Loading...
White Glove-CS 940428COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: April 28, 1994 Gary Sieb, Director of Planning & Community Services Steven G. Goram, Director of Public Works White Grove Express, Final Plat Plan Review Comments o Contact Rick Wieland with Parks and Recreation (462-8495) prior to disruption of irrigation service along Denton Tap Road (Sheet C-1 of Construction Plans). Install 4' diameter manhole instead of cleanout at Station 3+31.61 (Sheet C-2 of Construction Plans). Proposed 20' drainage easement through property needs to be private. (Sheet C-2 of Construction Plans). Delete meter installation details for FM and DC meters (Sheet SD-19 of Standard Construction Details). Require standard construction detail for 2" meter (Sheet SD-19 of Standard Construction Details). Landscape and irrigation plans need to conform to Streetscape Plan. Water and waste water impact fees to be assessed (final plat sheet). Irrigation controller will have freeze protector, rain sensor, and surge protection device. Landscape and irrigation plans are required to be included in the final construction plans. SGG/bc cc: Kenneth Griffin, Assistant City Manager/City Engineer Central File WHITEGR.SG