ction of box top. The Contractor will need a tot~ of 17 days to construct the box culverts. This is ~ conflicting with the road closure time limit.. The City will autofiR a 7-day work week, if needed, ' ~o finish the box and re-o~n the road within the approved time limit. Work start tin'~s ~e 8 AM li.~r Saturday and 9 AM tier Supday. ~ ' .- ' ,-, ~ere ~e 7 storm drain m~mholes requ~hedby the Conw~tor lbr payment {~a p~17 5 in the )., ,, -,*Wherever possible, the City wishes Contractor t.o utilize completed inlets for drainage during ~. ' con stmction. . *The City needs copies of the field density reports from the Contractor. 14. *Pavement at approximate station 9+00 has .sunk aconsiderable amount and become a traffic hazard. "['his needs to be fixed or patched ~s soon as possible. The City would like fi~r the Contractor to store patching materials on the job ~ite. *The Contractor needs to certify batch plant. A cement truck mute will be required of the Ckmtractor by the City for approval. he Contr' r sha set and Ci c p~ ~,en~n~ ' ' ' ' t~~ a se t~~~ ~t Concrete shall have a heavy, baker broom finish. j6. j7. JiB. *C'.ontractor will need to coordinate construction at Mansions driveway with tbc owner. 'Fhe driveway will need to be poured in halves and written.e~onfirmation of concrete pavement stamp color, signed by the owner, shall be obtained by the contractor prior to placement. The ConU'actor will provide leave-outs m'ound valves, manholes, or ~my other appurtenance when l~rming and pouring concrete. These items will be adjusted anti concrete poured in these locations prior to opening hines to traffic. ., *Contractor will ma. ke sure the 121 message signs are working. ! 9f''~' 'R,.egarding the revised schedule, the City provide the contractor with any commen~s they migh~ "~i FREESE AND NICHOI.~$ · 1701 N. MAR~T STR~T SUITE 5~ · DALES. ~ "FEI_t~PHONE: 2 [4-92(}-25~ · FAX: 21~-920-2565 · FORM DA'H!: I 1/I 1/99 ! [ '1 [ ' ~' i ' I Sent by: FREESE & NTCHOLS 2149202565 05/08/00 ,;}~8PM Job 607 · 3 . Page 4/4 Meeting Minutes Coppell Road Reconstruction May 5, 2000 ['age 3 , " ' '. 'have. · 'Z' · ,%The plans do not address adjusting the manhole rim elevation at the Cop~lt Road curve. The ". ' ' City needs a price t}om the contractor'to address this item. ' ~j~.bpd~ture monthly estimates, Contra~41~en¢~Tity t~ original ancTF~ ~copy for review · Action Item - END - I:,'REESE AND NK HOI.~S · |?01 N. MAR'~ET STREET, SUITE 500 · DAI.t..AS, TEXAS 75202.2(.R)I "['EI.EPHONE: 214-920-2500 · FA.X: 214-920-2565 · FORM DATE: t I/I I,n)9 ............ t I' T'